Restoration of the Sumava peatbog, Czech Republic

Résumé

Summary

Soumarský Most (Šumava NP) is a raised bog once almost destroyed by industrial peat mining. In 2004, the park and local authorities restored the site with national funding, re-establishing wetland and peat-forming vegetation and improving the water regime; hydrology and vegetation were monitored from 2000–2011. Soumarský Most is the first former industrial restored bog in the Sumava region. Since then, outcomes are visible on the ground: a 1.5-km nature trail opened in 2012 to interpret the restoration, and in 2022 the boardwalk had to be rebuilt as groundwater has steadily risen for nearly two decades : evidence the rewetting is functioning. In June 2025 the wooden lookout tower was closed for safety and is being redesigned; the trail remains open. Biodiversity has responded: 371 moth and butterfly species were documented in 2011–2016, including bog specialists recolonising from nearby peatlands. Community involvement continues, e.g., volunteers built peat dams on drainage channels in 2019 to further raise water levels. Overall, Soumarský Most shows lasting hydrological recovery and conservation benefits following peatland restoration.

Photo gallery

Vue d'ensemble
Year of issue
2025
Project
NWRM
Implementation status
Ongoing
Contact
REC
Location of the project
On the left bank of the Teplá Vltava near the hamlet Soumarský Most, ~0.5 km off Road I/39 (Volary → Lenora); the trail starts by the Soumarský Most campsite/rail halt.
Country
Czechia
NUTS2 Code
Jihozápad
Sponge measures implemented in the case study
Check dams
Wetland restoration and management
Mulching
Objectives
Rewet the mined bog using the Target Water Table concept; block and infill drainage ditches, re-establish natural water flows, and reintroduce peat-forming species (Sphagnum, Eriophorum, Carex rostrata). Implementation metrics recorded for this site: ~500 dams and ~9 km of ditches blocked over ~55 ha (2003–2004).
Involved partners
Authority typeAuthority nameAuthority roleAuthority responsibility
Private property ownersRaselina SobeslavImplementationResponsible
Regional / sub-national water authoritySumava NPFinancingResponsible
Local water authorityPLA AuthorityFinancingSupporting
Site Information
Climate Zone
Cool temperate moist
Precipitation
760.00 mm
Temperature (°C)
6.20 °C
Runoff coefficient
0.10
Elevation range
780 m
Slope range
<2
Vegetation class
Bog pine (Pinus rotundata) forest and dwarf shrub vegetation dominated by Vaccinium uliginosum.
WFD Ecological status
Moderate
WFD Chemical status
Failing to achieve good
Water quality status
the principal pressure was industrial peat mining and drainage
Design and Implementation
Project scale
Micro
Project scale specifications
single site; restoration focused on a specific mined bog of tens of hectares
Project area
53 ha
Principles
Drainage removal / check-dam system: Historical drainage rills and ditches were blocked with a system of wooden/peat check dams and by ditch infilling to lift and level the water table. (This is documented for Soumarský Most in NP materials and the site-focused diploma thesis; public sources do not state a verified dam count for this site.)
Artificial shallow depressions (“pools”) were created locally to retain surface water and provide early wet microhabitats on the mined surface.
Mulching of bare peat with cut biomass from nearby peat-meadows (e.g., Malá niva / Stožecké louky area) to suppress evaporation, buffer temperature, and carry diaspores; Sphagnum pieces were also hand-placed in wet spots.
Assisted revegetation trials: reintroductions of Carex rostrata and Eriophorum angustifolium, plus broadcasting of Sphagnum, were tested at Soumarský Most; natural expansion of Eriophorum vaginatum was recorded in the first decade post-restoration.
Selective removal of self-seeded trees on parts of the mined field to keep the surface open and wet during early phases (reported in the site thesis’ restoration chapter).
Visitor infrastructure adapted to wetter ground: a 1.5 km educational trail with a 9.2 m wooden lookout tower.
Financing
Total cost
169229.00 €
Total cost information
3193€/ha for the initial resoration
Further developments (touristic paths, lookout tower, etc.) are not included.
Financing authorities
Type of fundingCommentsFinancing share
Sub-national fundsManagement programmes, Sumava NP and PLA Authority100 %
Compensations
Non
Policy and Governance
Policy description
A raised bog almost completely destroyed by industrial peat mining and drainage; the programme’s aim was to rewet and restart peat-forming processes. This aligns with WFD hydromorphological alteration from drainage & channelization.
Land ownership
The land belongs to the town of Volary; the NP administration manages public access and conservation via agreements/lease.
Policy targets
Improved Biodiversity
Part of a wider plan
Non
Public consultation
Oui
Consultation activities
Activity stageActivity typeComments
OtherTourist information pointwith connection to the nearby Vltava river floodplain.
Has contractual arrangements
Non
Impacts and Monitoring

Monitoring System

Monitoring requirements
Šumava NP has run long-term hydrology and vegetation monitoring here (documented 2000–2011 and continued within the park’s programme since 2005).
Monitoring parameters
Within the Šumava NP mire-monitoring framework, key variables include water table, hydrochemistry (pH, conductivity, DOC, SO₄, NO₃, NH₄, PO₄, Ca, Mg, Al, Fe), vegetation, and microclimate (air/soil temperature & moisture); these underpin evaluations of restoration success at restored bogs like Soumarský Most.

