Summary
The maintained reserve “Dolna Topchiya” (Natura 2000 BG0000195 “Reka Tundzha 2”) was restored by RIEW–Stara Zagora through a diversion weir and a ~900 m channel linking the River Tundzha to the Malka Tundzha, to rewet riparian floodplain forest (habitat 91F0). In 2018–2024 the scope expanded under OP Environment project BG16M1OP002-3.007-0010 to also restore the inundation regime of the adjacent maintained reserve “Balabana” (Elhovo Municipality). Main works delivered in 2023: at Balabana, a water intake on the Tundzha and reconstruction of irrigation canals “Iztochen” (1,897 m), “Popovska 1” (879 m) and “Popovska 2” (863 m); at Dolna Topchiya, three gabion weirs (“Dipsiza 1–3”) with crest lengths 14/10/12 m to raise soil moisture. Contractor: Technostroy-Engineering 99 AD; supervision: IVPI Consult OOD. Total budget BGN 1,489,422.96 (ERDF + national co-financing). Closing press event: 21 Nov 2023; administrative end: 26 Apr 2024. The objective is to sustain riparian forests (habitats 91F0, 92A0) by re-establishing periodic flooding and groundwater recharge.
Photo gallery
Overview
Balabana: intake on the Tundzha and reconstruction of irrigation canals “Iztochen” (1,897 m), “Popovska 1” (879 m), “Popovska 2” (863 m) to convey water onto the reserve.
Dolna Topchiya: construction of three gabion weirs “Dipsiza 1–3” with crest lengths 14 m, 10 m, 12 m to raise soil moisture and promote inundation.
Weir + ~900 m channel linking the Tundzha to the Malka Tundzha
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Regional / sub-national water authority | Regional Inspectorate of Environment and Water Stara Zagora | Implementation | — | Responsible |
| Architects / Engineers | — | Implementation | Construction contractor | Supporting |
| Architects / Engineers | IVPI Consult OOD | Implementation | Construction supervision | Supporting |
| Regional / sub-national water authority | East-Aegean Basin Directorate (BD-IBR, Plovdiv) | Other | Approvals / coordination | Supporting |
Site Information
Design and Implementation
Financing
Policy and Governance
Impacts and Monitoring
Monitoring System
Water-body status (nearby Tundzha segments): biological elements (macrozoobenthos, macrophytes, phytobenthos) and physico-chemical indicators (BOD₅, ammonium, nitrite, total nitrogen, orthophosphate, total phosphorus), with exceedances periodically reported in RIEW/EARD documents.
Maintenance
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
A phased pathway—pre-project studies (2019), technical design and approvals (2020), then construction (2023) under a single beneficiary—helped bring a small, site-specific project to completion despite the long lead time to April 2024. Clear stewardship by RIEW–Stara Zagora and ring-fenced EU/national funding were pivotal.
Early coordination with the Basin Directorate, the municipality and the state irrigation company was formally required by the design tender; securing these alignments appears essential where rewetting depends on intakes/canals in protected areas.
Public communications emphasise delivered works (intake, canal rehabilitation, gabion weirs), but do not publish quantified hydrologic/ecological results to date—making it harder to evidence multi-benefit outcomes post-construction. Future replications should plan transparent monitoring and data release from the outset.
| Success factor type | Success factor role | Comments |
|---|---|---|
| Attitude of decision makers | Main factor | Single accountable beneficiary & site manager: RIEW–Stara Zagora led implementation for the maintained reserves. |
| Financing possibilities | Main factor | Stable finance package: OP Environment 2014–2020 (ERDF + national co-financing) with stated totals ensured delivery. |
| Existing staff and consultant knowledge | Secondary factor | Pragmatic engineering choices: re-using and rehabilitating existing irrigation canals (“Iztochen”, “Popovska 1/2”) to convey water to Balabana. |