Constructed wetland with reed bed filters near Reims, France

Summary

Summary

The intensive urban development of the Bezannes joint development zone (ZAC), near Reims, has led to the artificialization of 172 hectares of land, along with a growing need for stormwater management. Vegetated swales were implemented in the southern part of the area, while in the north, stormwater is collected and directed to a facility that includes an artificial wetland, an artificial lagoon, and a reed bed filter.

The construction of this facility, initiated by the Greater Reims Urban Community (project owner) and Sinbio (project manager), aimed to incorporate a nature-based solution to manage stormwater inflows upstream of the Muire River, improve the quality of discharged water, and create a 5-hectare natural space that would benefit both local residents and biodiversity called Parc de la Roselière.

This project illustrates a shift from traditional civil engineering to ecological engineering, combining water regulation, pollution control, biodiversity enhancement, and public amenities.

Photo gallery

Overview
Year of issue
2015
Project
NWRM
Implementation status
Completed
Contact
Elia Desmot, OIEau
Location of the project
This project is located at the northern boundary of the commune of Bezannes, adjacent to the city of Reims. It is an area that has become highly urbanized, as fields have given way to residential developments and a joint development zone (ZAC) since the 2000s. The project is located within the catchment area of the Muire River, which flows downstream into the Vesle River, in a densely urbanized area.
Country
France
NUTS2 Code
Champagne-Ardenne
Sponge measures implemented in the case study
Basins
Wetland restoration and management
Swales
Objectives
Regulate runoff from 34.9 ha of impervious surfaces
Prevent downstream flooding and pollution (Muire stream and Vesle river)
Improve stormwater quality through natural filtration
Enhance biodiversity and landscape integration
Provide recreational and educational value via public access
Involved partners
Authority typeAuthority nameAuthority roleCommentsAuthority responsibility
Local water authorityGreater Reims Urban CommunityInitiation of the measureProject owner, financing, management. Operates the site.Responsible
Architects / EngineersSINBIODetermination of design details of the measureLed design evolution to natural wetlandSupporting
Architects / EngineersGUINTOLIImplementationImplemented wetland, paths and gabionsSupporting
Architects / EngineersISS Espaces Verts – Reims branchImplementationBasin plantingSupporting
Architects / EngineersEDIVERTImplementationPark landscaping—
Architects / EngineersSCEEImplementationLightingSupporting
Architects / EngineersANTEADetermination of design details of the measureContributed to early scenario assessment, initial hydraulic studySupporting
Site Information
Climate Zone
Cool temperate moist
Precipitation
596.00 mm
Temperature (°C)
11.50 °C
Elevation range
81.7 m
Vegetation class
species of wetlands and aquatic environments, great diversity: 26 varieties
WFD Ecological status
Moderate
WFD Chemical status
Failing to achieve good
Water quality status
Chronic rainwater pollution, road runoff. Nitrate-sensitive groundwater.
Design and Implementation
Project scale
Micro
Project scale specifications
Urban site-level intervention (stormwater management for 34.9 ha)
Located in the downstream section of the 172 ha ZAC de Bezannes
Project area
35
Project area specifications
Northern part of the 174-hectare joint development zone of Bezannes. Approx. 35 ha of drainage area.
Lagoon and filter: ~1.2 ha
Total landscaped park: >1 ha
Size
4.70
Size unit
ha
Design capacity
15000 m3
Principles
Transition from technical to ecological solution
Passive, gravity-based water routing (no pumping)
Multi-functionality: hydraulic retention, filtration, biodiversity, recreation
Design for 1-year to 100-year stormsIntegration of various depths and habitats (open water, wetlands, dry areas)
Public access with wooden footbridges and interpretive panels
Constraints
Very high groundwater table, no infiltration possible.
Need to avoid adding pressure to downstream sewer network (limited to 85 L/s).
Favourable preconditions
The idea to change from concrete to natural water retention was supported by WFD conditions and the city management. Large available space. Landscape integration supported by the urban project vision
Financing
Total cost
5480000.00 €
Total cost information
Basin works: 4,310,000 €
Park works: 520,000 €
Fence: 370,000 €
Project management : 280,000 €
All values are without VAT.
Financing authorities
Authority nameType of fundingCommentsFinancing share
Région Champagne ArdenneSub-national funds709,815.26 €~ 25 %
Reims MétropoleLocal fundsAdditional budget dedicated to the joint development zone.~ 75 %
Conseil Général de la MarneSub-national funds139,332.00 €small share
Compensations
No
Policy and Governance
Policy description
The creation of a 174-hectare joint development zone (ZAC) in the commune of Bezannes led to the need for stormwater management. The Greater Reims Urban Community sought to minimize reliance on civil engineering solutions for managing these waters. To protect the downstream urban areas, it is essential to store and infiltrate the water as much as possible, especially as the water table is shallow in the area. To maintain water quality, the use of the biological purification functions of wetlands and reed bed filters was chosen.
Land ownership
Public – Owned by Communauté Urbaine du Grand Reims (Project owner and operator)
Policy targets
Increase Water Storage
Runoff control
Improved Biodiversity
Oher Societal Benefits
Target remarks
Manage runoff from 34.9 ha of urban surfaces
Limit discharge to 85 L/s
Prevent flooding and protect groundwaterImprove water quality and create a recreational space
Pressure remarks
Sealed soils and urbanization
High groundwater level
Downstream flood risk (Muire & Vesle)
Chronic urban water pollution (hydrocarbons, heavy metals, road runoff)
Impact remarks
Hydrological regulation
Reduction of pollutants via reed bed filtration
Public access and landscape integration
Biodiversity creation and spontaneous species colonisation
Requirement directive remarks
Regulatory authorisation under the Loi sur l’Eau (2006)
Strict pollutant discharge thresholds (e.g. 25 mg/L MES, 5 mg/L hydrocarbons)
Policy challenges requirements
Limit algae growth and the need for dredging operations.
Landscaping includes three wooden footbridges and a path along the embankment, allowing for a walk around the basin.
Part of a wider plan
No
Public consultation
Yes
Consultation activities
Activity stageActivity typeComments
OtherInformative signage & bird panelsExplains system & biodiversity
Has contractual arrangements
No
Impacts and Monitoring

