River basin management of the Ill, France

Year of issue
2025
Summary

Along the Ill between Colmar and Strasbourg, a basin-wide programme combines classical flood protection (dykes, optimisation/automation of barrages) with NWRM (riparian forest restoration, oxbow reconnections, stream re-naturalisation) to lower flood peaks, increase storage, curb erosion and enhance biodiversity. Initiated by the former Alsace Region, delivery today is ensured by the mixed association now called “Rivières de Haute-Alsace” (created in 2017; name adopted in 2020). The 2014–2024 Ill management scheme (~€19 m) included major works at Erstein’s Steinsau barrage: full refurbishment with a fish pass equipped for video-counting and six fish-friendly Archimedean screws for hydropower; Steinsau and nearby Boeschey are presented locally as multi-functional (flood safety, ecology, leisure, energy). The strategic framework continues in cycle-2 planning: the 2022–2027 Flood Risk Management Plan for Rhin-Meuse keeps priority on risk reduction, nature-based retention and space for rivers, while the SAGE “Ill–Nappe–Rhin” remains the operational reference (CLE renewed by prefectural order on 16 May 2024). Natura 2000 objectives in the Grand Ried also support reconnection and management of side arms to sustain floodplain habitats and functions.

Photo Gallery
Location
48.583148, 7.747882
Project
NWRM
National ID
France 05 light
Sector
Agriculture
Implementation status
Completed
Contact
Sabine Tutte, ACTeon

Overview

Location of the project
Ill floodplain between Colmar and Strasbourg (Grand Ried), e.g., around Erstein’s Steinsau barrage near the A35 corridor
Country
France
NUTS2 Code
Alsace
Sponge measures implemented in the case study
Meadows and pastures
Forest riparian buffers
Stream bed re-naturalisation
Reconnection of oxbow lakes and similar features
Removal of dams and other longitudinal barriers
Objectives
The mobility of the river shall be preserved without encouraging further erosion. Therefore a land allocation process starts, alluvial forests are planted (68 km) and where possible barrages and bank stabilisations are deconstructed. Moreover, 15 hydraulic annexes are reconnected to the river in order to improve water storage capacity and solve water distribution problems. A discharge rill is constructed to the forest near Colmar in order to inundate the wood during flood events and protect fields and communities.
Involved partners
Authority type Authority name Authority role Comments Authority responsibility
Other Region of Alsace Initiation of the measure Original initiator of the measures, the region was also responsible for financing. —
Regional / sub-national water authority AERM (Agence de l'eau Rhin-Meuse) Financing One of the main project financers Supporting
Other Conseils Généraux du Bas et Haut Rhin Financing Touristic development Supporting
Other ADEME (Environment and Energy Agency) Financing Financial support of hydropower projects (deconstruction off barrages, installation of fish passes...) —
Other Municipalities Other Maintenance/ development of touristic activities and communal hydropower stations —
Local water authority Syndicat Mixte du Bassin de l'Ill aux Rivières de Haute Alsace Implementation Current project owner and responsible organization for river basin management in the area. Responsible

Site Information

Climate Zone
Cool temperate dry
Precipitation
550.00 mm
Temperature (°C)
10.00 °C
Runoff
58.00 mm
Elevation range
151 m
Vegetation class
Alluvial riparian forests and floodplain meadows/roselières of the Grand Ried; ongoing riparian planting and side-arm reconnections are policy objectives.
WFD Ecological status
Bad
WFD Chemical status
Failing to achieve good
Water quality status
Agricultural nutrients/pesticides, hydromorphological alteration by structures, and groundwater stress; several surface-water bodies in the Upper Rhine sector show significant “substances” pressures.

Design and Implementation

Project scale
Meso
Project scale specifications
River-reach/basin management between Colmar and Strasbourg, coordinating barrages, dyke works, riparian forests, and reconnection of multiple side arms across many communes.
Project area
12000
Principles
Multifunctionality (flood safety + ecology + recreation + energy); restoration/reconnection of floodplain units; automatisation/optimisation of barrages; fish passage. The Steinsau fishway has 8 pools (15 cm drops); hydropower via six Archimedean screws (~1 GWh/yr). No design storm or storage volumes are published in the sources.
Factor constraints
Very low-gradient alluvial plain (Grand Ried) with high, near-surface Rhine aquifer; wide floodplain enables reconnections but silting can reclog side arms in 10–15 years; mixed ownership mosaic.
Constraints
Partly dams have to be constructed or reinforced, otherwise the risk of severe inundation would not be justifiable. In order to maintain the natural mobility of the river, land of farmers has to be reallocated.

