Room for the River: Nijmegen dike relocation, Netherlands
This flagship of the national Room for the River programme at Nijmegen set back the dyke at Lent and excavated the Spiegelwaal side channel, creating the Veur-Lent island and an urban river park that can take additional flood flow from the Waal. Completed in 2016, the scheme achieves about 35 cm lower design water levels—exceeding the original 27 cm target—and safely diverts high flows; the channel first overtopped its threshold in February 2016. Since delivery, the area has been reshaped as public space with new bridges and intense recreational use. In 2022 the city decided not to build housing on Veur-Lent, keeping the island largely as parkland (with limited facilities), while planning proceeds nearby. The Spiegelwaal now serves as a pilot in “Connected River” to balance flood safety, water quality and heavy leisure demand; bathing advice has at times been negative due to bacteriological risks. Funding came mainly from the State, with total costs reported at about €351 million.
Overview
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| National water authority | Rijkswaterstaat | Financing | Financing | Responsible |
| Other | Gemeente Nijmegen | Implementation | Direct overall project responsibility | Responsible |
| National water authority | Ministerie van Infrastructuur en Milieu | — | Involved directly in planning and execution of infrastructural changes | Responsible |
| Architects / Engineers | Staatsbosbeheer | Determination of design details of the measure | Involved in the planning and development of recreational and nature aspects on the future island | Supporting |
Site Information
Design and Implementation
Financing
Policy and Governance
| Directive | Relevant pressure |
|---|---|
| WFD identified pressure | Physical alteration of channel/bed/riparia n area/shore of water body for flood protection |
| Floods Directive identified pressure | Blockage / Restriction |
| Directive | Relevant impact |
|---|---|
| WFD identified pressure | Altered habitats due to hydrological changes |
| Floods Directive identified pressure | Rural land use |
| Requirement directive | Specification |
|---|---|
| WFD-mitigation of significant pressure | Bottleneck at a location with high population density will be solved |
| WFD-achievement of good ecological status | On the new island there will be room for nature development |
| Floods Directive-mitigating Flood Risk | The measure will significantly reduce the flood risk |
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
| National | Water | Room for the River programme | National strategy to create more space for flooding, rather than raising dykes further, initiated following widespread flooding in 1993 and 1995 |
| National | Water | FloodResilienCity (FRC) | INTERREG IVB programme enabling public authorities in eight cities in North West Europe to better cope with urban flooding. Nijmegen is one of the eight cities |
| Comments |
|---|
| Extensive public communication for the national programme as a whole, as well as locally for this specific measure |
Impacts and Monitoring
Impact Assessment Methodology
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
The integration of this particular scheme in to a wider programme with an overall goal ensures that individual measures do not adversely affect flood vulnerability in down- or upstream locations or in other river basins, and that the combination of individual measures leads to a cumulative, quantifiable positive effect on flood risk.
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Main driver | Flooding events in 1993 and 1995 led to the development of the national Room for the River programme |
| Organisation committed to it | Main driver | The national government decided on this approach and has led and funded its implementation |
| Success factor type | Success factor role |
|---|---|
| Attitude of decision makers | Main factor |
| Financing possibilities | Main factor |
In a water retention measure being combined with a city redevelopment project, it is important that there is an actual demographic/public demand to attract future private investment in the newly developed housing area and recreational activities.