Maintenance

Maintenance requirements
Low-intensity, episodic works led by Šumava NP—e.g., 2024 central-canal blocking and peat infill plus ongoing boardwalk upkeep, to protect the recovering mire and guide visitors.

Impact Assessment Methodology

Performance impact assessment method
Catchment outlet
Performance impact estimation information
Continuous hydrology and vegetation monitoring between 2000 and 2011

Socio-economic Impacts

Direct benefits
Visitor infrastructure investment: the 2022 boardwalk project cost CZK 4.5 million (excl. VAT); the trail concentrates visitors away from recovering peat surfaces. (Tower closed in 2025 for safety; new one planned.). It supports eco-tourism while concentrating footfall; volunteer events and work with the municipality of Volary accompanied the restoration.

Biophysical impacts: Hydrology

Information on retained water
Groundwater has risen progressively for ~20 years following the 2001–2004 re-wetting (ditch blocking and mulching). Šumava NP states that “for almost 20 years since revitalisation, water has been gradually returning,” to the point the trail could no longer be crossed “dry-foot.” This sustained high water forced a full boardwalk rebuild in Aug–Oct 2022, officially justified by the damage from rising groundwater; access was temporarily closed. Persistent wetness also contributed to structural rot of the viewing tower, which the park closed in 2025 pending a replacement. While a tourism facility issue, it evidences continuously wet conditions on site.

Biophysical impacts: Biodiversity

Improved biodiversity
Oui
Information on improved biodiversity
Sphagnum mosses were reintroduced, especially into the shallow basins. The initial vegetation was dominated by wetland species growing mostly on the wet bases of the draining dithces.
Lepidoptera: 371 moth and butterfly species recorded in 2011–2016 at Soumarský Most; specialists (tyrphobionts/tyrphophiles) are recolonising from nearby pristine bogs in Vltavský Luh.
Fungi: 2017–2021 fruit-body surveys at Soumarský Most found few target peatland indicator taxa (e.g., Sarcoleotia turficola, Cortinarius tubarius), but the site is mycologically valuable—indicative of early-to-intermediate successional recovery.
Protected fauna context: seasonal access closures remain to protect black grouse (tetřívek) using the area.

Biophysical impacts: Others

Information on other biophysical impacts
Post-rewetting, the NP reports the bog “again retains water, cools the landscape and stores carbon,” reversing the prior heat-island effect and peat oxidation after mining. (Qualitative, management source.)
Lessons Learned
Key lessons
Restoring the water regime is the decisive driver: re-saturating the mined bog enabled peat-forming vegetation to re-establish and habitats to recover. As the original NWRM note states, successful regeneration hinged on water regime, and vegetation patterns in flooded areas depend on water-table height, remaining peat depth, and successional age.
At this site, full ditch blocking + infilling and surface mulching proved complementary: blocking raised/leveled the water table, while mulch reduced evaporation and protected diaspores, accelerating Sphagnum and sedge establishment.
Long-term effects matter. The water table has risen progressively over ~20 years, a visible indicator of hydrologic recovery (necessitating a full boardwalk rebuild in 2022 and a tower closure in 2025). Monitoring and adaptive visitor-management are therefore integral to sustaining outcomes.
Biodiversity responds when hydrology is fixed: post-restoration surveys recorded 371 Lepidoptera species, including bog specialists recolonising from nearby intact mires—evidence that specialist taxa can return if wet conditions persist.
Barriers
Barrier typeBarrier roleComments
OtherMain barrierAll restoration measures were limited in time
Market failuresSecondary barrierLogistics of mulch sourcing; initially only small-scale supply.
Expected maintenance needsMain barrierInfrastructure vulnerability in re-wetted terrain (rot, rebuilds).
OtherSecondary barrierLegacy of industrial mining: bare, drought-prone peat surfaces.
Drivers
Driver typeDriver roleComments
Organisation committed to itMain driverAuthority of the Natural Park
Availability of subsidiesSecondary driver—
Legal obligationsSecondary driverStrategy programes
Success factors
Success factor typeSuccess factor roleComments
Financing possibilitiesMain factorNational funding and support from Šumava NP &amp; local authorities
Conducted assessments (incl. economic)Secondary factorLong-term monitoring enabling adaptive management
Public participationMain factorVisitor infrastructure to protect recovering surfaces
Transferability
Highly transferable to post-mining bogs: block and infill drains, then mulch to kick-start peat vegetation. Calibrate a site-specific target water level, ensure biomass supply for mulch, and design/maintain visitor access for wetter ground. Continuous monitoring is essential to adapt works.
Sources