Recovery of dried out communities in Slovakia

Summary

Summary

Integrated rainwater retention was applied to recover degraded landscapes and local climate in north-eastern Slovakia, using small check dams, retention ponds, rain gardens and re-cultivated logging roads. Coordinated by People & Water (Ľudia a voda) and co-financed by the LIFE programme (LIFE11 ENV/SK/001019), the project worked across the Ondávka micro-region (Humenné district; eight municipalities). Implemented from August 2012, it ended early in May 2015 after loss of co-financing. By closure, 1,148 small barriers, 7 rain gardens and ~1 km of logging roads had been built or re-profiled; planned fishponds were cancelled. Local reporting indicates the measures reduced flood peaks during intense storms in 2013–2014 and were estimated to enhance the “small water cycle” by ~140,000 m³/year. The project also created short-term jobs (e.g., 56 unemployed people engaged in 2013 via the Humenné Labour Office). Since 2015, similar water-retention approaches have been incorporated into regional plans (e.g., the Košice Region’s 2021–2030 landscape and river-basin restoration programme) and referenced in national flood-risk planning updates (2024) covering the area.

Photo gallery

Overview
Year of issue
2025
Project
NWRM
Implementation status
Completed
Contact
REC
Location of the project
The case study is in the Ondavka micro-region (District Humenné, Prešov Region), across the municipalities Baškovce, Černina, Gruzovce, Hrubov, Ohradzany, Slovenská Volová, Sopkovce and Turcovce.
Country
Slovakia
NUTS2 Code
Východné Slovensko
Sponge measures implemented in the case study
Rain Gardens
Check dams
Ponds and scrapes
Permeable surfaces
Objectives
Integrated works to retain rainwater across eight Ondavka municipalities: re-cultivation of logging roads/paths, flow-control barriers, retention ponds, and rain gardens—to prevent excess runoff, floods, drought and erosion.
Planned outputs (LIFE plan, Action B.1): 20 retention ponds, 150 flow-control barriers, 35 rain gardens, and 7 km of re-cultivated logging roads.
Target hydrologic effect: confirm ~120,000 m³ of retained water (annual “small-water-cycle” gain) through monitoring.
Monitoring deliverables (C.1): monthly thermal images (≥6 per site), 48 monitoring documents, and networking with other LIFE projects.
Socio-economic objective: employ at least 80 local residents for one year as part of the works.
Involved partners
Authority typeAuthority nameAuthority roleAuthority responsibility
NGOPeople and WaterImplementationResponsible
Regional / sub-national water authorityRegionálne združenie OndávkaFinancingSupporting
Local water authorityMunicipalities (Baškovce, Černina, Gruzovce, Hrubov, Ohradzany, Slovenská Volová, Sopkovce, Turcovce)ImplementationSupporting
Site Information
Climate Zone
Cool temperate moist
Precipitation
550.00 mm
Temperature (°C)
8.00 °C
Elevation range
340
Vegetation class
Predominant class is forest land (~50.22%), with substantial permanent grassland (~29.75%) and arable land (~12.95%) across the 7,044 ha project area.
WFD Ecological status
Moderate
WFD Chemical status
Good
Design and Implementation
Project scale
Meso
Project scale specifications
The project spans the Ondavka micro-region (Bodrog sub-basin, E. Slovakia) across eight municipalities : Baškovce, Černina, Gruzovce, Hrubov, Ohradzany, Slovenská Volová, Sopkovce and Turcovce ; implementing a distributed set of measures (small check dams, rain gardens, re-cultivated logging roads) at multiple sites within the sub-basin rather than a single point location.
Project area
7044
Financing
Total cost
1431535.00 €
Total cost information
EU Contribution: 690267 €
PandW Contribution: 141288 €
Ondavka Contribution: 600000 €
Total elegible budget: 1380535 €
Financing authorities
Authority nameType of fundingCommentsFinancing share
European UnionEU-funds: LIFE+€690,26750 %
People & Water (NGO)Private funds€141,2888 %
Regional Association OndávkaSub-national funds€600,00042 %
Policy and Governance
Policy description
A damaged environment characterized by erosion, erosion furrows in agricultural lands, drought, flooding, quick rainwater runoff, low water retention capacity of soil, increasing rate of flow of water bodies near built up areas and deforestation.
Thinning atmosphere with higher allergenic content in the atmosphere and greater temperature oscillations between daytime and nighttime temperatures.
Land ownership
Mixed ownership across the eight municipal cadastres.
Policy targets
Increase Water Storage
Runoff control
Erosion Control
Oher Societal Benefits
Improved Biodiversity
Part of a wider plan
No
Public consultation
Yes
Consultation activities
Activity stageActivity typeComments
Screening phaseProject presentations and their approvals at municipal gatherings—
—Introductory conference presenting project proposal—
—Monitoring project output—
OtherPreparation and publication of manual†œRevitalizing the Climate in my Community†
OtherClosing conference and dissemination of project results—
Has contractual arrangements
No
Impacts and Monitoring

Monitoring System

Monitoring requirements
The project itself says long-term monitoring is needed - especially rainfall measurement and water-level monitoring in the Ondavka - to validate hydrological and ecological effects.
Monitoring parameters
Monitoring was run by two monitoring experts from the project team (NGO People & Water). They executed 14 missions (Sep 2013–Feb 2014) and 16 missions (Nov–Dec 2014), focusing on field inspections during and immediately after precipitation, mapping/photo documentation, and building a database of measures; Action C.1 was only partially completed because of the early termination.

