Revitalization of the upper Drau River in Austria

Summary

Summary

At three different sections of the Austrian Drau the river bed was enlarged and restoration works have taken place. Moreover, 25 ha of riparian forest were created as well as meadows, lakes and several river branches.

Photo gallery

Overview
Year of issue
2013
Project
NWRM
Contact
Sabine Tutte, ACTeon
Location of the project
The project side lies close to the Italian border in the west of Klagenfurt. The revitalized parts of the Drau are between Spittal i.Dr. and Oberdrauburg.
Country
Austria
NUTS2 Code
Kärnten
Sponge measures implemented in the case study
Re-meandering
Stream bed re-naturalisation
Natural bank stabilisation
Lake restoration
Involved partners
Authority typeAuthority nameAuthority roleCommentsAuthority responsibility
National water authorityFederal Ministry for Agriculture, Forestry, Environment and Water Management, represented by the Carinthian State Government, department 8- Competence Centre environment, Nature and Water conservation, subdivision water managementInitiation of the measureExecutionResponsible
OtherTorrent and avalanche control, section Carinthia, regional management supervision 4 Upper Drau Valley and Müll ValleyImplementationreconstruction of the open check damResponsible
National water authorityCarinthian State Government, department 8, competence centre environment, water and nature protection, subdivision Nature Conservation and National Park LawOthersupervision of nature conservation measuresResponsible
Research institute / UniversityUniversity of ViennaMonitoringAnalysis of the river bed before and after the LIFE Project, Study of the composition of the fish fauna, calculation of the transported bedload in the FeistritzbachSupporting
Research institute / UniversityÖkoteamMonitoringsearch for indicator species in order to document the improvement of the ecological stateSupporting
Local water authorityAgrarian Regional Office of VillachImplementationPurchase of landResponsible
—LIFE NatureFinancingProject Control for the EUResponsible
Architects / EngineersREVITAL Ziviltechniker GmbHImplementationProject CoordinationResponsible
Architects / EngineersDI Dr Peter Mayr and teamMonitoringgeodetic survey of the riverSupporting
National water authorityFederal Ministry for Agriculture, Forestry, Environment and Water Management (rural development section) department II/4Financing—Responsible
Site Information
Climate Zone
Cool temperate moist
Precipitation
1100.00 mm
Temperature (°C)
7.00 °C
Runoff
73.80 mm
Elevation range
625
Slope range
0-1%
Vegetation class
In the surroundings of the upper Drau one can find a big variety of different landuses: forest, meadows, fields.
WFD Ecological status
Poor
WFD Chemical status
Failing to achieve good
Water quality status
Given that water quality improvement was not an objective of the project, no information is available.
Design and Implementation
Project scale
Meso
Project scale specifications
Although the enlargement of the river bed was done on a length of 5 km the affected length of the river/region around the river is 68 km. The surface of the project region (river and surroundings) are 976 ha.
1 ha meadow lakes, 25 ha riparian forests
Project area
26
Size
5.00
Size unit
km
Principles
As already explained the erosion of the river bed (the Drau became deeper and deeper) determined the choice of measures. Another point to mention is the availability of land. Next to the negotiations with farmers a reallocation of land took place. Plots were exchanged between farmers and the project responsible. Depending on the size of riparian buffers available the measurements were adapted.
A good ecological status should be achieved for the Drau river. The measurements combine habitat diversity with passive flood protection. Secondary the regional tourism department supported the project by designing picnic areas, positioning info points and marketing the project.
Constraints
The availability of land determines which measures can be used and how expensive the implementation of the measures will be.
Favourable preconditions
The erosion of the river bed should be stopped. This goal determined the choice of measures.
Financing
Total cost
4475000.00 €
Total cost information
total costs of the project
Costs capital
3930000.00 €
Costs capital information
Construction, staff, journeys, measuring instruments, gauges
Costs land acquisition
670000.00
Costs land acquisition unit
€ (total value)
Costs land acquisition information
Purchase of land
Costs operation maintenance information
No special, project-linked expenses.
Every few years maintenance has to be done as on every other river like cutting grass or trees.
Costs operational
10000.00 €
Costs operational information
Monitoring of the river bed
cost per year
Costs maintenance
0.00 €
Costs maintenance information
No project-specific maintenance needed
Economic costs other annual
98000.00 €
Financing authorities
Authority nameType of fundingCommentsFinancing share
European UnionEU-funds: LIFE+1.5 Million €33 %
Torrent and Avalanche ControlSub-national funds0.2 Million €4 %
Carinthian State GovernmentSub-national funds0.2 Million €4 %
Federal Ministry for AgricultureNational fundsForestry, Environment and Water Management 2.7 Mio €60 %
Policy and Governance
Policy description
The river bed is too narrow and there is a lack of brash and pebbles. As consequence the river bed became deeper, bank stabilization got insecure and flood plains inoperable.
Policy targets
Runoff control
Improved Biodiversity
Increase Water Storage
Target remarks
Flood control and flood risk mitigation
Soil formation and maintenance
Biodiversity and gene-pool conservation in riparia
Policy pressure
DirectiveRelevant pressure
WFD identified pressurePhysical alteration of channel/bed/riparian area/shore of water body for agriculture and transportation.
Pressure remarks
Bed load balance shall be achieved. Due to missing pebble supply the Drau river bed became deeper and deeper. Thus the groundwater level decreased, bank stabilization became insecure and flood plains inoperable.
Policy impact
DirectiveRelevant impact
WFD identified pressureAltered habitats due to morphological changes
WFD identified pressureDamage to groundwater dependent terrestrial ecosystems for chemical / quantitative reasons
Floods Directive identified pressureProperty
Floods Directive identified pressureInfrastructure
Requirement directive remarks
A good ecological status of the Drau should be achieved in order to meet the demands of the WFD.
Policy challenges requirements
The project follows a master plan for the development of the river. With RIWA-T technical guidelines are established that give priority to passive flood protection and take into account the ecological functions of a water body .
Part of a wider plan
Yes
Wider plan
Wider plan typeWider plan focusNameComments
Catchment-basedWaterwater body-development-conceptPlan made in the middle of 90s (93 or 94). Programme for the whole river Drau.
Public consultation
Yes
Consultation activities
Activity stageActivity type
Implementation phasepublic inaugauration feasts e.g. for the new dam or the different enlarged riverparts
Implementation phaseinformation day for school children
Implementation phasetree planting event for children
Design phasetourism concept, guided routes within the national park
Otherpost card showing before after pictures of the drau
Implementation phaseVIP event: Mimi Hughes (marathon swimmer and environmental activist swam through the drau until danube
Has contractual arrangements
No
Impacts and Monitoring

