Floodplain restoration of the river Slampe, Latvia
The floodplain restoration of the River Slampe was carried out in 2005 within the Kemeri National Park, Latvia. The aim of the measure was to re-establish the natural floodplain regime of the Dunduri meadows by reconnecting them to the hydrological cycle of the river Slampe, which had been previously channelised. The restoration involved closing the outlet of the straightened riverbed, reconstructing approximately 2.1 km of the riverbed in a new meandering course of 4.65 km, and constructing a small dam at the downstream end near the Slampe-Kauguri canal. This raised the water level by about one metre, allowing for natural flooding of about 105 ha of floodplain meadows during seasonal high flows.
The project significantly improved floodplain hydrology and restored natural habitats. In the short term, early ecological results included sedimentation, island formation, and recolonisation by aquatic species. The reconnection of the river and floodplain also contributed to rewetting of previously drained meadows. However, monitoring two to three years after implementation indicated that ecological water quality had not improved significantly. The absence of riparian vegetation and high nutrient inflow from surrounding agricultural lands limited progress towards good ecological status. Dominance of filamentous green algae (Cladophora glomerata) was noted.
As of recent assessments (2021–2023), the Slampe River is still classified as a heavily modified water body, with potential to reach good ecological status depending on further catchment-wide measures. Long-term maintenance and monitoring have continued under post-LIFE frameworks, although no major restoration works have been added since. The site remains under active conservation within the Kemeri National Park.
Overall, the restoration successfully achieved hydrological and habitat objectives, but further actions may be required to improve water quality and riparian structure.
Overview
Reconstruct river course: Replace a straightened 2.08 km section with a new 4.65 km meandering channel.
Raise water levels: Build a small dam to raise water level by ~1 meter, enabling seasonal overflows.
Enhance habitats: Create diverse in-stream structures (islands, riffles, pools) to support biodiversity recovery.
Support birdlife: Improve conditions for migratory waterbirds (e.g., swans, herons, ospreys) through wetland expansion.
Excavation volume: Approx. 23,880 m³ of soil removed to shape the new riverbed.
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Other | Ķemeri National Park | Initiation of the measure | Project manager and land manager after the implementation | Responsible |
| Private property owners | Meliorprojekts Ltd | Implementation | Elaboration of technical project, supervision of the practical implementation | Supporting |
| Private property owners | Visko Ltd | Implementation | Practical implementation of the meandering technical project | Supporting |
| Private property owners | Carl Bro Ltd | Monitoring | Assessment of ecological status according to benthic macroinvertebrates after the project implementation | Supporting |
Site Information
Design and Implementation
- costs;
- existing relief.
Financing
32 597,15 € Technical project and implementation
111 950,66 € In total 163,2 ha purchased land
Policy and Governance
| Directive | Relevant impact |
|---|---|
| WFD identified pressure | Altered habitats due to hydrological changes |
| Other EU | HBD – Habitat and Bird directive |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Biophysical impacts: Hydrology
Remeandering work created diversified structure : introduction of meanders, islets, various channels.
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Hydrological and water quality assessments have to be carried out prior to the re-meandring.
Restoring physical processes does not guarantee ecological quality. Despite restored flows, ecological water quality remained poor due to external nutrient inputs and absence of riparian vegetation. Catchment-wide nutrient management is essential to support in-stream ecological recovery.
Vegetation structure takes time to develop. Recolonisation occurred quickly, but vegetation remained dominated by early-successional, nitrophilous species, limiting biodiversity and filtration functions. Long-term management (e.g. grazing, mowing) is key to guiding vegetation succession toward target meadow communities.
Post-restoration monitoring is critical. The project included early monitoring, but lacked long-term, quantitative follow-up on biodiversity, water quality, or infiltration rates. Future projects should plan monitoring over at least 10–15 years, especially in slow-recovering ecosystems.
Restoration must be embedded in landscape-scale planning. Continued degradation from surrounding agricultural runoff limited water quality improvements. Successful restoration requires coordination with upstream land use practices (buffer zones, farming regulations, etc.).
Multipurpose land use (e.g. grazing) supports maintenance. The use of Konik horses and cattle helped manage vegetation cost-effectively, showing that agro-ecological approaches can maintain restored functions without intensive human input.
| Driver type | Driver role | Comments |
|---|---|---|
| Other | Main driver | Availability of financial resources and financing potential to implement such measures. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Financing possibilities | Main factor | Availability of financial resources and financing potential to implement such measures. |