Floodplain restoration of the river Slampe, Latvia

Year of issue
2025
Summary

The floodplain restoration of the River Slampe was carried out in 2005 within the Kemeri National Park, Latvia. The aim of the measure was to re-establish the natural floodplain regime of the Dunduri meadows by reconnecting them to the hydrological cycle of the river Slampe, which had been previously channelised. The restoration involved closing the outlet of the straightened riverbed, reconstructing approximately 2.1 km of the riverbed in a new meandering course of 4.65 km, and constructing a small dam at the downstream end near the Slampe-Kauguri canal. This raised the water level by about one metre, allowing for natural flooding of about 105 ha of floodplain meadows during seasonal high flows.

The project significantly improved floodplain hydrology and restored natural habitats. In the short term, early ecological results included sedimentation, island formation, and recolonisation by aquatic species. The reconnection of the river and floodplain also contributed to rewetting of previously drained meadows. However, monitoring two to three years after implementation indicated that ecological water quality had not improved significantly. The absence of riparian vegetation and high nutrient inflow from surrounding agricultural lands limited progress towards good ecological status. Dominance of filamentous green algae (Cladophora glomerata) was noted.

As of recent assessments (2021–2023), the Slampe River is still classified as a heavily modified water body, with potential to reach good ecological status depending on further catchment-wide measures. Long-term maintenance and monitoring have continued under post-LIFE frameworks, although no major restoration works have been added since. The site remains under active conservation within the Kemeri National Park.

Overall, the restoration successfully achieved hydrological and habitat objectives, but further actions may be required to improve water quality and riparian structure.

Photo Gallery
Location
56.8299499, 23.4008938
Project
NWRM
National ID
Latvia_01
Sector
Hydromorphology
Installation Date
2005
Contact
Ilze Kalvane, BEF Latvia

Overview

Location of the project
Along the river Slampe
Country
Latvia
NUTS2 Code
Latvija
Sponge measures implemented in the case study
Re-meandering
Floodplain restoration and management
Stream bed re-naturalisation
Objectives
Reconnect floodplain meadows: Restore natural flooding to approx. 105 ha of Dunduri meadows in Kemeri National Park.
Reconstruct river course: Replace a straightened 2.08 km section with a new 4.65 km meandering channel.
Raise water levels: Build a small dam to raise water level by ~1 meter, enabling seasonal overflows.
Enhance habitats: Create diverse in-stream structures (islands, riffles, pools) to support biodiversity recovery.
Support birdlife: Improve conditions for migratory waterbirds (e.g., swans, herons, ospreys) through wetland expansion.
Excavation volume: Approx. 23,880 m³ of soil removed to shape the new riverbed.
Involved partners
Authority type Authority name Authority role Comments Authority responsibility
Other Ķemeri National Park Initiation of the measure Project manager and land manager after the implementation Responsible
Private property owners Meliorprojekts Ltd Implementation Elaboration of technical project, supervision of the practical implementation Supporting
Private property owners Visko Ltd Implementation Practical implementation of the meandering technical project Supporting
Private property owners Carl Bro Ltd Monitoring Assessment of ecological status according to benthic macroinvertebrates after the project implementation Supporting
Documents
Document

Site Information

Climate Zone
Cool temperate moist
Precipitation
650.00 mm
Temperature (°C)
6.00 °C
Elevation range
8
Vegetation class
The area is predominantly covered by grass- and tall-herb turf, dominated by nitrophilous species such as Dactylis glomerata, Calamagrostis epigejos, and Artemisia vulgaris. Wet depressions host reed and reed canary grass. Vegetation reflects early successional, nutrient-rich floodplain meadows.
WFD Ecological status
Moderate
WFD Chemical status
Failing to achieve good
Water quality status
Water quality status according to benthic macroinvertebrates was assed as moderate in 1998. Concentrations of nutrients (N and P) were significantly increased in some measurements. Assessed aquatic vegetation showed richness of the nutrients in the water.

Design and Implementation

Project scale
Micro
Project scale specifications
2.1 km long stretch of the channeled river was turned in to 4.6 km long meandered stream. Natural floodplain grasslands resorted in 105 ha
Project area
105 ha
Area subject to Land use change or Management/Practice change (ha)
105.00 ha
Size
4.60
Size unit
km
Principles
- to restore hydrological regime characteristic to floodplain in surrounding meadows;
- costs;
- existing relief.
Constraints
Lack of experience and knowledge of all stakeholders, acceptance of the neighbouring landowners.
Favourable preconditions
Measures implemented in protected area and the landowner is the state

Financing

Total cost
144547.81 €
Total cost information
144 547.81 € Without administrative and personnel costs
32 597,15 € Technical project and implementation
111 950,66 € In total 163,2 ha purchased land
Costs operation maintenance information
It is not calculated, but there is only visual monitoring carried out by inspectors of Ķemeri national park.
Information on Economic costs additional
Economic loss not calculated, but before restoration of meanders and floodplains, surrounding lands were used very extensively by agricultural purposes.
Financing authorities
Authority name Type of funding Comments
European Union EU-funds: LIFE+ EC LIFE Nature programme
Latvia National funds Latvian Environmental Protection Fund
Compensations
Non

