Paros island has a typical Mediterranean climate with high temperatures and limited rainfall during the dry months. As a result, Paros suffers from excessive droughts, which is amplified by tourism and the overuse of water resources.

Country
Greece
NUTS2 Code
Νότιο Αιγαίο (Notio Aigaio)
Sponge measures implemented in the case study
Peak flow control structures
Restoration of natural infiltration to groundwater
Check dams
Objectives
Increase water retention capacity (by constructing 34 small retention ponds).

Enhance groundwater recharge.

Improve biodiversity (support habitats for flora and fauna).
Involved partners
Authority typeAuthority nameAuthority roleCommentsAuthority responsibility
NGOWWF GreeceImplementationWWF Greece, in collaboration with local stakeholders, such as the Municipality of Paros and Paros Water Supply & Sewerage Company, coordinates the implementation and design of the traditional stone weirs. Their role includes project planning, stakeholder engagement, and monitoring the environmental and socio-economic outcomes of the intervention.Responsible
—Local stakeholders—Local stakeholders are particularly interested in the possibilities to mitigate droughts and prevent or reduce local flood risks, both in the rural and urbanized areas. Local stakeholders include provincial government, drinking water company (Paros), farmers, NGOs -Boulouki) and volunteers.—
NGOMedINA—Mediterranean Institute for Nature and Anthropos—
OtherArchilochos Cultural Association———
Local water authorityParos Water Supply and Sewerage Company———
Site Information
Climate Zone
Warm temperate dry
Temperature (°C)
18.00 °C
Soil type
Regosols
Vegetation class
Mediterranean dryland grasses and hydrophytic plants around check dams (post-intervention)
Design and Implementation
Project scale
Meso
Project scale specifications
1.3 km of stream
Project area
The NWRM covers an area of approximately 5.9 km² (or 590 ha).
Project area specifications
The area of the river basin where the check dams were constructed. 34 stone check dams constructed along the riverbed
Size unit
m
Basis of design
The traditional stone weirs are designed to collect and retain small amounts of water and improve groundwater recharge during dry periods. The design aims to reduce water velocity and create small biodiversity hotspots. The weirs also contribute to flood mitigation by slowing down water flow.
Factor constraints
Limited rainfall and high evaporation in the region.
Potential constraints due to local topography and the riverbed’s natural flow.
Geology.
Accesibility.
Availability of stones.
Slope
Favourable preconditions
The Mediterranean climate and the calcareous soil of the region provide a natural environment conducive to water retention, making this an ideal area for implementing the stone weirs.
Low cost of the measure
Stones availability
Financing
Total cost information
The total investment costs include the construction of 34 check dams, ongoing monitoring, and coordination efforts between stakeholders. Specific figures for total costs are not mentioned beyond individual funding sources.
Costs investment information
The total investment for the project includes the construction of 34 stone weirs and other infrastructure, as well as contributions to monitoring and coordination efforts among stakeholders.
Costs capital information
The capital costs are primarily the costs related to the construction of the check dams, including the use of local stones and traditional building techniques.
Costs land acquisition information
The project does not mention any land acquisition costs because the project seems to utilise existing land under the jurisdiction of local stakeholders like the Municipality of Paros.
Costs operational information
The project is designed with low maintenance requirements, as it uses traditional stone structures that are sustainable and require minimal intervention.
Costs maintenance information
Maintenance costs would likely involve minor upkeep of the stone weirs to ensure continued water retention and vegetation support.
Costs disposal decommissioning information
The project does not specify any decommissioning costs since it is based on sustainable, low-maintenance infrastructure that is not intended for removal.
Administrative annual cost information
Administrative costs mainly related to coordination of monitoring activities and collaboration between local stakeholders
Compensations scheme information
No compensation scheme is mentioned for this project.

Policy and Governance
Policy description
The project addresses water scarcity in small Mediterranean islands by reviving traditional stone weirs to increase water retention and groundwater recharge, support local biodiversity, and mitigate flood risks.

Aiming at increasing the sponge functioning of the stream and enhancing its capacity to support biodiversity, WWF Greece together with Mediterranean Institute for Nature and Anthropos (MedINA), Paros Municipality, Paros Water Supply & Sewerage Company and Boulouki built 34 traditional dry-stone check dams along 1300 meters of the stream in June 2022.
These semi-permanent low-height structures, historically designed to collect small amounts of water for irrigation, also serve a dual purpose: by reducing flow velocity they allow more water to infiltrate into the soil, and by retaining water, they create shallow ponds that are biodiversity hotspots, critical for flora and fauna during dry periods.
Policy targets
Increase Water Storage
Groundwater Recharge
Improved Biodiversity
Target remarks
The primary targeted problem is water scarcity due to low rainfall, high evaporation, and increased water demand, particularly in islands with high tourism.
Policy pressure
DirectiveRelevant pressure
WFD identified pressureWater Scarcity
Pressure remarks
The project primarily addresses the pressure of water scarcity, which is exacerbated by climate change, urbanization, and tourism activities in the region.
Policy impact
Directive
WFD identified pressure
Impact remarks
The impact of the project is expected to include increased water availability, improved biodiversity, and enhanced ecosystem services in arid island systems.
Requirement directive
Requirement directiveSpecification
Water Framework Directive (WFD) 2000/60/EC—
Other EUEU Strategy on Adaptation to Climate Change
Other EUWater Resilience Strategy
Other EUEU Biodiversity Strategy for 2030
—The Greek National Adaptation Strategy
—National Biodiversity Strategy- Greece
Requirement directive remarks
The project aligns with the EU Water Framework Directive (WFD), contributing to the sustainable management of water resources and the protection of aquatic ecosystems.
Policy challenges requirements
The project addresses the challenge of managing water resources in arid and semi-arid regions, with an emphasis on providing water for both human and ecological needs.
Part of a wider plan
Yes
Wider plan
Wider plan typeWider plan focusNameComments
RegionalWaterMediterranean Islands Collective Action PlanWater conservation, biodiversity, climate adaptation
Public consultation
No
Has contractual arrangements
No
Impacts and Monitoring

