Summary
Restoration of two wetlands along the Danube River within Persina Nature Park, through engineering works including sluices, channels, dykes and access roads, enabling controlled flooding, water flow to former wetlands, nutrient retention, and recovery of biodiversity and fish populations. Baseline data on water, birds, fish, mammals, reptiles and vegetation were collected for monitoring.
Implemented 2002–2008 by the Bulgarian Ministry of Environment and Water, with main funding from the Global Environment Facility (GEF) via the World Bank, the project also covered the Kalimok-Brashlen and Belene Islands Complex. Works improved hydrological connectivity and reduced pollution, supported by WWF Bulgaria and local communities.
Subsequent initiatives have continued restoration and management, including sluice maintenance, construction of a pelican nesting platform, and reintroduction of the white water lily. In 2025, the Persina4Nature project, under the DANUBEPARKS network, was launched to promote citizen science for wetland conservation and monitoring, further enhancing ecological and community engagement outcomes.
Photo gallery
Overview
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| National water authority | Government of Bulgaria, Ministry of Environment and Water | Implementation | and Financing | — |
| Local water authority | Persina NP Directorate (NPD) | Monitoring | Long-term maintenance and monitoring of impacts | — |
| Regional / sub-national water authority | Dabube River Basin Directorate | Monitoring | Monitoring of WFD compliant quality elements, integration into RBMP | — |
| NGO | WWF Bulgaria | Monitoring | Partner in restoration/management follow-up (incl. work at Kaikusha; later practical actions such as infrastructure and habitat measures). | Supporting |
| NGO | BSPB (Bulgarian Society for the Protection of Birds) | Implementation | Co-implemented pelican platform with Persina NPD and WWF. | Supporting |
| Other | Belene Prison Administration | Other | Land user (agriculture/pasture) in western Persin; part of site jurisdiction. | Responsible |
Site Information
Design and Implementation
Besides this goal, the project design follows the objectives related to the biodiversity conservation and the principle of conformity with the management objectives of the protected sites.
Other key factors were the shape and depth profiles of the former wetlands, design of the old dykes, hydraulic parameters of Danube River (flow, water level and seasonal fluctuations) as well as the desired water regime for the wetlands biodiversity.
Financing
Policy and Governance
| Directive | Relevant pressure |
|---|---|
| WFD identified pressure | 4.1.1 Physical alteration for flood protection |
| WFD identified pressure | 4.1.2 Physical alteration for agriculture |
| WFD identified pressure | 1.1 Point – Urban waste water |
| WFD identified pressure | 2.2 Diffuse – Agricultural |
| Directive | Relevant impact |
|---|---|
| WFD identified pressure | Nutrient pollution |
| WFD identified pressure | Altered habitats due to morphological changes |
| Requirement directive | Specification |
|---|---|
| WFD-achievement of good ecological status | Mitigation of nutrient pollution and morphological alterations |
| WFD-restoring a HMWB | Lower Danube is described as HMWB in DRBMP |
| WFD-achieving objectives for Protected areas | Natura 2000 |
| The Birds and Habitat Directives | EU-Directive 79/409/EEC (Birds Directive 1979) EU-Directive 92/43/EEC (Habitats Directive) |
National Wetlands Conservation Plan of Bulgaria
National Biodiversity Strategy
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
| National | Environment & Biodiversity | GEF Black Sea/Danube Strategic Partenrship-Nutrient Reduction Investment fund | Bulgaria's strategy for nutrient reduction, biodiversity and agriculture and rural development. |
| Activity type | Comments |
|---|---|
| Public and media outreach | The aproach ensure public awarenes |
| Training and consulting of local | Local consulting in Belene, 30th of June, 2002, 25 participants and in Slivo Pole, 31th of June, 20. |
| Project promotion | Public support as well as support of public institutions and donor community in the country. |
| Environmental education | — |
| Arrangement type | Name |
|---|---|
| Contractual agreement | Global Environmental Facility Trust Fund Grant Agreement |
Impacts and Monitoring
Monitoring System
Biodiversity benefits: Monitoring of the total number of protected species and the quantitative status of target species.
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Chance for future tourism development in the region, new employment opportunities and economic benefits due to fishery and biomass production as well as for protection of the Danube river basin from nutrient pollution inccreasing and improving the water quality. The project has also introduced a new idea that wetlands are not a necessary evil, making the landscape attractive.
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Aquatic macrophytes: Water lilies (protected species) were reintroduced and have returned to Persina’s marshes following restoration actions.
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
When many stakeholders are involved, longer groundwork is essential. Participatory approaches to restoration design proved critical for success, as the project depended on changing people’s perceptions of wetlands and securing full support from authorities and local communities. The work of the Protected Area Local Consultative Councils and targeted public-awareness campaigns effectively supported this involvement.
Controlled restoration has provided a platform for large-scale experimentation and for studying nutrient-trapping processes under real conditions. This approach allowed managers to adjust operations based on ecological feedback and hydrological performance.
A solid understanding of both the baseline conditions and the desired future ecosystem state should be embedded early in the design phase. While baseline water-quality and biodiversity data were collected, the project itself recognised that long-term monitoring—10 to 15 years—would be needed to fully assess nutrient retention and other hydrological benefits. The absence of easily accessible long-term datasets today limits the ability to quantify these outcomes.
The case also shows that restoration is not a one-off action. Follow-up measures such as hydraulic-structure maintenance, reintroduction of aquatic plants, and creation of nesting platforms have been essential to sustaining ecological gains and adapting to changing environmental conditions.
| Driver type | Driver role | Comments |
|---|---|---|
| Legal obligations | Main driver | The Environmental Program for the Danube River Basin as a `preemptive measure to prevent river Danube and Black Sea water pollution from reaching catastrophic proportions` |
| Legal obligations | Main driver | Danube Pollution Reduction program (DRP) |
| Success factor type | Comments |
|---|---|
| Attitude of relevant stakeholders | The intensive stakeholder involvement during design and implementation created strong ownership and sustainable Project outcomes |
| Financing possibilities | The overall co-financing proveded by government substantially exceeded amounts agreed at appraisal. |
| Existing staff and consultant knowledge | Bank and Gobernment cooperation was in timely attention to critical implementation issues. |
The first follow-up Project, “Kaikusha”, under EU LIFE+ program helps develop feasibility studies to restore the Kaikusha Marshes in the Danube River basin.