The Salt of Life project (LIFE11 NAT/BG/000362) restored the lagoon’s water-management infrastructure at Atanasovsko Lake by repairing dykes and barriers, dredging 23 km of the perimeter channel and rehabilitating 20.5 km of embankments to secure long-term habitat conditions for roosting and breeding birds. Building on this, Lagoon of LIFE (LIFE17 NAT/BG/000558, 2018–2024) scaled up restoration: three major earth dikes (~5.8 km) were rebuilt, 17.6 km of mini-dikes restored and 14.3 km of internal saline channels cleaned; the North sea sluice was repaired in 2021. These actions increased water exchange more than fourfold, stabilised water levels and salinity, improved oxygen, and reduced chlorophyll-a - directly improving ~220 ha with positive effects across >700 ha. A pilot, low-impact method using a mini-excavator to build/maintain mini-dikes reduced cost, time and disturbance and has been widely applied. Macrophyte recovery advanced with Ruppia maritima transplanted (TERFS/Chimove), establishing three self-reproducing colonies. In 2024, Greater Flamingo bred here for the first time in Bulgaria. An After-LIFE plan and an active Public Advisory Council support ongoing maintenance with Black Sea Salinas, strengthening resilience to extreme rainfall and safeguarding salt-extraction infrastructure and lagoon habitats.
Photo gallery
Vue d'ensemble
Reduce impacts of threats (floods, degraded sea connection, polluted surface inflows) on lagoon habitats and target bird species (6 spp.: Collared Pratincole, Kentish Plover, Avocet, Black-winged Stilt, Little Tern, Sandwich Tern) via sustainable habitat management and breeding-site improvements.
Monitor and evaluate effects of restoration measures and feed results into management.
Improve visitor experience and disseminate results; raise public understanding/support for coastal lagoons’ ecological, economic and social values.
Aim to restore and protect 1,458.82 ha of coastal lagoon habitat 1150* (project coverage).
Recover 20 ha of currently drained 1150* and restore physico-chemical characteristics over >720 ha via active water-level/salinity management, channel clearing and a new sluice gate.
| Authority type | Authority name | Authority role | Authority responsibility |
|---|---|---|---|
| NGO | Bulgarian Biodiversity Foundation | Initiation of the measure | Responsible |
| NGO | Bulgarian Society for the Protection of Birds | Implementation | Supporting |
| Private property owners | Chernomorski solnici JSC | Implementation | Supporting |
Site Information
Design and Implementation
Financing
€2,449,793 : LIFE17 NAT/BG/000558 “Lagoon of LIFE” (2018–2024)
Policy and Governance
| Name |
|---|
| Management plan of Atanasovsko lake Maintained reserve |
| Activity type | Key issues | Comments |
|---|---|---|
| Public consultation of Atanasovsko lake Management Plan | — | — |
| Festival | Organise Salt of Life Festival to communicate project objectives and results to the broader public | — |
| — | — | 90+ public events, >1 million media reach; film “Salty People” won international awards, raising Burgas’ profile as the “Pink Salt Lake.” |
| Arrangement type | Name |
|---|---|
| Organisational arrangement | Partnership agreement for the implementation of LIFE11 NAT/BG/000362 Project |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Reduced costs & disturbance. The mechanised mini-dike method cut manual work, materials and restoration time, while limiting disturbance during breeding (project manager statement, 2025).
Market diversification: the project created/promoted 10 new products and 3 value-added services, incl. Pelican soap, Flamingo candle, Laika.bg vegan chocolates (5 types), Gaillot sea-salt chocolate (7% profit donated), “Nature in a box – Atanasovsko Lake,” and “green salt” (Salicornia).
Visitor services: Black Sea Salinas offers lye and mud pool experiences on the south lake (non-medical), strengthening local tourism linked to the salt pans.
Recent negative impacts :
Storm damage (Nov 2023): the lakeside simBiotic visitor space was heavily damaged/closed, prompting plans for a new information centre.
Lower salt tonnage in recent years, but greater product/service diversification around lake resources.