Monitoring System

Presence of formal monitoring system
No formal long-term ecological or hydrological monitoring in place

Maintenance

Maintenance requirements
Includes green space maintenance, reed cutting, decantation chamber cleaning. Footbridge repairs handled separately. Some early issues due to insufficient maintenance.

Impact Assessment Methodology

Performance impact assessment method
Unknown

Socio-economic Impacts

Benefits and co-benefits
Integrated into a public park frequented by local residents (recreation, education)
Increased land value and public satisfaction.
Direct benefits
Earlier estimate for conventional concrete basin was 8,000,000 €. The natural alternative saved ~3.2 M€

Biophysical impacts: Hydrology

Information on retained water
Storage of up to 15,000 m³ for 100-year storms
Discharge regulated at 85 L/s
Passive gravity-based outflow prevents downstream network saturation
Early limitation: underperformance at start due to incomplete roadworks and insufficient inflow

Biophysical impacts: Biodiversity

Improved biodiversity
Yes
Information on improved biodiversity
Development of a diversified wetland habitat. The site functions as an attractive refuge and offers a variety of habitats.
Spontaneous colonisation by frogs, fish, and unexpected willow species. Notably, the house martin and the common kestrel - both species in significant decline in recent years - have been observed. Bats (common pipistrelle and the serotine bat), odonates (such as hawker dragonflies and damselflies), orthopterans including the ebony black grasshopper - listed as a regional red list species - and common butterflies like the common blue, marbled white, and cabbage white.
Plantation of 26 wetland plant varieties

Artificial river section: This area hosts the richest biodiversity on the site.
Lagoon section: Ecological diversity and richness are satisfactory, but the planted species are underrepresented. The presence of filamentous algae suggests a meso-eutrophic environment, water renewal is lower than expected.
Reed bed filter section: The plants appear stunted due to insufficient water and nutrients. Eight additional species have colonized the area spontaneously, requiring differentiated mowing management.
Wetland section: Water levels are too low; the planted species are in the minority and have been replaced by plants not typical of wetland environments.

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Positive impact-WQ improvement
Information on water quality overall
Filtration of stormwater via reed bed filter
Treatment of suspended solids, hydrocarbons, and metals
Pollution control compliant with thresholds (e.g. MES < 25 mg/L)
Occasional pollution episodes observed (e.g. sewage backflow, dewatering discharge)
Soil quality overall improvements
N/A info

Biophysical impacts: Others

Ecosystem impact climate regulation
No specific impact
Information on ecosystem impact climate regulation
Not mentioned
Lessons Learned
Key lessons
This project demonstrates how a purely technical stormwater management facility can be transformed into a project that delivers significant ecological and landscape value, particularly as it is located along one of the identified ecological corridors of the urban area.

Passive, nature-based solutions can replace costly engineered alternatives
Early stakeholder engagement (e.g. landscape architects, ecologists) improves project outcomes
Public accessibility increases acceptance, but requires robust infrastructure
Design flexibility is key to adapting to site constraints (e.g. groundwater)
Anticipating inflow timing and maintenance needs is essential for early functionality
Barriers
Barrier typeBarrier roleComments
Legal obligations / restrictionsMain barrierRequired environmental authorisation due to proximity to groundwater
OtherMain barrierHigh groundwater table, imposed full waterproofing and prevented infiltration.
OtherSecondary barrierThe first years, low inflows. Roads not yet completed, limited water entering the basin initially.
Drivers
Driver typeDriver roleComments
Organisation committed to itMain driverProject director to replace a concrete basin with a natural solution
OtherMain driverNeed to manage runoff from a large new urban zone.
Legal obligationsSecondary driverSustainability ambition embedded in Reims Métropole’s planning policies
Success factors
Success factor typeSuccess factor roleComments
OtherMain factorLarge space available enabled ecological and public integration
Existing staff and consultant knowledgeMain factorInterdisciplinary design team. Combined hydrology, landscape, ecology, and urban design
OtherSecondary factorPublic ownership and long-term vision. Enabled consistent management and public park development.
Cost effectiveness
The initial solution cost of €8 million. The sustainable development approach reduced to €4.8 million, representing a saving of €3.2 million.