Summary
The main objective of the project is to conserve the biodiversity, the natural habitats, the wild species of flora and fauna and to assure an efficient management of protected natural areas, in particular, management of the ecological network Natura 2000 through reconstruction of Comana Wetland within Giurgiu County.
Comana Wetland restoration (2009–2011) in Comana Natural Park (Giurgiu County) built a small dam with sluice on the Neajlov and a fish pass, raised and stabilised water levels (~490 ha), set up ecological monitoring and visitor infrastructure, and supported Natura 2000 management and biodiversity gains. Since then, management has been updated: the park’s management plan was approved by ministerial order in May 2022. Navigation on Balta Comana/“Neajlov Delta” is now regulated (county regulation in 2022 and a national order in Feb 2024). The county also initiated a concept for a second restoration phase (“REBACO 2”, 2021) and launched feasibility/design steps. Recent monitoring and studies include a 2021 water-quality survey and analyses of ichthyofauna dynamics. In 2024, an exceptional drought led to near-complete drying of Balta Comana with short-term ecological and tourism impacts reported; local environmental press noted a return of water after autumn–winter rains in January 2025. These developments underline the need for continued maintenance of hydraulic works and adaptive, drought-resilient management.
Photo gallery
Overview
Achieve a permanent retention level of 43.60 mMB at Comana Pond;
Extend open-water surface to ~490 ha and keep shallow-water areas <0.5 m;
Install a fish pass to avoid habitat fragmentation.
Ecological reconstruction of ≥30% of the pond’s initial area;
Increase protected species by ≥5% (target/estimate at completion).
Wetland traps sediments and retains nutrients/other pollutants, improving water quality (no quantified load figures).
Birds (quantified). Habitat available to birds increased by ≥30%; number of birds increased by ≥5%; inventories report 157 spp. pre-project rising to 212 spp. after works (78 protected). New feeding sites for ducks/herons established.
Fish & invertebrates. Project documents state improved habitat and species richness; ichthyofauna studies (2011–2017) describe recovery of the aquatic ecosystem following impoundment and emphasise the need to continue monitoring.
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Regional / sub-national water authority | the Giurgiu County Council | Implementation | County Authority / The project developer Owner of Balta Comana and the dike-dam (public domain); adopts and enforces the navigation regulation. | Responsible |
| Local water authority | Comana Local Council | Initiation of the measure | — | Supporting |
| Nature park | Administration of Comana Natural Park | Implementation | Initiation of the measure; Determination of design details of the measure; Implementation; Monitoring | Responsible |
| Private property owners | Business people who have invested in the area | Financing | — | Supporting |
| Regional / sub-national water authority | Local Environmental Protection Agency | Monitoring | — | Supporting |
| Farmers | Land users from the area of Comana wetland restoration area | Other | — | Supporting |
Site Information
Design and Implementation
Financing
- Ecological restoration of habitats and reinforcement of species population, through 1) construction of a dam with sluice on Neajlov River, downstream of Comana Lake2) construction of a fish scale downstream of the dam; - Setting up monitoring systems for the Natura 2000 sites and protected areas,
- Construction and improvement of the infrastructure of the national protected areas and Natura 2000 sites (building of visitors and information centres and of information panels, risk management / fire prevention and control etc.).
- Preparation of information and publicity materials to contribute to awareness raising on the issues of protected areas and Natura 2000
Policy and Governance
| Wider plan type | Wider plan focus | Name |
|---|---|---|
| Local | Environment & Biodiversity | Management Plan of the protected area |
| Local | Environment & Biodiversity | Visit Strategy of the protected area |
| Regional | Environment & Biodiversity | Giurgiu County Development Strategy |
| Local | Environment & Biodiversity | Region Development Strategy. |
| Activity stage | Activity type | Comments |
|---|---|---|
| Implementation phase | Caravans for promoting biodiversity conservation presenting information about nature and its protection, about Comana Natural Park (flora and fauna); | The project had the support of local public authorities and business people who have invested in the area. |
| Implementation phase | Dissemination of materials with key messages; | — |
| Screening phase | Round table for capacity building and improvement of cooperation with local authorities and stakeholders from the Comana Natural Park area | — |
| Screening phase | Thematic seminars with key messages: ";protecting nature - protecting life"; and "to teach both young people and local community, how important is the conservation of environment" | — |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
~10,000 visitors/year to protected sites and ~5,000 users/year for camping, walking, jogging, water sports and cycling. The park also organises guided visits for groups.
~500 educational excursions/year as a project benefit; guided school visits, seminars and workshops are part of ongoing activities.
Biophysical impacts: Hydrology
Hydraulic annexes (as built). Earthen dike with a ~525 m overflow spillway (0.80 m high); dam crest 45.00 mMB; fish pass downstream.
Recent adverse event. In Aug 2024, the “Neajlov Delta” (Balta Comana) dried almost completely due to severe drought; media and photo reports show near-total drawdown. Water presence was reported again after winter rains in Jan 2025.
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Delivery was slowed by public-procurement appeals. Future projects should plan timetable buffers and contract flexibility for addenda to avoid cascading delays.
Sustained awareness-raising and stakeholder engagement were critical. The team ran caravans, seminars and roundtables, building the social licence that underpinned implementation and later park uses.
Clear governance and operating rules matter once water returns. After the works, Giurgiu County formalised navigation rules and confirmed that Balta Comana and the dike–dam are in the county public domain; the 2024 national order approves a unified navigation regulation requiring the Park Administration’s prior consent. This helps balance recreation with conservation and infrastructure safety.
Monitoring must be embedded and used. The project installed stations and a central dispatcher for birds and environmental parameters; later, an independent 2021 survey documented water-quality indicators, and the basin authority classed Comana Lake’s ecological status as “moderate” in 2023 (three monitoring sections). That combination shows why regular measurement is needed to adaptively manage outcomes.
Climate variability is a stress test. In summer 2024, the “Neajlov Delta” dried almost completely, disrupting biodiversity and tourism; local environmental press then reported water returning after autumn–winter rains in January 2025. Designs and O&M regimes should anticipate prolonged low-flow years and safeguard minimum levels where feasible.
| Driver type | Driver role | Comments |
|---|---|---|
| Availability of subsidies | Main driver | available EU funds |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Financing possibilities | Main factor | The funding was sufficient for project implementation and the financial framework conditions support the financing of the nature conservation activities. Without the EU funding, the project would not have been possible. |
| Attitude of relevant stakeholders | Secondary factor | Strong actors / The project has the support of local public authorities and business people who have invested in the area. Also the County Council Giurgiu has a good collaboration with Local Environmental Protection Agency and land users from the area of Comana wetland restoration area. They are supported by Administration of Natural Park Comana who is also one of the partner within the project. |