Monitoring System

Monitoring parameters
The monitoring is still ongoing for the riverbed. It is controlled whether bedload balance is reached and whether the erosion of the bed is stopped. Given that the Drau is let more freedom to form its river bed monitoring is done how the shape of the river develops. The biological monitoring is accomplished. The number of fisch, amphibian and insect species were counted

Maintenance

Maintenance requirements
There are no project-specific maintenance requirements. As for every river every few years grass will be needed to cut as well as trees.

Impact Assessment Methodology

Performance impact assessment method
Catchment outlet
Performance impact estimation information
-Assessment of aerial photos
- Geodetic survey of cross profiles (echolot)
- Laserscanning with drones
- Steel plates are on the bottom of the river in order to measure the transported load in size and volume with ultrasound
- Life space mapping

Socio-economic Impacts

Direct benefits
3250000
Direct benefits information
Total expenses for the implementation of the project given to regional companies, planning offices.
Ancillary benefits information
The tourism department definitetly benefitted from the Drau project but this cannot be quantified yet.

Biophysical impacts: Hydrology

Hydrological effects
Until mid 2011 28000 km3 were mobilized by the open checked dam and 16000 km3 arrived at the Drau. As consequence the bedload balance could be improved and the riverbed stabilized.
Information on retained water
No quantitative data. However riparian forests were planted and buffer stripes installed along the river shore. These measurements favour an increase of water storage capacity.
Information on increased water storage
No quantitative data. Side arms were reconnected to the main channel and the riverbed itself was enlarged. As a consequence storage capacity must have increased.
Information on runoff reduction
no data available

Biophysical impacts: Biodiversity

Improved biodiversity
Yes
Information on improved biodiversity
Number of amphibian species multiplied by six.
Number of insect and fish species increased as well, new habitats and higher habitat quality for fish and their breeding, more than 100 spider and ground beetle species several of which are endangered or threatened by extinction .

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
N/A info
Information on water quality overall
Riparian forests may act as buffers for diffuse pollution input for water from fields (nitrogen, phosphorous, herbicide flux).
Soil quality overall improvements
N/A info
Information on soil quality overall improvements
No monitoring is done on this aspect since it was not targeted in the project.

Biophysical impacts: Others

Ecosystem impact climate regulation
Increased permanent biomass
Information on ecosystem impact climate regulation
Given that buffer strips, riparian forests and meadows were created/restored permanent biomas has increased.
Lessons Learned
Key lessons
By adapting open check dams the bed load balance of a river can be improved. The reconnections of side arms, the creation of riparian forests and meadows support a greater biodiversity.
The adaptation of open check dams to improve bed load balance is possible. The widening of the river bed and the reconnection of side arms create larger habitat diversity and as consequence the number of species in the area rises.
Barriers
Barrier typeBarrier roleComments
OtherMain barrierThe project had to be replanned several times since farmers didn't want to sell ground or sell it for very high prices. Others changed their opinion suddenly and new possibilities openend up.
Lacking coordination between authoritiesSecondary barrierThere is always tension between the disciplines agriculture, nature protection and hydraulic engineering which have different priorities.
Drivers
Driver typeDriver roleComments
OtherMain driverErosion of the river bed was observed (becoming deeper and deeper). There was furthermore a risk that floodplains fall dry and can't operate anymore, as well as a risk of a falling ground water table.
Success factors
Success factor typeSuccess factor roleComments
Attitude of the publicMain factorSince the revitalization measures on the Drau are a subsequent project to former projects and measures, much less publicity had to be done. The responsibles hadn't to face the fears and worries of farmers and citizens.
Existing staff and consultant knowledgeMain factor20 years of experience exist on restoring the river to a more natural state. Moreover, there is good cooperation between the different stakeholders for nature conservation and hydraulic engineering.
OtherSecondary factorThe regional touristic department supported the measure and furthermore helped to merchandise the Drau project. They looked amongst others at the following questions: How to design picnic areas? Where are the best places for information boards? How can we conduct tourists through the region?
Attitude of decision makersMain factorThe purchase of land was combined with a reallocation of land process. Lots were exchanged between farmers. There were a lot of farmers willing to give land for the project and there was also political support of the action. A company constructing/operating hydropower plants had bought lots in the 90s. After their project of building 4 new power plants on the Drau was refused they were nevertheless ready to give their lots to the project partners for a fair price.
Flexibility / Adaptability
Since the river has freedom to form its bed, it will adapt the measures on its own. The adaptation of the measures by humans is linked with huge costs and difficult to execute.
Transferability
There has to be knowledge about the original characteristics of the river. Was it a branched or meandering river?
Sources