Rain gardens for the Day Brook, UK
A rain garden was installed along the verges of a residential road in Nottingham, England. The purpose of the rain garden was to control the rate of runoff and water quality reaching the downstream watercourse (Day Brook).
A total of 21 linear rain gardens were constructed within the grass verge of Ribblesdale Road, to manage surface water run off within the catchment of Day Brook. Water contained within the gardens soaks away rather than entering the local surface water sewer which flows to the Day Brook. Construction was completed in May 2013.
The Nottingham rain gardens reduced surface water runoff by up to 30%. They help lower local flood risk, reduce combined sewer overflow, and improve water quality through filtration. Over 150 rain gardens were installed, enhancing biodiversity, creating attractive green space, and supporting pollinators. Maintenance costs are low and community feedback has been positive. The project also contributes to climate resilience and urban cooling.
Overview
Maximise interception, attenuation, infiltration of ~5,500 m² highway runoff.
Manage 1:30-year events; treat first flush.
Reduce sewer peaks (~33% in 1-year storm, modelled).
Engage residents; enable ongoing evaluation (data logger).
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| National water authority | Environment Agency | Financing | Financial; guidance and ongoing evaluation | Responsible |
| Local water authority | Nottingham City Council | Determination of design details of the measure | Construction; Design and ongoing maintenance | Responsible |
| Other | Groundwork Greater Nottingham | Implementation | Design; Implementation and community liaison | Responsible |
| Architects / Engineers | Severn Trent Water | Other | Post construction modelling | Supporting |
Site Information
Design and Implementation
The original plan for this scheme was to collect runoff from a surface area of 7100 m2, however only 5500m2 was incorporated into the scheme due to restrictions from underground services and a number of mature trees clustered in one section of Ribblesdale Road.
Proprietary water attenuation cells were key to the initial design as they provide significantly higher void space capacity than clean stone. However, budget contraints meant that use of proprietary cells was reduced and replaced by stone fill in a number of gardens.
Financing
NWRM measures were designed to be minimal maintenance. To ensure fully operational inlets will occasionally need to be cleared and vegetaion maintained.
Policy and Governance
| Directive | Relevant pressure |
|---|---|
| WFD identified pressure | Diffuse - Urban runoff - Storm overflows and discharges in urbanized areas not identified as point sources |
| Floods Directive identified pressure | Natural Exceedence - Flooding of land by waters exceeding the capacity of their carrying channel or the level of adjacent lands. |
| Directive | Relevant impact |
|---|---|
| Other non-EU | Property - Adverse consequences to property and businesses. |
| WFD identified pressure | Waterbody Status - Adverse consequences to ecological or chemical status of surface water bodies as of concern under the WFD. |
| Requirement directive | Specification |
|---|---|
| Floods Directive-mitigating Flood Risk | Address risk of flooding to local and downstream properties. |
| WFD-mitigation of significant pressure | Address effects of diffuse pollution from urban catchment. |
| Activity stage | Activity type | Comments |
|---|---|---|
| Design phase | Local residents involvment in design | Participation from local residents in the design and future management of the rain gardens. |
| Other | Follow up survey | Post implimentation survey |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
InfoWorks CS 2D modelling has been undertaken since implementation, to model the anticipated reduction in the flow reaching the sewer based on the data logger information.
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Key lessons identified are that :
- The measure provides proven surface water capture and infiltration, leading to reduced pressure on the local sewer and watercourse.
- Active residents/ stakeholder engagement and involvement during design and construction helps ensure that concerns are being considered and that the scheme will be accepted and valued.
- When delivered as a collaborative project, multiple benefits can be achieved such as knowledge transfer and local involvement and understanding.
- It is important that all involved (from designers to the construction crew on the ground) are clear on what is to be achieved and how, before implementation/ construction begins.
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Secondary driver | Previous rainfall events had led to property flooding downstream. |
| Availability of subsidies | Main driver | Money available as part of wider Urban Diffuse Programme in the region |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Successful coordination between authorities | Main factor | The partnership approach between all stakeholders was critical to the delivery of the retrofit scheme and was very effective. |
| Communication activities | Secondary factor | The positive attitude of the local residents and their involvement in meetings as the project progressed ensured support. |
| Other | Secondary factor | The land was already owned by the local authority so there were no land ownership issues. |