Maintenance

Maintenance requirements
No formal, published maintenance regime for the built measures is described; the LIFE record only notes a “high level of ownership” by the engaged municipalities, without detailing upkeep operations.

Socio-economic Impacts

Direct benefits information
114 local long-term unemployed were trained and employed on site (56 people worked ~Aug–Dec 2013 after a training course on 1–9 Aug 2013; 58 people worked Apr–Sep 2014 in 8 teams across the 8 municipalities).
16 information boards installed; 1,500 + 1,500 bilingual leaflets printed; 4 press releases (of 8 planned) due to early close; project film broadcast 79 times on regional TV; website and multiple technical events/visits (e.g., NVE Norway) delivered.
Ancillary benefits information
Greater attractiveness of the basin contributing to increased tourism

Biophysical impacts: Hydrology

Information on retained water
Achieved 21,299 m³ one-off storage capacity; the team then estimated this at ~28,000 m³ considering additional infiltration during events, and ~140,000 m³ yr⁻¹ added to the local “small water cycle.”
Information on increased water storage
Rainwater retained more time on earth
Information on increased groundwater level
No site measurements; the team estimates ~1/3 of annually retained water recharges groundwater (the rest evapotranspires).
Information on Restoring hydraulic connection
Planned fish/retention ponds were cancelled for financial reasons (so no new off-channel water bodies).
Information on reducing flood risks quantity
After measures were in place (2013–2014), heavy rains reportedly did not cause the earlier recurrent flooding in target communes; check dams “had a big flood-prevention effect.”

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
N/A info

Biophysical impacts: Others

Ecosystem impact climate regulation
Impact on GHGs (net emissions and storage) including soil carbon
Information on ecosystem impact climate regulation
The project fills groundwater sources, feeds vegetation, and increase evaporation so revitalizes the small hydrological cycle and maintain a stable climate.
Increased evapotranspiration information
Via enhanced evapotranspiration, the team estimates ~93,000 m³ yr⁻¹ evaporated, corresponding to a ~65 GWh yr⁻¹ reduction of sensible heat released to the atmosphere (cooling effect); also anticipates higher photosynthesis and carbon sequestration. These are project estimates, not direct measurements.
Lessons Learned
Key lessons
Retaining rainwater locally with many small, low-cost measures across a micro-basin can curb rapid runoff and reduce flood peaks. In Ondavka, check dams and rain gardens coincided with heavy rains in 2013–2014 without the earlier recurrent flooding, and works delivered ~21–28 thousand m³ of event storage with an estimated ~140 thousand m³ yr⁻¹ added to the small water cycle (project figures).
“The retention of rainwater on earth allows water to carry out its numerous unique functions which support various forms of life on earth. Water maintains a stable climate and a healthy hydrological cycle. Water is essential for evaporation which transforms the solar radiation into latent heat and thus contributing to a cool and stable climate. Without water, the solar energy is released back into the atmosphere as sensible heat therefore contributing to a rising temperature and drier atmosphere. An atmosphere abundant in moisture content maintains a stable and cool climate mitigating weather extremes such as drastic temperature oscillations, heat waves and intensive precipitation.”
Strong community engagement matters. Training and employing local long-term unemployed built capacity and ownership in the eight municipalities, which the project cites as key to rapid deployment and care of dispersed structures.
Funding continuity is a risk to delivery. Loss of co-financing led to early termination and cancellation of planned ponds; phasing and diversified budgets would help safeguard critical outputs.
Monitoring must be designed, funded, and sustained. The project planned thermal imaging and systematic hydrometric tracking but only partial monitoring was completed; future efforts should secure rainfall gauges, stream level/flow records, and standardized field inspections to verify long-term hydrologic, ecological, and climate effects.
Scaling is feasible but coordination is essential. Mixed land ownership and multi-municipality footprints require early permits, clear roles, and simple, maintainable designs; the approach has since informed wider regional programs.
Barriers
Barrier typeBarrier role
Limited staff and consultant knowledgeMain barrier
Missing regulatory supportSecondary barrier
Expected maintenance needsSecondary barrier
Drivers
Driver typeDriver role
Organisation committed to itMain driver
Past flooding eventsSecondary driver
Success factors
Success factor typeSuccess factor role
Communication activitiesSecondary factor
Financing possibilitiesMain factor
Successful coordination between authoritiesSecondary factor
Transferability
Highly transferable to small sub-basins with similar topography and land use. Success depends on early municipal/landowner buy-in, clear permits, and stable co-financing. Design simple, maintainable check dams/rain gardens sized to local rainfall, soils and slopes; plan for sediment management and safe overflows. Build a minimal monitoring scheme (rain, water levels, inspections) and assign clear upkeep responsibilities.