Résumé
In the framework of the large-scale nature conservation project "Lenzener Elbtalaue", a dyke along the river Elbe (in Germany) has been relocated. This created a new retention area with a diverse floodplain, including alluvial forests, half-open pasture landscapes and other typical habitats of lowland floodplains. With 420 ha it is the biggest application of this type of measure in Germany so far. The project successfully combines flood protection and nature conservation objectives. Since the cutting of the old dyke in 2009, the measure could proof its effectiveness during several high water events.
The specific measures applied include:
- Construction of a new, 6.1 km long dyke which has been shifted backward up to 1.3 km
- Opening of the old, 7.2 km long dyke, situated close to the river, in sections of 200-500 m length
- Planting of 160 ha of alluvial forest, with further 130 ha of succession areas for alluvial forests
- Establishment of half-open pasture landscapes on 85 ha
- Profiling of 45 ha of flood channels in the area concerned by the relocated dyke
- Implementation of a land re-organization process in order to make areas available for the project
Photo gallery
Vue d'ensemble
Reduce flood peaks on the Elbe River
Improve ecological connectivity and water quality
Support EU WFD and Natura 2000 objectives
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| NGO | Trägerverbund Burg Lenzen e.V. | Implementation | Association responsible for running the large-scale nature conservation project. | Responsible |
| Other | Biosphere Reserve "River Landscape Elbe-Brandenburg" | Initiation of the measure | Management of the biosphere reserve. | Responsible |
| Regional / sub-national water authority | Brandenburg State Office of Environment, Health and Consumer Protection | Implementation | Regional authority with different responsibilities (nature conservation, water management, etc.). Supported the project from the early beginnings. The state office carried out the construction of the new dyke | Responsible |
| Farmers | Large-scale farmer | Initiation of the measure | Manager of a large-scale farm (about 3600 ha) situated in the area. Interested by promoting regional development activities. Early initiator of the reflections (together with the Biosphere Reserve). | Supporting |
| Research institute / University | Federal Waterways Engineering and Research Institute (BAW) | Monitoring | Research institute accompanying the project. Scientific support since 1995, in particular with regards to effects on navigation (e.g. share of discharge between Elbe and the dyke relocation area, impacts on sediment transport) and measuring the hydraulic effectiveness of the dyke relocation during flood events. | Supporting |
Site Information
Design and Implementation
Increasing public acceptance by providing a lot of information about the project.
- The dyke relocation became the central measure of the project, as it was only by this measure that the desired restoration of the floodplain to its original state and function could be achieved.
- Intensive research has taken place beforehand on the morphology and dynamics of the river Elbe (research project from 1996 to 2000). - Several alternatives had been examined, models have been elaborated.
- Alluvial forests had disappeared largely beyond the project area, and contributing to their recovery formed part of the project's objectives from the beginning.
- One alternative which would have led to a bigger retention area has not been retained, as depriving more areas from use wouldn’t have found public acceptance. Furthermore, problems with upward seed had been expected for this alternative.
Financing
Policy and Governance
With the Elbe being also an important water way, acceptable measures required an intensive cooperation between different institutions: integration of ecological, flood protection and navigation objectives.
- Establishment of alluvial forests on former grassland through scattered, small-area initial plantings as well as development and maintenance of a floodplain typical mosaic of habitats with the associated species (e.g. hard- and softwood forests)
- Preservation of the groundwater dynamic which is characteristic for a floodplain and the corresponding soil types
- Development of half-open pasture and meadow landscapes
(periodically inundated grassland))
- Removal of a hydraulic bottleneck and the associated narrowing of the flood water flow bed
Disconnected floodplain.
Agricultural use.
Loss of biodiversity and ecosystem functions
Long-term maintenance agreements
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
| National | Environment & Biodiversity | Blaues Band Deutschland | Nature-based river restoration |
| Activity stage | Activity type | Comments |
|---|---|---|
| Implementation phase | Guided tours | Guided tours take place in the project area. |
| Implementation phase | Visitor centre | A visitor centre informs about the project. |
| Arrangement type | Name | Comments |
|---|---|---|
| Contractual agreement | Land use & maintenance agreement | Agreement with farmers |
Impacts and Monitoring
Monitoring System
- Hydrology: 12 groundwater gauges are supervised by the association carrying the project
- Hydraulics: Construction of 4 dyke gauges through the large-scale nature conservation project, steady reading of the meter by the state office, analysis through the Federal Waterways Engineering and Research Institute
- Soils: Two permanent observation plots of the Land Brandenburg, complemented by an evaluation at the end of the project
- Forestry: Examination of the planted alluvial forests in 2009 (evaluation)
- Fishes: Examination of the flood channels in 2009 and 2010, in time intervals further observations in cooperation with research institutes
- Birds: Examination in the framework of the evaluation of the project continuously 2007-2010, continued by the state of Brandenburg
- Vegetation: surveys through cooperation between the project management association, the state of Brandenburg and different research institutes
Maintenance
Impact Assessment Methodology
The impact of the measures with regards to flood protection could be directly observed during the extreme flood event in January 2011.
Socio-economic Impacts
- Benefits for the regional development: The project area got quickly established as a regional attraction on the international Elbe bike trail. In connection with a centre for environmental education and a visitor centre for the area a sustainable increase of the number of visitors occurred.
- During the construction period there had been some socio-economic effects in terms of employment and local consumption.
Furthermore, during the construction period, there had been some socio-economic effects in terms of employment and local consumption.
Biophysical impacts: Hydrology
a) Flood events recurring every 1-2 years = 1500 m3/s → 8.6 % of the flow in the new floodplain, water level reduction of 9.2 cm
b) Flood events recurring every 3-5 years = 2300 m3/s → 27.5 % of the flow in the new floodplain, water level reduction of 28 cm
c) Flood events recurring every 20-25 years = 3250 m3/s → 36 % of the flow in the new floodplain, water level reduction of 38.9 cm
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
It is said that public communication activities should have been made in a more intensive way, in particular at the beginning of the project.
From an ecological perspective, an earlier / deeper connection to the Elbe would have been better to improve the lateral connectivity and morphological dynamic of the river. The latter would have also helped to minimize sedimentation processes in the new floodplain area, which can be expected in the middle and long term.
The highest effect of the measure can be stated next to the first opening of the dyke (on the "evil place") and it decreases towards the downstream part of the dyke relocation. Further downstream from the dyke relocation, the measure does not have any effect anymore on the water level. Upstream, the positive effect diminishes with an increasing distance. This shows that the measure has a very clear, but mainly regionally working impact. In order to solve the important flood problems of the Elbe river, it is indispensible to carry out other dyke relocation measures.
The measures are suitable to be applied also elsewhere. However, areas free of settlement are needed.
The continuous persuasion works from a few - and over several years - is highlighted as one key factor for the successful implementation of the project. The prior implementation of research projects ensured the effectiveness of the measure design, but was also very useful for providing support for public discussion.
| Driver type | Driver role | Comments |
|---|---|---|
| Organisation committed to it | Main driver | It was only due to the continued commitment of local stakeholders that the project could be implemented. |
| Past flooding events | Main driver | Reducing the local flood risk was a main driver for the implementation of the measures. The 2002 event reveales need for better retention. |
| Legal obligations | Main driver | There had been legal obligations to adjust the old dyke to current requirements - which temporarily coincided with the development of the project idea. |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Attitude of relevant stakeholders | Main factor | Early involvement of farmers was crucial and positive. |
| Financing possibilities | Secondary factor | Access to various funding sources secured the feasability of the project. |