Résumé
The Timonchio Retention Pond was implemented in 2019 within the LIFE BEWARE project as an innovative response to increasing drought risk and climate variability in an agricultural landscape. The intervention consists of a retention pond covering approximately 0.295 ha and connected to a watershed of around 110 ha.
The pond was designed to store runoff during wet periods and make water available for agricultural uses during drought conditions, while simultaneously reducing flood risks and creating new ecological habitats. The measure directly benefits approximately 16 ha of agricultural land through improved irrigation reliability.
The project emerged from strong cooperation among public authorities, farmers and water managers, demonstrating how collaborative governance can facilitate the implementation of nature-based solutions in agricultural areas.
Photo gallery
Vue d'ensemble
| Authority type | Authority name | Authority role | Comments |
|---|---|---|---|
| Other | Municipality of Marano Vicentino | — | -> Which benefits from the hydraulic risk reduction service. -> Project promoter. |
| Other | Alta Pianura Veneta Reclamation Consortium | Implementation | -> Which manages the sponge measure. -> Construction management and maintenance. |
| Other | The Veneto Region Agency for Innovation in the Primary Sector (Veneto Agricoltura) | — | -> Which designed and realised vegetation planting. |
| Research institute / University | University of Padua | — | Department of Land, Environment, Agricultura and Forestry |
| Private property owners | Local farmers and landowners | — | — |
Site Information
No information provided for this section.
Design and Implementation
No information provided for this section.
Financing
Annual expenses: €17 190 =
-> Routine vegetation maintenance: mowing costs 12 690 €/year
-> Ordinary maintenance: cleaning and sluice management 3 500 €/year
-> Extraordinary cleaning: cleaning interventions 1 000 €/year
Long term expense: There is a long-term extraordinary maintenance cost of €25,000 every 30 years for geomembrane replacement.
Ongoing costs: Regular monitoring costs are expected to be high but have not yet been quantified.
Policy and Governance
Impacts and Monitoring
Monitoring System
Socio-economic Impacts
The retention pond has generated substantial ecosystem services, including ecological improvements alongside its water management functions.
The measure has generated substantial biodiversity improvements through the creation of aquatic and riparian habitats. Monitoring activities documented the establishment of eight new bird species and four amphibian species, together with the planting of more than 2,200 native plants. These results demonstrate the capacity of water retention measures to support habitat restoration and biodiversity conservation.
The intervention also contributes to flood risk reduction by temporarily storing runoff during heavy rainfall events, providing benefits to downstream communities and agricultural land.
Biophysical impacts: Biodiversity
-> Riparian Habitat Restoration: Included in project area
-> Biodiversity Enhancement: + 12 species
-> Vegetation Restoration: 2,200 plants of 8 species
Lessons Learned
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Main driver | In Veneto, Italy, floods, landslides, and erosion have significantly affected the region. Municipalities face increased flood risks due to rising land consumption, more in northern Italy. Santorso and Marano Vicentino, in Vincenza's north, use sponge measures to counter pluvial flooding and improve rainwater management. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Attitude of relevant stakeholders | Main factor | The most important success factor was the strong collaboration established among farmers, the Municipality of Marano Vicentino and the Alta Pianura Veneta Reclamation Consortium. Clear agreements regarding land availability, construction responsibilities and long-term management enabled the intervention to be implemented efficiently and accepted by local stakeholders. |
Future projects should prioritise stakeholder engagement from the earliest planning stages and establish clear maintenance responsibilities before implementation. Particular attention should be devoted to ecological design and species selection, as these decisions strongly influence long-term performance and maintenance requirements.
Policy Recommendations:
Dedicated funding schemes are needed to support post-project monitoring and maintenance. Policy frameworks should also encourage collaborative governance arrangements involving farmers, municipalities and water authorities, which proved essential for the success of this intervention.
Sources
No information provided for this section.