Financing

Total cost
25500000.00 €
Total cost information
19 to 32 million Euros: Next to NWRMs, construction costs for dykes and improvement of barrages and facilities appear. Moreover, the touristic branch is supported by several projects, and hydropower is encouraged as well.
Costs investment
12500000.00 €
Costs investment information
10 to 15 million Euros: plantation of forests, land acquisition, dyke renovation.
Costs operation maintenance information
No data available
Economic costs additional
300000.00 €
Information on Economic costs additional
Total costs for publicity
Administrative annual costs
340000.00 €
Administrative annual cost information
Installation of counting stations on fish passes.
Financing authorities
Type of funding Comments
EU-funds: Rural development funds Support of sustainable farming (crop rotation, green cover...).
Local funds Renovation of dykes, touristic development.
National funds Support of hydropower projects.
Sub-national funds Renovation of barrages, NWRM, Agro-environmental measures.
Sub-national funds Publicity, support of hydropower, touristic development.
Compensations annual
2000000.00 €
Compensations annual information
Support of farmers by agro-environmental measures (encouragement of green cover, pastures, meadows, crop rotation).
Compensations scheme information
The agricultural compensations made in the context of EU CAP Pillar 2.

Policy and Governance

Policy description
The flood protection of commuities and fields is partly unsufficient. Due to erosion there is a remarkable loss of usable agricultural surface. Barrages and hydropower plants disturb the sediment transport of the river and are not passable for fish and boats. A natural alluvial forest is often missing and shall be restored for water quality improvement and fight against invasive species.
Land ownership
The Ill is state public river from Colmar to Strasbourg; key barrages (Steinsau, Boeschey, Kraft) are owned/managed by Région Grand Est. Floodplain forests in the Grand Ried are mostly public (state & communal), with some private parcels.
Policy targets
Peak-flow reduction
Increase Water Storage
Erosion Control
Improved Biodiversity
Oher Societal Benefits
Pressure remarks
The flood protection for some communities is missing, barrages and hydropower plants are not passable for fish and boats.
Part of a wider plan
Non
Public consultation
Non
Consultation activities
Activity stage Activity type Key issues
Implementation phase Guide "rights and duties of riparians" This is foreseen in project planning in order to educate the public.
Has contractual arrangements
Non
Contractual arrangements
Comments
The project has to pass the autorisation steps of the French Water Law. Moreover it has to be proven that the project is of public utility and of public interest in order to mobilize national funds

Impacts and Monitoring

Monitoring System

Monitoring parameters
Stations for counting fish are installed next to barrages and hydropower plants.

Socio-economic Impacts

Direct benefits information
During the project the tourism branch is supported by improved water/ terrestrial trekking ways, better recreational spaces (bivouacs, camping, hotel restaurant access).
Ancillary benefits information
Without the management plan, 6.1 - 8 Mio € per year have to be foreseen as costs for floods.

Biophysical impacts: Hydrology

Information on retained water
By reconnecting hydraulic annexes, installing discharge rills to flood forests and reallocation of land neighboring the river, the water retention capacity gets increased.
Information on runoff reduction
This shall be achieved by natural bank stabilisation and deconstruction of old barrages. By purchasing land a "mobility space" for the river shall be guaranteed.
Information on Restoring hydraulic connection
Connections are restored.

Biophysical impacts: Biodiversity

Information on improved biodiversity
Control campaigns for Himalayan Balsam and Japanese Knotweed; plantation of alluvial forests (high species diversity due to diverse habitats).

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
N/A info
Information on water quality overall
This shall be achieved by restoring 68 km of alluvial forests next to the Ill.
Soil quality overall improvements
N/A info

Biophysical impacts: Others

Information on ecosystem impact climate regulation
No information available

Lessons Learned

Key lessons
This management plan combines classical flood protection measures (construction of dykes, automatisation/optimization of barrages) with NWRM. It is difficult to have information on success (especially quantitative data) and monitoring. However, ecosystem services are taken into account to justify the measures.

The Ill basin management is still ongoing, with frequent subprojects. For example a 2019 flood plain reconnexion was carried out (with €850,000 funding from AERM) along with the creation of 0.75 ha of wetlands, 4.2 ha of woods, 3.5 ha of other vegetalized space). In 2023, a natural bank protection was carried out in Réguisheim for a total cost of €50,000.
Barriers
Barrier type Barrier role
Attitude of decision makers Secondary barrier
Drivers
Driver type Driver role Comments
Legal obligations Main driver The good ecological status of the Ill has to be achieved.
Past flooding events Main driver Due to regular floods in winter and spring there are severe damages on pastures and fields. Valuable agricultural land is lost (approx. 150 ha in 10 years). Agriculture is a very important economic branch with a gross margin of 16 million €
Public pressure Main driver Flood protection is partly missing for entire villages (Kogenheim 1000 inhabitants). Dykes have weak points and need to be renovated.
Balancing different objectives Secondary driver Water and terrestrial hiking pathways are missing. Barrages are not passable, and dangerous due to a lack of signalisation. Fishing associations wish a better accessibility to the river.
Success factors
Success factor type Success factor role Comments
Financing possibilities Main factor Since the project is in the implementation phase, there is no sufficient information.
Transferability
High to other lowland rivers with levees/dams—requires strong basin governance, land re-allocation capacity, and long-term O&M; watch for side-arm silting that may close reconnections within 10–15 years.

Sources