Morphological restoration of temporary watercourses in the National Forest of Chaux
Chaux Forest is a timber production area threaded by many small, originally sinuous headwater streams. A 2006–2008 LIFE pilot restored two intermittent tributaries; building on those results, the National Forest Office (ONF) scaled up to ~45 km of temporary tributaries from 2015, redirecting flows to former meanders, adding coarse woody material and sediment to counter decades of straightening/drainage that had widened and incised channels, sped floods and lowered near-surface water tables. Since 2021, ONF and the Doubs-Loue river syndicate have restored ~13 km of the Clauge mainstem inside the forest (2021–2023): narrowing/raising the bed with vegetated berms, gravel recharge, selective infilling of over-wide sections and engineered log structures. Monitoring reports a strong hydrological response: depending on context, the hydropériode of the Clauge headwaters and intermittent tributaries now increases by ~2–6 months per year (including +3–12 weeks in spring), alongside recovery of aquatic bio-indicators. In June 2025 the project received the national “Rivière en bon état” distinction and the Nature-based Solutions award from the Rhône-Méditerranée-Corse Water Agency. Next step: design for restoring the Tanche tributary, with works targeted for 2026.
Overview
• Reconnect wet valley fringes and floodplain (reported several hundred hectares reconnected).
• Raise water table / lengthen hydroperiod; reduce incision/erosion; recover biodiversity (fish, macroinvertebrates, amphibians).
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Other | National office of forest (ONF) | Initiation of the measure | Project owner, the forest manager for both the french state and the local authorities owning the land. | Responsible |
| Research institute / University | Marie and Louis Pasteur University - Sciences and technologies department | Monitoring | — | Supporting |
| Local water authority | SMIX Doubs Loue | Implementation | Local authority responsible for aquatic environment management and flood prevention | Responsible |
| Architects / Engineers | Teleos | Determination of design details of the measure | Modeling of the project | Supporting |
Site Information
Design and Implementation
Integrating a relfexion on waterways crossing and creation of bypass paths where possible.
Use of LIDAR technology when possible to identify the former river beds.
Financing
OIEau
• 2021–2023 (mainstem Clauge, ~12–13 km): €848,000 (excl. VAT). Funding: €594,000 (70%) Agence de l’eau RMC; remaining 30% by project owners/partners.
Policy and Governance
| Requirement directive | Specification |
|---|---|
| Other EU | Habitats Directive |
| Activity stage | Activity type | Key issues | Comments |
|---|---|---|---|
| Design phase | Consultation meetings | Preconcieved ideas from local residents, representatives, hunters, etc. : "The project will flood the forest", "The Clauge floods will be worsen". | The goal was to explain how the various preconcieved ideas were wrong. |
| Implementation phase | Conference with officials and local representatives (2018) | The budget allowed to the project was considered by some as too expensive, especially in comparison with the smaller budget allowed for forest roads or other infrastructures. | Explaining the project and how it works. |
| Implementation phase | Press articles | — | A significant effort was made to communicate informations to the local press. |
| Other | Information panels on a new wooden footbridge over the river downstream (2025). | — | The goal is to communicate with people directly on the field. |
Impacts and Monitoring
Monitoring System
Entomological monitoring is carried out in the spring, at the net and in the watercourses and is led by the University. It is carried out before and after, at a control site, and at restored sites, with a time grid every two and three years. The control shows that the observed changes are not due to climatic variations.
Piezometric monitoring (individual or online). : About twenty piezometers have been installed with weekly automatic readings.
Dendrometric monitoring : At the level of the piezometers, vegetation monitoring plots are placed by the ONF (height, diameter, health status, dominance) on control plots of 1000m². The population evolution will be monitored over the long term.
2 weather stations will be installed in 2025 to study pluviometry and nebulosity.
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Economic benefits mainly come from the provided peak-flow reduction downstream.
Biophysical impacts: Hydrology
Restored channel complexity (sinuosity, benches, large wood), floodplain reconnection (hundreds of ha), and attenuation of downstream flood effects during high water.
Biophysical impacts: Biodiversity
It also reveals an improvement in habitat for entomofauna, with the number of taxa multiplied by 2, a recovery by ephemeropterans, perlids and trichopterans protected at the European level (e. g. Hagenella clathrata classified as endangered (EN) on the IUCN Red List). There is also an improvement in quality (i.e. more demanding species that are dependent on wetlands).
Biophysical impacts: Others
Lessons Learned
Anticipation is needed to carry out a similar project. It allows to prevent future problems, human or technical.
It is better to use the available technologies (LIDAR, modeling) for design and communication.
The sponge effect is working, but is not perfect : the massive october 6 2024 flash flood showed how even with fucntioning sponge measures flood can cause catastrophes.
| Driver type | Driver role | Comments |
|---|---|---|
| Other | Main driver | The fact the habitat was seriously degraded and other experience of successful restoration of habitat on a similar area was a key driver, as positive results were already forecasted from the beginning. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Other | Main factor | The presence of only one forest manager over a large area. Many differetn land woners and managers would have slowed down and/or prevented a similar project to be implemented. |
| Available support tools | Main factor | The access to LIDAR technology to identify the various former river beds helped to restore them. |
| Available support tools | Main factor | The modelisation work carried out by TELEOS allowed to show the local community how this project worked. |