Policy and Governance

Policy description
In order to make Dunduru meadows more suitable for agriculture, the course of River Slampe was straighten in 1970. Since 1997 Dunduru meadows are included in newly established Ķemeri National park. Maintenance and restoration of the natural assets are the main goals for the park and restoration of the Dunduru meadows helped to restore natural floodplain grasslands ensuring suitable habitat for several species of EU and Latvian importance.
Land ownership
State of Latvia
Policy targets
Improved Biodiversity
Groundwater Recharge
Target remarks
Restoration of floodplain hydrological regime in Dunduru meadows
Policy impact
Directive Relevant impact
WFD identified pressure Altered habitats due to hydrological changes
Other EU HBD – Habitat and Bird directive
Part of a wider plan
Non
Public consultation
Non
Has contractual arrangements
Non

Impacts and Monitoring

Monitoring System

Monitoring requirements
Monitoring of the groundwater level was planned to be carried out in 13 boreholes at the river Slampe once in a month, but due to financial constraints the water level records are taken very seldom.
Monitoring parameters
Level of the groundwater

Maintenance

Maintenance requirements
Controlling the condition of the dam before estuary of the River Slampe. Responsible authority is the Ķemeri National Park.

Impact Assessment Methodology

Performance impact assessment method
Edge of Field/Plot
Performance impact estimation information
Monitoring of the groundwater level was planned to be carried out in 13 boreholes at the river Slampe once in a month, but due to financial constraints the water level records are taken very seldom.
Biophysical impact assessment method
The assessment of the ecological status is defined in the national legislation based on the WFD requirements.

Socio-economic Impacts

Ancillary benefits information
Fish and plants, tourism, recreation, and others

Biophysical impacts: Hydrology

Information on retained water
Water retention is increased. The measure ensured that territories are flooded during the spring : 150 ha of restored floodplain meadows. 30 % of restored meadows were flooded by first spring floods, but flooded area depends from the floods volume. The restoration raised mean water levels in the downstream Skudrupīte floodplain by approximately 0.45-0.9 m, enhancing seasonal inundation dynamics.
Remeandering work created diversified structure : introduction of meanders, islets, various channels.

Biophysical impacts: Biodiversity

Improved biodiversity
Oui
Information on improved biodiversity
Restored floodplain meadows in 105 ha, which is important resting and feeding place for migratory water birds and re-meandered river is suitable feeding place for Ciconia nigra (bird species of EU importance). At the same time observed 4 individuals.

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Neutral impact-no change in WQ status
Information on water quality overall
Water quality according to water biological quality elements (macroinvertebrates and aquatic macrophytes) are not increased. Early monitoring (2–3 years post-restoration) noted persistent high nutrient input, dominance of Cladophora glomerata, and limited improvement of ecological water quality.
Soil quality overall improvements
N/A info

Biophysical impacts: Others

Ecosystem impact climate regulation
No information available

Lessons Learned

Key lessons
Expert on hydrology has to be involved in the development of the technical project.
Hydrological and water quality assessments have to be carried out prior to the re-meandring.

Restoring physical processes does not guarantee ecological quality. Despite restored flows, ecological water quality remained poor due to external nutrient inputs and absence of riparian vegetation. Catchment-wide nutrient management is essential to support in-stream ecological recovery.

Vegetation structure takes time to develop. Recolonisation occurred quickly, but vegetation remained dominated by early-successional, nitrophilous species, limiting biodiversity and filtration functions. Long-term management (e.g. grazing, mowing) is key to guiding vegetation succession toward target meadow communities.

Post-restoration monitoring is critical. The project included early monitoring, but lacked long-term, quantitative follow-up on biodiversity, water quality, or infiltration rates. Future projects should plan monitoring over at least 10–15 years, especially in slow-recovering ecosystems.

Restoration must be embedded in landscape-scale planning. Continued degradation from surrounding agricultural runoff limited water quality improvements. Successful restoration requires coordination with upstream land use practices (buffer zones, farming regulations, etc.).

Multipurpose land use (e.g. grazing) supports maintenance. The use of Konik horses and cattle helped manage vegetation cost-effectively, showing that agro-ecological approaches can maintain restored functions without intensive human input.
Barriers
Barrier type Barrier role Comments
Existing institutional framework Main barrier Long procedures to obtain the permit for implementation of water retention measures.
Attitude of decision makers Secondary barrier Negative attitude of the Ministry of Agriculture, since river stretch is the important subject to ensure drainage in the catchment.
Attitude of relevant stakeholders Secondary barrier Attitude of neighboring landowners who are not in favor of over flooded lands
Limited staff and consultant knowledge Secondary barrier Lack of experience of all involved stakeholders
Drivers
Driver type Driver role Comments
Other Main driver Availability of financial resources and financing potential to implement such measures.
Success factors
Success factor type Success factor role Comments
Financing possibilities Main factor Availability of financial resources and financing potential to implement such measures.
Flexibility / Adaptability
Implemented project had numerous mistakes in technical project that have to be improved.
Transferability
Taking into account EU Policy goals on biodiversity to restore 15 % of depredated land up to 2020, goal of the WFD to reach good water quality, goals of the FD and local conditions, remeandering and floodplain restoration (for water retention and nutrients capture) is recommendable to implement in a slowly flowing streams within the agricultural lands.