Résumé
At Locquirec’s Moulin de la Rive, the old aqueduct and undersized culvert on the Lapic blocked fish migration and sediment transport and created a drop that proved impassable, despite the site being a priority action zone for eel and sea trout. Rescue electrofishing during works confirmed the barrier effect, with far fewer eels and trout upstream than downstream. The project replaced the structure with a 20 m precast frame bridge set 60 cm lower than the former invert, restored a more natural bed with stone and blocks, and added a concrete control wall at the inlet so that high flows can safely spill into the upstream wetland reedbed. The design also integrates a faunal shelf for mammals and bat roosting blocks under the deck, and it secured vulnerable sewer lines that lay near the channel bed. Implementation required careful coordination around numerous underground utilities and a tight spring window to avoid the summer tourism season, combined with strong, proactive communication with residents, surfers and local associations. Traffic on RD64 was diverted from 17 March, and the route reopened ahead of schedule on 30 April 2025. Funding came from Agence de l’Eau Loire-Bretagne, Région Bretagne and Morlaix Communauté. Early observations show fish passage working, otter prints upstream and downstream, macrophyte recovery and rapid revegetation of disturbed zones. The project contributes to WFD ecological continuity targets in a basin facing multiple pressures, including agricultural pollution, hydrocarbons from runoff and intensive anthropogenic footprint.
Photo gallery
Vue d'ensemble
Re-establish sediment transport
Reduce submersion risk at 30 and 100-year horizons while enabling flood expansion into the upstream reedbed
Protect vulnerable sanitation networks at the crossing
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Local water authority | An Dour (for Morlaix Communauté) | Initiation of the measure | Client, coordination, communication, works delivery | Responsible |
| Architects / Engineers | Verdi Environnement | Determination of design details of the measure | Pre-project diagnosis | Supporting |
| — | ING Concept | Determination of design details of the measure | Design and works phases, technical details, public procurement. | Supporting |
| Architects / Engineers | Colas | Implementation | Works execution including installation of the 20 m frame. | Supporting |
| National water authority | DDTM | Other | Regulatory support and validation. | Supporting |
| Regional / sub-national water authority | DDTM | Other | Regulatory support and validation. | Supporting |
| Other | Fisheries stakeholders | Other | Fédération de pêche du Finistère; AAPPMA Morlaix. Technical inputs, fish rescue, continuity. | Supporting |
| Local water authority | Locquirec Municipality | Implementation | Institutional partner and communication. | Supporting |
| Other | Morlaix Communauté transports | Other | Bus detours and schedule adjustments | Supporting |
| NGO | Local associations. | Other | Surfing Playa; Surfing Locquirec; Les Amis du Moulin de la Rive; FORCE5; local conservation groups. Local stakeholders engaged via meetings and communications. | Supporting |
Site Information
Design and Implementation
Lower-impact construction approach with sheet piles and limited earthworks to reduce nuisance
Frame set 60 cm lower than previous invert to restore grade
Inlet control wall to allow floodwater to spread onto the upstream reedbed
Faunal shelf under deck and bat roosting blocks
Channel bed recharge with stones and blocks for habitat diversity
Sandy soils
Busy departmental road requiring detours and bus rescheduling
Financing
Geotechnical Study (Kornog Géotechnique) = €7,782;
Preparatory Work (Kerne Pruning: Felling/Girobroyage) = €17,562
Works (COLAS SA) = €366,087;
Communication (Sky Arts/Norwest Design/Le Friant advertising) = €12,897
Policy and Governance
Maintain service for transport and sanitation networks during works
| Wider plan type | Wider plan focus | Name |
|---|---|---|
| Catchment-based | Water | Territory contract with Agence de l’Eau Loire-Bretagne |
| Activity stage | Activity type | Key issues | Comments |
|---|---|---|---|
| Implementation phase | Intensive communication | Broadly supportive public after intensive communication | Professional videos and social media series, photo exhibition, educational panels |
| Screening phase | Information meetings with local groups, municipal presentation, public meeting | — | With about 80 participants |
| Arrangement type | Name | Role |
|---|---|---|
| Institutional arrangement | Delegation of project management with the Département. | Department is the road owner. It delegated to An Dour the project owning for this site and for a limited time. |
Impacts and Monitoring
Monitoring System
Follow-ups planned at 2 and 5 years
Visual inspections of hydraulics and wetland expansion
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Lessons Learned
| Driver type | Driver role | Comments |
|---|---|---|
| Balancing different objectives | Main driver | Significant ecological and risk-management stakes |
| Organisation committed to it | Main driver | Availability of subsidies and a territory contract framework |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Existing staff and consultant knowledge | Main factor | Competent MOE and contractors |
| Public participation | Main factor | Early and sustained multi-stakeholder engagement, including owners and local groups |
| Communication activities | Main factor | Intensive, anticipatory communication |
| Successful coordination between authorities | Main factor | Good coordination across technical, financial and local actors |