OPTAIN : Tetves [Hungary]

Résumé

Summary

The study site is the sub catchment of Tetves, is considered a priority area in terms of water protection. The size of the study site is 68 km2. 49% of the total catchment area is forest, 39% is arable land, 1% orchards, 1% vineyard, 1% is grassland and 2% is urban.

The study site is sensitive to nutrient and nitrate loss. Extreme weather events, the presence of loose parent material and a lack of best management practices in some part of the study site increase soil degradation, especially gully erosion. The water and nutrient management of this small catchment affects water quantity and quality of Lake Balaton. Extreme weather events will increase the environmental and social conflicts in the region.

The most pressing issues recognized in the study site are: revise the aspects considered for the delineation of soil erosion prone areas, wider application of measures that efficiently decrease soil erosion and nutrient load, and implementation of integrated water resources conservation.

OPTAIN project aims to identify effective combination of the NSWRMs and optimize their allocation, in order to improve water and nutrient retention in the soil and the catchments. Emphasis will be put on suitable options to foster the resilience of agricultural production to climate change.

Photo gallery

Vue d'ensemble
Year of issue
2025
Project
OPTAIN
Implementation status
Modeled
Contact
Agártudonmányi Kutatóközpont (ATK)
Country
Hungary
NUTS2 Code
Dél-Dunántúl
Sponge measures implemented in the case study
Ponds and scrapes
Afforestation
Controlled traffic farming
Buffer strips and hedges
Forest riparian buffers
Minimum tillage
Peak flow control structures
Site Information
Precipitation
633.00 mm
Temperature (°C)
10.30 °C
Elevation range
106-295 m a.s.l.
Design and Implementation
Project scale
Micro
Project scale specifications
Catchment of Tetves Stream, which belong to the catchment of Lake Balaton.
Project area
The size of the modelled catchment is 72 km²
Financing
Total cost
216000.00 €
Policy and Governance
Policy description
Lake Balaton is a key resource in Hungary, providing not only freshwater but also a source of economic development associated with tourism and recreational activities. It is also of environmental importance for the region. Poor land management practices, particularly in agricultural lands, have resulted in soil erosion issues. Changing weather patterns are susceptible to produce more frequent flash floods, soil erosion and nutrient loads, negatively impacting the water quality of Lake Balaton.

In order to change land management practices on landscapes within the watershed the following stakeholders will be involved in the development and implementation of the project: General Directorate of Water Management, Local farmers, Balaton Limnological Institute, Lake Balaton Development Council, Hungarian Young Farmers Association (AGRYA), Hungarian Chamber of Agriculture (NAK), AGRO PROFI, and WWF Hungary.
Policy targets
Runoff control
Pollutants Removal
Erosion Control
Oher Societal Benefits
Part of a wider plan
Oui
Public consultation
Non
Has contractual arrangements
Non
Impacts and Monitoring

No information provided for this section.

Lessons Learned

No information provided for this section.

Sources

No information provided for this section.