Polder management near Altenheim, Germany

Summary

Summary

Ecological flooding has been implemented in a polder area near Altenheim, Germany, as part of the Integrated Rhine Programme (IRP). Covering approximately 520 hectares, the Altenheim polders serve a dual function: ecological enhancement and flood retention, with a capacity of up to 17.6 million m³. Since 2001, controlled ecological flooding is triggered when the Rhine’s flow exceeds 1550 m³/s, with infrastructure allowing flows up to 80 m³/s. This approach has significantly improved biodiversity, groundwater dynamics, and habitat conditions.

The project also created recreational opportunities and enhanced landscape connectivity. However, challenges arose related to forest adaptation (notably shifts in tree species), mosquito proliferation, and groundwater level management. In response, new measures were introduced—including permanent swing barriers (installed in 2021) to protect wildlife during floods, and coordinated post-flood clean-ups involving local authorities and forestry services.

Recent evaluations confirm ongoing positive ecological effects, including increased amphibian, fish, and mammal presence. Regular maintenance and monitoring are coordinated by the Regional Council (Regierungspräsidium Freiburg), ensuring the multifunctional goals of flood protection, ecological restoration, and local engagement are maintained.

Photo gallery

Overview
Year of issue
2025
Project
NWRM
Implementation status
Completed
Contact
Sabine Tutte, ACTeon
Location of the project
The Altenheim polder area is located west of the village of Altenheim (part of the municipality of Neuried), in Baden-Württemberg, Germany.
Country
Germany
NUTS2 Code
Freiburg
Sponge measures implemented in the case study
Floodplain restoration and management
Restoration and reconnection of seasonal streams
Reconnection of oxbow lakes and similar features
Forest riparian buffers
Re-naturalisation of polder areas
Involved partners
Authority typeAuthority nameAuthority roleComments
OtherRegional Council FreiburgDetermination of design details of the measureThe Regional Council Freiburg is a sub division of the Ministry of the Environment in Baden Wurtemberg. It was in charge of the planning and design of the measures, as well as of the publicity
OtherDistrict CouncilOtherApproval of the measures
OtherCommunity of NeuriedOtherMember of the Mosquito fighting task force
Forest ownersForest ownersOtherNeeded planning reliability and supported therefore the ecological flooding approach
NGOEnvironmental NGOsInitiation of the measureSupporter of the ecological flooding approach
Site Information
Climate Zone
Cool temperate dry
Precipitation
800.00 mm
Temperature (°C)
9.50 °C
Runoff
1060.00 mm
Slope range
0-1%
Vegetation class
Alluvial floodplain forest.
This includes species typical of temperate riparian zones along the Upper Rhine, such as:
Hardwood species: oak (Quercus robur), ash (Fraxinus excelsior), elm (Ulmus spp.)
Softwood zones (in wetter areas): willow (Salix spp.), poplar (Populus spp.)
Understory and ground vegetation: includes reed beds, sedges (Carex spp.), and other floodplain herbaceous plants
Design and Implementation
Project area
520
Area subject to Land use change or Management/Practice change (ha)
520.00 ha
Basis of design
Use for retention approx. every 10 years.
Financing
Total cost
1300000000.00 €
Costs investment information
The adaptation of the forest was "cost neutral" since the community of Altenheim used the money received by the state as compensation to place funds and the interests are invested into forestry.
Costs capital
1300000000.00 €
Costs capital information
This money had to be invested for the 13 retention areas of the Integrated Rhine Programme.
Costs operation maintenance
450000.00 €
Costs operation maintenance information
Upkeeping costs per retention area. This depends on the length of the dykes, the number of pumping stations, the length of streets inside the polder etc.
Administrative annual costs
100000.00 €
Administrative annual cost information
The Regional Council hopes that this number will decrease sooner or later due to new knowledge.
Financing authorities
Authority nameType of fundingFinancing share
Federal Republic of GermanyNational funds41,5%
State of Baden-WürttembergSub-national funds58,5%
Compensations
Yes
Compensations annual information
Every landowner inside the polder receives 20% of the land value as compensation. In return the Regional Council Freiburg enters to the title register. Forest owners are compensated once, since it is too complex to discuss after every flooding whether damages are new or old. After flooding events experts assume the damage happen on fields and the farmers are compensated individually
Policy and Governance
Policy description
Physical alteration of the channel, the river bed and the floodplain due to hydropower plants, flood protection and an easier navigability on the Rhine.
Land ownership
The land is mainly publicly owned by the State of Baden-Württemberg, with some areas owned by the municipality of Neuried and private landowners. The site is managed by the Regional Council of Freiburg.
Policy targets
Increase Water Storage
Peak-flow reduction
Improved Biodiversity
Part of a wider plan
Yes
Wider plan
NameComments
Integrated Rhine ProgrammeThe main focus of this programme is flood protection by restoring the floodplain on the upper Rhine upstream of Karlsruhe.
Public consultation
Yes
Consultation activities
Activity stageActivity typeComments
Implementation phaseInformation eveningsSince the ecological flooding is a quite new concept publicity has to be done in order that neighboring communities accept it. This has to be done continously. The polder Altenheim is a good exemple that shall calm down the worries of other communities were a polder shall be constructed
Othersite visits—
Has contractual arrangements
No
Contractual arrangements
Arrangement typeResponsibilityNameComments
Contractual agreementResponsibleTreaty of VersaillesTreaty between France and Germany allowing France using the Rhine for Hydropower. Due to the construction of numerous dams the Rhine lost 90% of its floodplain and made the integrated rhine programme necessary
Organisational arrangementSupportingComission for the Protection of The RhineThe riparian countries of the Rhine formed this comission to improve the water quality and the overall ecological state of the river. Navigability is moreover an important issue
Impacts and Monitoring

