River basin management of the Ill, France
Along the Ill between Colmar and Strasbourg, a basin-wide programme combines classical flood protection (dykes, optimisation/automation of barrages) with NWRM (riparian forest restoration, oxbow reconnections, stream re-naturalisation) to lower flood peaks, increase storage, curb erosion and enhance biodiversity. Initiated by the former Alsace Region, delivery today is ensured by the mixed association now called “Rivières de Haute-Alsace” (created in 2017; name adopted in 2020). The 2014–2024 Ill management scheme (~€19 m) included major works at Erstein’s Steinsau barrage: full refurbishment with a fish pass equipped for video-counting and six fish-friendly Archimedean screws for hydropower; Steinsau and nearby Boeschey are presented locally as multi-functional (flood safety, ecology, leisure, energy). The strategic framework continues in cycle-2 planning: the 2022–2027 Flood Risk Management Plan for Rhin-Meuse keeps priority on risk reduction, nature-based retention and space for rivers, while the SAGE “Ill–Nappe–Rhin” remains the operational reference (CLE renewed by prefectural order on 16 May 2024). Natura 2000 objectives in the Grand Ried also support reconnection and management of side arms to sustain floodplain habitats and functions.
Overview
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Other | Region of Alsace | Initiation of the measure | Original initiator of the measures, the region was also responsible for financing. | — |
| Regional / sub-national water authority | AERM (Agence de l'eau Rhin-Meuse) | Financing | One of the main project financers | Supporting |
| Other | Conseils Généraux du Bas et Haut Rhin | Financing | Touristic development | Supporting |
| Other | ADEME (Environment and Energy Agency) | Financing | Financial support of hydropower projects (deconstruction off barrages, installation of fish passes...) | — |
| Other | Municipalities | Other | Maintenance/ development of touristic activities and communal hydropower stations | — |
| Local water authority | Syndicat Mixte du Bassin de l'Ill aux Rivières de Haute Alsace | Implementation | Current project owner and responsible organization for river basin management in the area. | Responsible |
Site Information
Design and Implementation
Financing
Policy and Governance
| Activity stage | Activity type | Key issues |
|---|---|---|
| Implementation phase | Guide "rights and duties of riparians" | This is foreseen in project planning in order to educate the public. |
| Comments |
|---|
| The project has to pass the autorisation steps of the French Water Law. Moreover it has to be proven that the project is of public utility and of public interest in order to mobilize national funds |
Impacts and Monitoring
Monitoring System
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
The Ill basin management is still ongoing, with frequent subprojects. For example a 2019 flood plain reconnexion was carried out (with €850,000 funding from AERM) along with the creation of 0.75 ha of wetlands, 4.2 ha of woods, 3.5 ha of other vegetalized space). In 2023, a natural bank protection was carried out in Réguisheim for a total cost of €50,000.
| Driver type | Driver role | Comments |
|---|---|---|
| Legal obligations | Main driver | The good ecological status of the Ill has to be achieved. |
| Past flooding events | Main driver | Due to regular floods in winter and spring there are severe damages on pastures and fields. Valuable agricultural land is lost (approx. 150 ha in 10 years). Agriculture is a very important economic branch with a gross margin of 16 million € |
| Public pressure | Main driver | Flood protection is partly missing for entire villages (Kogenheim 1000 inhabitants). Dykes have weak points and need to be renovated. |
| Balancing different objectives | Secondary driver | Water and terrestrial hiking pathways are missing. Barrages are not passable, and dangerous due to a lack of signalisation. Fishing associations wish a better accessibility to the river. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Financing possibilities | Main factor | Since the project is in the implementation phase, there is no sufficient information. |