Restoration of the Black Marsh of Saint-Coulban
Since 1984, the Ille-et-Vilaine Hunting Federation has been restoring a 550-ha peat marsh heavily drained and cropped in the 20th century. Maize fields were converted to hay meadows and pasture through agreements with farmers; a peat bog and a reedbed were restored; and water levels are artificially managed to enable winter flooding. The Méleuc was re-routed into a more natural course. The goals (improve staging conditions for migratory waterbirds and recover marsh functions (carbon sequestration, natural water purification)) have been met for bird use, while water-level management still needs optimisation. Recent sources add that the site forms part of the Ramsar “Bay of Mont-Saint-Michel” and its Natura 2000 network; roughly 380 ha are held by FDC35 and the Foundation for the Protection of Wildlife Habitats. A major reedbed project (“Bois de la Mare”) cleared poplar/spruce to restore ~16 ha of phragmites as compensation linked to the Mont-Saint-Michel maritime project, awarded France’s Ecological Engineering Prize in 2018. Management relies on mowing then grazing via agreements with about twenty farmers; hunting is excluded except targeted wild-boar control, and guided public activities are now offered. In 2021 the regional scientific council (CSRPN) issued a favourable opinion toward designation as a Regional Nature Reserve over a 768-ha perimeter (process ongoing). Winter counts report up to c. 6,000 anatids.
Overview
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Other | Hunting Federation of Ille-et-Vilaine Department | Initiation of the measure | — | Responsible |
| Local water authority | Authorized Syndicate Association (ASA) Digues et Marais du Dol | Other | The marsh management organization | Responsible |
| Regional / sub-national water authority | Agence de l'Eau Loire Bretagne | Financing | Provides financial support for land acquisition and restoration works | Supporting |
Site Information
Design and Implementation
- sluice gate for flooding in winter
- maintain minimum water levels in summer
- Bring back the river (Meleuc) into its original bed
- drain at the end of spring, ideally on June 1st
This last pillar is not followed, as the opening of sluice gates is on 1st of april instead.
However, the complete restoration of the hydrological functioning of the marsh has not been completed. The measures therefore need to be complemented by water level management by means of a valve.
Financing
Policy and Governance
Until 1950, it included one residual lake (the Mare de St-Coulban), before it was dried out. The marsh has since been drained by the Meleuc river, which shows a strong recalibration. Before the project, the marsh was subject to an intensive agricultural use, mainly for corn. It included a former peat bog that had been mined and drained.
Improve the marsh's carrying capacity for biodiversity, and in particular birdlife;
Improve the regulatory role of the marsh (carbon sequestration in peat, natural water purification);
Allow educational and recreational uses;
Enhance the value of the Hunting Federation of Ille-et-Vilaine Department action on the management of sensitive heritage habitats;
Collaborate with agricultural stakeholders.
| Wider plan type | Wider plan focus | Name |
|---|---|---|
| Catchment-based | Environment & Biodiversity | Wetlands of the Bay of Mont-Saint-Michel |
| Arrangement type | Responsibility | Name | Role | Comments |
|---|---|---|---|---|
| Contractual agreement | — | Collective agreement between the Hunting Federation and the Authorized Syndicate Association "Digues et Marais du Dol". | — | Agreement on the water management of the marshland: sluice gates to be opened on April 1st each year. Minimal water levels are to be maintained in summer and winter in the marsh. |
| Contractual agreement | In exchange for free access to ome marshland areas, farmers commit to comply with strict land-use practices, including: - Adherence to mowing and grazing calendars - Prohibition of phytosanitary products, fertilizers, and supplemental feeding - Preservation of hedgerows and flooded habitats | Collective agreement between the Hunting Federation and the farmers operating marshland areas. | — | This agreement has to be approved yearly, from May 1st to November 1st. In 2024, 260 ha were exploited by 21 different farmers. |
| Institutional arrangement | The Water Agency finances the Federation for land aquisition and public animations, in exchange for respecting good practices. | Territorial contract between the Lorie-Bretagne Water Agency and the Hunting Federation of Ille-et-Villaine | — | — |
| Organisational arrangement | An agreement on the marsh management in construction. It is supposed to include automatic managemetn system for the valves. | Règlement d'eau (project, 2025) | It aims at resolving the growing tensions between the Hunting Federation and the local authorities and farmers. | An agreement shall be reached in 2025, or a decision will be taken by the prefect. |
Impacts and Monitoring
Monitoring System
Physico-chemical monitoring: A physico-chemical probe is installed on the marsh and measures water transparency, conductivity, dissolved oxygen, water pH, water height and silt depth. Recurring samplings are made by the hunting federation.
Ecological monitoring: A monitoring of amphibians, reptiles (laying 80 herpetological plates), fish and aquatic invertebrates was carried out. The Large Marsh Grasshopper population has been monitored since 2019.
The floral procession evolution is monitored in oligotrophic and peaty areas by applying a National Museum of Natural History methodology to record the communities evolution.
Bird counts have been carried out by the Hunting Federation of Ille-et-Vilaine Department for 30 years. Since 2016, they have been supplemented by a winter waterbird count, a monitoring of the reedbed passerines, ardeidae and anatidae reproduction. A mapping of the singing passerines is also carried out. Monitoring of odonates and butterflies was carried out between 2017 and 2022.
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
The creation of a natural regional parc was helped by the presence of the Black Marsh, as a good argument on nature conservation in the territory.
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
An increase in waterbirds halting;
An increase in breeding passerines;
An evolution of the common flora towards a more specific procession of peaty environment flora;
An increase in the geographical distribution of the Large Marsh Grasshopper, which is a good indicator of a well-preserved peat bog ecosystem.
The restoration of the reedbed has allowed the installation of paludiculous birds, like the Marsh Warbler which has only a few nests in Bretagne.
Biophysical impacts: Water & Soil Quality
In 2022, massive drought caused water quality and qantity problems, with cyanobacteria blooms in particular.
Biophysical impacts: Others
Lessons Learned
A public outreach program (for schools, events) provides additional social benefits.
| Driver type | Driver role | Comments |
|---|---|---|
| Other | Secondary driver | Recognition of the work efficiency and importance leads to more public acceptance for further rstoration work. For example : - The 2015-2016 reedbed restoration in the marsh has won the 2018 Ecological Engineering Prize in Category 5 – "Habitat Restoration" (A-IGEco yearly contest). - The improved biodiversity lead to the designation of the site as a Sensitive Natural Area (ENS) by the Ille-et-Vilaine Department in 2024 |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Attitude of decision makers | Main factor | Determination of the Hunter Federation of Ille-et-Vilaine, to keep the restoration and managemetn project running event through constant oppositions of the local authorities and farmers. |
| Other | Main factor | Land control and capacity for action of the federation : No need to get different opposing actors to agree on every little action. |
| Financing possibilities | Secondary factor | The access to many financing projects (funds, compensation measures of the Mount St Michel Bay, etc.) accross the years allowed to reach amitious goals of restoration. |
The most damaged areas are where there is the greatest gain in regeneration.