Monitoring System

Monitoring parameters
Inside the polder several parameters were monitored to document the impact of ecological flooding on water and matter balance, state of groundwater, water courses and lakes, soil and biodiversity. Moreover, the water retention during flood events was documented.

Impact Assessment Methodology

Performance impact assessment method
Catchment outlet
Performance impact estimation information
The amount of terrestrial plants and the domination of single species in different vegetation layers was determined by rough assuming. Aquatic macrophytes were documented by the estimation method of Kohler and Janauer. Beetles were counted by pitfalls, the diversity of birds was determined by observing and counting nests.

Socio-economic Impacts

Direct benefits information
Lease of land around the swimming lake.
Ancillary benefits information
Recreational value since the polder area is used for hiking, jogging, cycling and canoeing.

Biophysical impacts: Hydrology

Hydrological effects
Strong influence on the fluctuation of the water table.
Information on increased water storage
The water is stored in watercourses inside the polder and in case of retention also in the forest.
Information on runoff reduction
No data available.
Information on peak flow reduction
During the last flood on the Upper Rhine in the 90's, the water retention inside the polder led to a reduction of the gauge of 24 cm and avoided thus the inondation of important industrial cities (Karlsruhe, Speyer, Mannheim).
Information on increased groundwater level
Ecological Flooding leads to rising groundwater levels outisde the polder that can affect property. Therfore a complex drainage system including channels, wells,lakes and pumping stations was created.
Information on Restoring hydraulic connection
In order to distribute evenly water inside the polder, a system of water courses was reconnected and restored, the so called Schluten

Biophysical impacts: Biodiversity

Improved biodiversity
Yes
Information on improved biodiversity
Due to ecological flooding alluvial plant and animal communities could be established. The floods diversify the water courses which thus became habitat of different invertebrate and fish species. Several groundbeetle and dragonfly species came back to the new established alluvial forest. However, the regular flood events are source of mosquito pests that require a treatment by the members of a taskforce.

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Negative impact-WQ deterioration
Information on water quality overall
Measurements have shown that the overall water quality of the Rhine deteriorates when the water passes the polder. However, no danger for the drinking water supply exists.
Soil quality overall improvements
Positive impact-SQ improvement
Information on soil quality overall improvements
Due to ecological flooding, the forest soil is constantly enriched by organic sediments serving as fertilizer for the plants.

Biophysical impacts: Others

Ecosystem impact climate regulation
No information available
Lessons Learned
Key lessons
It is possible to adapt and modify the ecosystem inside a polder to water retention events by ecological flooding. Due to the measures the polder became a valuable recreational area for the citizens of the neighboring community. However, expensive protection measures for Altenheim are needed to avoid damage by rising groundwater level in consequence of ecological flooding.
Barriers
Barrier typeBarrier roleComments
Legal obligations / restrictionsMain barrierEcological flooding does not reach the entire polder area. The good functioning of hydropower plants has priority. As a consequence, the flooding process depends on the Rhine discharge.
OtherSecondary barrierDuring ecological flooding, humans have to be kept out of the area and its surroundings. During the first test ecological flooding, animals could not escape from the polder area, as they were scared by the humans which were watching on the dykes. Many deers drowned in the flood that was hyped by German tabloids as scandal. The principle and usefulness of ecological flooding is often not understood by citizens. On other planned retention areas (polder Schwanau) of the Integrated Rhine Programme communities went to court against the state of Baden Wurtemberg. They fear for example that rising groundwater levels could damage their houses, or that dirty Rhine water could affect the drinking water aquifer.
Drivers
Driver typeDriver roleComments
Legal obligationsMain driverA sudden inondation of the polder would have caused a severe impact on the ecosystem. According to law, impacts have to be avoided, minimised or balanced. This led to the development of the ecological flooding concept.
Legal obligationsSecondary driverDetermines the amount of ecological flooding depending on the Rhine discharge.
Success factors
Success factor typeSuccess factor roleComments
Attitude of decision makersMain factorThe regional council had to meet many restrictions (international contracts, lack of space). Nevertheless, they created with the polder Altenheim an example for the whole Integrated Rhine Programme (IRP) showing that ecological flooding works and that a polder area has multiple benefits.
Financing possibilitiesMain factorThe maintenance of a polder is very expensive. The international importance of the project enabled the mobilisation of sufficient funds.
Attitude of relevant stakeholdersSecondary factorOne argument against ecological flooding is the fear of people towards a mosquito pest. Several communities formed a tasked force (the KABS), which is controling the mosquito population. This programme is very complex but effective.
Sources