Biophysical impacts: Hydrology
3 major earth dikes rebuilt (5,800 m), 17,640 m of mini-dikes restored, 14,330 m of internal saline channels cleaned; hydrotechnical facilities (sluices, spillways, locks) repaired. In 2021 the main sea lock (North) was repaired, improving control of water regime and stabilising water levels and salinity. Direct improvement on ~220 ha, with effects across >700 ha.
Water exchange between basins increased >4×, enabling control of circulation/levels; reduced sediment resuspension and lower turbidity noted post-sluice repair.
Reports of a rise in the groundwater table in restored areas, supporting favourable water regime in peripheral parts.
Creation of ~13 ha of small wetlands (bittern habitat) by dredging ~50,000–60,000 m³ of sediment and building three earthen embankments; minimum water depth 30 cm maintained; connected to Banska River to stabilise levels.
Under Salt of Life, 23 km of the perimeter/bypass channel were cleaned to prevent freshwater inflow that alters lagoon conditions and to route river inputs to the sea. 20.5 km of dykes/barriers repaired.
Biophysical impacts: Biodiversity
Habitats (area changes under Salt of Life): Habitat 1310 +10.9 ha; 1340* +240 ha; 1410 +~10 ha; 1530* +~197 ha (SCI totals).
Lagoon macrophytes: Ruppia maritima restored using TERFS/Chimove; 3 self-reproducing colonies, now >0.3 ha; in 2024 a new natural colony formed after constructing three earthen dikes.
Target birds (Salt of Life): Common Tern numbers ×10 vs. project start; Gull-billed Tern returned as breeder after 18 years; artificial islands (>500 m² repaired + a new 144 m² island) supported nesting/rest.
Flagship event: First successful breeding of Greater Flamingo in Bulgaria (2024)-3 chicks observed in June 2024.
Biophysical impacts: Water & Soil Quality
Eutrophication indicators: Higher dissolved oxygen and lower chlorophyll-a after channel cleaning and hydrotechnical fixes (evidence of reduced eutrophication).
Turbidity: Reduced turbidity associated with less sediment resuspension after the 2021 sea-lock repair.
Biophysical impacts: Others
Lessons Learned
Hydrological control is the cornerstone. Rebuilding three major earth dikes, restoring mini-dikes, cleaning internal channels and repairing the main sea sluice in 2021 multiplied water exchange more than fourfold, stabilised levels/salinity and improved oxygen while lowering chlorophyll-a.
Managing freshwater inputs is as important as internal works. Cleaning 23 km of the bypass/perimeter channel to divert river inflows protected lagoon salinity and reduced nutrient-loaded water reaching the basins.
Design monitoring before and during works to steer adaptive management. The team created the lake’s first comprehensive monitoring scheme (with innovations like drones and photo-traps), using results to target measures and assess habitat/species responses.
Simple, scalable techniques can cut costs and disturbance. Restoring mini-dikes with a compact mini-excavator shortened work time, eased future maintenance and reduced human presence during breeding—proof that small technical choices shape ecological outcomes.
Governance and coordination are non-negotiable. Implementation required precise coordination among authorities, ecologists, technologists and contractors; going forward the project calls for a clear allocation of responsibilities and an integrated management plan for the Natura 2000 site.
Plan for extremes and climate-proof visitor infrastructure. Severe flooding in late 2023 destroyed the “symBiotic” space, underlining the need to design access/education facilities and O&M regimes for intensifying events.
Biodiversity can respond quickly when hydrology and habitat structure are right. Ruppia maritima re-established (with TERFS/Chimove and natural spread after earthen dikes), and Greater Flamingo bred successfully in 2024 ; gains that still depend on careful water-level control.
| Driver type | Driver role | Comments |
|---|---|---|
| Organisation committed to it | Main driver | Consortium of environmental organizations, Municipality and Salinas operator |
| Legal obligations | Secondary driver | — |
| Success factor type | Success factor role |
|---|---|
| Attitude of decision makers | Main factor |
| Financing possibilities | Main factor |
| Attitude of relevant stakeholders | Secondary factor |