Revitalisation of riverbanks and connection of hydraulic annexes alongside the Scarpe river in France
The Scarpe in Arras (long canalised) was renatured (2009–2012) to balance navigation, recreation and ecology. Actions included removal of sheet piling, gentle bank reprofiling, mixed bio-engineering (hemp bundles, vegetated geonets, gabion mattresses where needed), riparian restoration (invasives removal, seeding, pollarded white willows), controlled access, and creation of a lagoon.
The project treated 1,760 m of banks and built two reedbeds (≈1,000 m² and 1,450 m²). In the same programme, a 1.4 ha pike spawning area at Fampoux was re-opened and reconnected to the Scarpe. Governance shifted in 2012 via a VNF→Arras Urban Community (CUA) convention; FDAAPPMA 62 manages the spawning sites. Baseline surveys were done in 2010 with a five-year follow-up planned.
Total cost €1,321,310 (studies €132,277; works €1,189,032), co-funded by Artois-Picardie Water Agency 51%, ERDF 48%, CUA 1%.
The reach remains actively managed. In 2022 the environmental authority (MRAe) reviewed a 10-year dredging plan (~180,000 m³) to secure a 1.65 m navigation draft, notably around the Saint-Laurent-Blangy water-sports base, and requested stronger WFD compliance, better fish/European eel assessment, and a catchment-scale response to upstream sediment inputs. Together, the restoration and ongoing management aim to diversify habitats while keeping the canal’s socio-economic uses.
Overview
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Local water authority | Communauté Urbaine d'Arras (CUA) | Initiation of the measure | Project owner | Responsible |
| Regional / sub-national water authority | Agence de l'eau Artois-Picardie | Financing | Financing 51 % of the project | Supporting |
| Other | Fédération départementale des associations agréées pour la pêche et la protection des milieux aquatiques du Pas-de-Calais | Determination of design details of the measure | The management of the two recreated spawning areas is carried out by the Departmental Federation of Pas-de-Calais for fishing and aquatic environment protection (FDPPMA 62). | Supporting |
Site Information
Design and Implementation
Financing
Works and developments : € 1,189,032
Policy and Governance
Recreate breeding habitats for species
| Requirement directive |
|---|
| WFD-achievement of good ecological status |
| WFD-restoring a HMWB |
Impacts and Monitoring
Monitoring System
Impact Assessment Methodology
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
The various developments carried out allow for the reconciliation of both the ecological value of the site and the use of the waterway, namely commercial navigation, recreational boating, and associated leisure activities. As a result, the site's landscape value is enhanced, with a positive impact on tourism or recreational boating, as well as on leisure activities (such as walks...).
| Driver type |
|---|
| Organisation committed to it |
| Success factor type |
|---|
| Attitude of relevant stakeholders |