Summary
The Alzette river restoration at “Am Brill” (Schifflange) reversed earlier channelisation that had uniformised the river and impoverished habitats. The project re-meandered the channel (+140 m length), raised and widened the bed (summer/winter profiles), and removed an artificial dyke to reconnect the river to existing ponds; a new pond was also created. Works were delivered in 2000 over ~600–700 m as part of the LIFE-Nature project “Ecological valorisation of the upper Alzette.” Reported outcomes include ≈30 cm reduction of high-water levels, ~20,000 m³ of floodplain storage, a delayed flood peak (~15 min) and shorter peak duration (42→24 min), together with improved self-purification capacity and habitat diversity. Since completion, the site has been opened to the public via a 3 km interpretive nature trail (2005), and in 2024 it was incorporated into the nationally protected “Brill – Am Pudel” reserve, confirming its long-term conservation status and management.
Photo gallery
Overview
| Authority type | Authority name | Authority role | Authority responsibility |
|---|---|---|---|
| Local water authority | Municipal council of Schifflange | Initiation of the measure | Responsible |
| National water authority | Ministry of the Interior - Water Management Services | Implementation | Responsible |
| National water authority | Ministry of the Environment - Nature Conservation Service | Initiation of the measure | Responsible |
| Architects / Engineers | Micha Bunusevac design office | Determination of design details of the measure | Responsible |
Site Information
Design and Implementation
Financing
Policy and Governance
Impacts and Monitoring
Impact Assessment Methodology
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
The project consisted in a remeandering, increase of the base level of the river, widening of the riverbed, reconnection of the river to existing ponds and creation of a new pond. The project contributed to restore the flood plain, to prevent flooding and erosion, to restore the natural functionning of the river, to improve the self purification capacity, to improve biodiversity and to intergrate the river in the natural landscape.
Its success lead to further renaturation for the river, for example in the city Steinsel (Alzette and its tributary river Pétrusse) in 2023.
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Main driver | A flood event occurred in Schifflange in 1998. |