Summary
The Slowing the Flow at Pickering project (2009–2015) set out to reduce flood peaks in Pickering, North Yorkshire, by harnessing natural processes across the Pickering Beck catchment. Key measures - four low-level earth bunds, over 160 leaky woody dams, moorland and forest drain‐blocking, riparian and farm woodland planting, sediment traps and no‐burn buffer zones - were installed to slow runoff, boost infiltration and store water temporarily.
Launched after costly floods in 1999-2007, the scheme offered a cheaper, landscape-scale alternative to hard defences. In 2015’s Boxing Day storm, none of the dozens of at-risk properties flooded, demonstrating the network’s effectiveness under extreme rainfall.
After the official end of the project in 2015, the site remained monitored. More recently, beavers have been introduced into a fenced adjacent catchment to work alongside leaky dams-early observations suggest they enhance dam stability and create richer wetland habitats. All measures remain in place, with ongoing monitoring and targeted maintenance ensuring sustained performance.
The site still has not been affected by a storm event of sufficient intensity to demonstrate the expected effectiveness of the measures to their full extent.
Photo gallery
Overview
Demonstrate the effectiveness of natural flood management methods compared to traditional grey infrastructures.
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Other | Forestry Commission | Financing | Forest policy and land management/ownership. Financing of project €127,675 | Responsible |
| National water authority | Environment Agency | Determination of design details of the measure | Expertise on design of measures. National agency responsible for flood management and WFD implementation. Financing of project €93,103 | Supporting |
| Regional / sub-national water authority | Regional Flood Defence Committee | Financing | Provides funding from local levy €179,310 | Supporting |
| Local water authority | North York Moors National Park Authority | Financing | Land management/ownership, planning authority within National Park. Financing of project €58,046 | Responsible |
| — | Ryedale District Council | Financing | Local planning authority and project financing €1,094,368 | Responsible |
| Other | Natural England | Financing | National agency responsible for natural heritage and agri-environment measures cover woodland creation. Financing of project €25,287 | Supporting |
| Other | Forest Research | Initiation of the measure | Project lead | Responsible |
Site Information
Design and Implementation
The presence of the historical steam train line in Pickering partially built on a fragile enbankement means more risks to take into account when designing projects having an hydrological impact.
Mapping data and catchment models from previous research had been used to identify sites for low level bunds. This research also involved stakeholder engagement which may have been important in overcoming barriers.
Opportunity mapping for woodland creation for flood risk reduction had also been undertaken.
Financing
€17,951 : riparian woodland (€2070/ha for native broadleaved, plus €2300/ha for flood risk management)
€27,782 : large woody debris dams (labour costs)
Policy and Governance
| Directive | Relevant pressure |
|---|---|
| Floods Directive identified pressure | Natural Exceedence |
| Directive | Relevant impact |
|---|---|
| Floods Directive identified pressure | Property |
| Requirement directive |
|---|
| Floods Directive-mitigating Flood Risk |
| Activity stage | Activity type | Comments |
|---|---|---|
| Design phase | Public meeting | Flooding: can local knowledge make a difference? Exhibition held at Pickering Memorial Hall by the Ryedale Flood Research Group. Around 200 people attended the exhibition and were able to read about the group's work, watch video clips, talk to group members and try their hand at modelling |
| Design phase | Public meeting | Community engagement event. This public event in the Memorial Hall Pickering, was held to enable the project team to engage the community and stakeholders and involve them with identifying and implementing solutions on the ground. |
| Implementation phase | Media releases | Variey of media (web, press, radio) coverage at local/regional and national levels |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Benefits estimates for flood regulation are based on the actual costs (2007) or estimated per property flooded costs (2000) of previous flood events adjusted by flood return periods and extent of alleviation offered by measures.
Other ecosystem service benefits are estimated using a variety of approaches.
The overall assessment is based on a cost-benefit test of net present values of benefits over 100 years.
Socio-economic Impacts
All values converted using €1 = £0.87 (average 2011 value).
Mean annual (€/yr)
Habitat creation: 139,683
Flood regulation: 6,855
Climate regulation: 123,029
Erosion regulation: 236
Education and knowledge: 16
Community development: 631
Biophysical impacts: Hydrology
Based on estimated peak flow reductions, the joint impact of 50 ha of riparian woodland planting and 100 large wood debris dams is estimated at between 15,000 and 53,000m3 for the 2000 and 2007 flood events respectively. However new planting of woodland was only considered to be acceptable at only 4 sites covering 4.1ha. From the source it is not possible to disaggregate the impacts of measures F1 and F10 so care is advised in using these values.
The combined peak flow reductions of for a modelled 50ha of riparian woodland and 100 large wood debris dams was estimated at 0.8 and 2.2 cumecs for the 2000 and 2007 flood events respectively. However new planting of woodland was only considered to be acceptable at only 4 sites covering 4.1ha.
Biophysical impacts: Biodiversity
The introduction of beavers in an adjacent catchment is being monitored for future biodiversity effects.
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Long-term monitoring is essential. Impacts take time to show, and baseline data often comes late. The measures still haven’t faced a 1-in-25-year flood.
A proactive, flexible approach from partners is key. Strong communication and willingness to adapt (e.g., to maintain structures) are essential.
Community engagement: Expectations must be managed realistically. Community involvement worked well, but clearer messaging on NFM limitations is needed.
Locals support whole-catchment natural flood management (NFM), but NFM should be seen as part of a wider flood management strategy, not a stand-alone solution.
Maintenance: Structures like bunds and leaky dams need upkeep. Some have decayed as expected; replacements and natural evolution (e.g. with beavers) help.
Support & policy: Volunteer-led projects need long-term funding and integration into national flood management policy to stay effective.
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Main driver | A flood alleviation capital scheme was also proposed but deemed unaffordable under current national cost-benefit thresholds. |
| Other | Main driver | Willingness to create a demonstration site to expose and assess the effectiveness of natural flood management methods. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Existing institutional framework | Main factor | Land ownership was relatively concentrated with around 50% of catchment in either public ownership (Forestry Commission and the North York Moors National Park Authority) or the Duchy of Lancaster Estates. |
| Available support tools | Secondary factor | The catchment had been subject to hydrological modelling as part of a previous academic study. |
| Attitude of the public | Secondary factor | Ongoing process of stakeholder and community engagement in both the aims and delivery of the project. |
| Other | Main factor | Land Control was probably the main success factor. There have been unsuccessful attempts to duplicate these measures on sites with multiple private owners, due to the lack of willingness of owners to participate. |
This may encourage further uptake of measures including better management of existing riparian woodland (in-fill planting, encouraging regeneration).