Monitoring System

Monitoring requirements
Biodiversity, surface water level, soil moisture
Monitoring parameters
While such check dams have been widely used for water management in the Mediterranean region for hundreds of years, our knowledge of their contribution to water availability (especially groundwater recharge) is limited. To support the case study, pre- and post- monitoring actions on biotic and abiotic factors are being conducted to monitor the impact of the dry-stone check dams on groundwater levels and biodiversity.


Biotic factors (biodiversity)
Abiotic factors (groundwater levels)-Pre and post monitoring of aquifer level by the project team.
Presence of formal monitoring system
Biodiversity: 4 stations with pitfall traps, 4/ Year; Surface water level and Soil moisture: 2 stations with sensor, continuously

Maintenance

Maintenance requirements
Low

Impact Assessment Methodology

Performance impact assessment method
In-Stream
Performance impact estimation information
The performance of the check dams was evaluated based on groundwater recharge, surface water retention, and biodiversity (flora and fauna surveys). Monitoring focused on measuring the extent of groundwater recovery, the formation and persistence of shallow ponds, and the development of vegetation.
Biophysical impact assessment method
Biotic Factors: Monitoring of flora and fauna, species diversity, and vegetation growth.

Abiotic Factors: Monitoring water retention, groundwater levels, and pond formation and persistence.

Data Collection: Pre and post-construction monitoring was carried out to determine the impact on local biodiversity and hydrological conditions.
Cost assessment method
Estimations were made based on the implementation costs of building the 34 check dams, ongoing monitoring expenses, and coordination between stakeholders. Costs are considered low due to the simple construction techniques.

Socio-economic Impacts

Benefits and co-benefits
Increase crop production: only small-scale local agriculture benefited
Amenity (number of visitor/year): increases stream amenity
Well-being: related to amenity
Tourism (number of people): ecotourism
Flood risk management: reduce flood risk
reduce downstream flooding (e.g., number of properties, number of people, both): reduce flood risk
Direct benefits
The direct benefits of this project include water retention, groundwater recharge, biodiversity improvement, and the creation of habitats for endangered species. Additionally, there is a benefit for human activities downstream, as the check dams also provide flood mitigation.
Ancillary benefits information
The ancillary benefits include the revival of traditional techniques, enhanced skills through training, and the creation of recreational opportunities related to the restored ecosystems. The project also contributes to increased resilience to droughts.
Negative / Other impacts
Access restrictions of some areas: some check dams are located in remote areas
Constrasting laws at different territorial level and need for policy changes: current policies allow high number of drillings and the removal of vegetation for flood management purposes, constrasting the benefits of the sponge measure

Biophysical impacts: Hydrology

Ecosystem water supply
The check dams help moderate water flow

Biophysical impacts: Biodiversity

Improved biodiversity
Yes
Lessons Learned
Key lessons
The application of this measure in Paros Island is a good example of a project where biodiversity is enhanced, the dissemination of the outcomes is at the local and national level, and where local authorities and communities have a good attitude and acceptance towards a project.
Barriers
Barrier typeBarrier roleComments
Lacking financing sourcesMain barrierInitial financing challenges were overcome through partnership development and engagement with local and international stakeholders.
Limited staff and consultant knowledgeMain barrierInitial lack of knowledge on monitoring
OtherMain barrierDifficult accessibility in remote areas
OtherMain barrierNo data before the implementation
Expected maintenance needsMain barrierDifficulties with groundwater monitoring
Attitude of relevant stakeholdersMain barrierUnsustainable agricultural practices by local farmers
Drivers
Driver typeDriver roleComments
OtherMain driverThe project was initiated in response to the environmental challenges posed by climate change, particularly on small islands where water scarcity is becoming more acute due to low rainfall and high evaporation rates.
OtherMain driverStrong expertise by locals and partners on traditional structures
Organisation committed to itMain driverCooperation with partners and stakeholders (NGOs, municipal authorities, local community, volunteers)
OtherMain driverNo conflicts due to the public state of the land and social acceptance
OtherMain driverLow-budget intervention and cost-effectiveness
Success factors
Success factor typeSuccess factor roleComments
Attitude of relevant stakeholdersMain factorEngaging local stakeholders from the start ensured community buy-in and effective implementation. The simplicity of the design also ensured low maintenance costs, making it a sustainable solution.
OtherMain factorAppropriate check dam design and siting
OtherMain factorMeasured benefits (surface water, groundwater, biodiversity)
Cost effectiveness
The intervention is highly cost-effective due to the use of local materials (stones) and the low maintenance requirements of the check dams.
Flexibility / Adaptability
The project demonstrates flexibility in terms of scaling up the stone weir method, which can be adapted for use in other Mediterranean islands with similar conditions.
Transferability
The approach of using traditional stone weirs can be easily transferred to other Mediterranean islands facing similar water scarcity issues. Given that the technique relies on locally available materials and simple construction methods, it is adaptable to various regions with similar environmental challenges. The geological, topographical and hydrological characteristics must be suitable for this measure
Basin characteristics influence
The calcareous soil and Mediterranean climate of the basin (high evaporation rates, low rainfall) strongly influence the effectiveness of the check dams in promoting water retention and supporting local biodiversity.