Managed Aquifer Recharge (MAR) in Los Arenales, Spain, aims to address severe groundwater overexploitation through the seasonal diversion of surplus flows from the Cega and Voltoya rivers into infiltration basins and channels. Since the early 2000s, three MAR systems (El Carracillo, Santiuste, Pedrajas–Alcazarén) have helped reverse declining groundwater trends - replacing average losses of −1.4 m/year with rises of +0.3 m/year - while also improving water quality through soil filtration, notably reducing nitrates.
The systems are low-energy and gravity-fed, co-managed by the Duero River Basin Authority (CHD) and local irrigation communities. Monitoring shows benefits for aquifer recovery, flood buffering, wetland restoration (e.g. La Iglesia Lake), and energy savings (~22% reduction in pumping), with positive socio-economic outcomes including improved irrigation security and reduced rural depopulation.
Recent adjustments have been made to optimise recharge periods and flow thresholds from the Cega River, ensuring ecological flows are maintained. During droughts, stored water from wet years allows irrigation to continue, even if aquifer levels temporarily decline. These are recovered in subsequent wetter periods. The recharge system is well accepted by users, and flood events are managed by redirecting excess water back to the Pirón River, minimising basin transfer effects.
Photo gallery
Vue d'ensemble
Secure water supply for irrigated agriculture in the region
Recharge the aquifer using surface water surpluses
Improve water quality through natural soil filtration
Test and validate MAR as a long-term water management tool
Promote participatory water governance
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| — | Ministry of Agriculture, Food and Enviromental Affairs, Spain | Initiation of the measure | The ministry responsible for environmental affairs. | Responsible |
| Regional / sub-national water authority | Castilla y León Regional Government (Agriculture and Livestock Office) | Initiation of the measure | Is the regional authority for agricultural affairs. | Responsible |
| Other | Tragsa | Determination of design details of the measure | Type: Public Company Role: Tragsa has been involved since the begining is most of the stages: Initiation of the measure; Determination of design details of the measure, Implementation, Financing (from 2007 to 2010) and Monitoring. | Responsible |
| Local water authority | Duero River Basin Authority | Other | Supporting tragsa withdata collection and providing information. | Supporting |
| Research institute / University | Universidad Complutense de Madrid | Monitoring | Type: education and research institution Role: monitoring and field research | Supporting |
| Farmers | Irrigators Community | Monitoring | Framers were actually involved in all the process. They were responsible for opening and closing the recharge devices following Tragsa instructions. | Supporting |
Site Information
Design and Implementation
Peak flow (for a return period of 500 years) = 560 m3/s
Some years have not been successful due to silting up in soakways and pond.
The water transfer from Voltoya River to the recharge channel needed to be stopped during heavy rain days in order to avoid flooding.
Additionally, the Lisse effect (excess of air trapped in to the aquifer reduces the infiltration capacity) has been a problem during the implementation, having to modify the design and structure of the devices.
Erotion of soakways/channels banksides, jeopardising stability.
The transfer of water to the recharge system was only allowed is the flow in Voltoya river was be above 600 l/s (in order to guarantee the ecological flow.
Essays and monitoring in the site of study showed that in areas were the aquifer was more than 3m deep, infiltration was more effective.
Literature lists favourable conditions for aquifer recharge: scant vegetation, permeable or fractured soil, high water table level, and aboundant rainfal (De Vries and Simmers, 2002).
Financing
Water intake: 409657 €
Transfer conveyance: 2641615 €
Recharge channel 1: 289940 €
Recharge channel 2: 606867 €
Investment in the second period: 660867€ (The amount was devoted to maintenance, studies and projects)
Policy and Governance
| Arrangement type | Responsibility | Name | Role | Comments |
|---|---|---|---|---|
| Contractual agreement | Use the diverted surface water legally and transparently. Operate and maintain MAR infrastructure locally. | Public–User Agreements with Irrigation Communities | The Irrigation Community (IC) of El Carracillo signed agreements with the Confederación Hidrográfica del Duero (CHD). | These agreements are formalised under Spanish water rights legislation, where ICs receive water concessions for shared use and commit to maintaining infrastructure and adhering to operating rules. |
| Contractual agreement | Land use rights were formalised via easement agreements or permits, enabling CHD and ICs to build and manage infrastructure. | Land Use and Access Agreements | Infiltration basins and canals were sometimes built on public land or land ceded temporarily or permanently by municipalities or landowners. | — |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Socio-economic Impacts
Lower energy demand for groundwater pumping.
Rural development & demographic stability : In areas benefiting from MAR (e.g. El Carracillo), population decline has slowed or stabilised, in contrast to surrounding rural zones. This is interpreted as a positive impact on local economies and livelihoods, helping to retain youth and agricultural employment.
Reduced illegal groundwater abstraction : With legal, MAR-supported water supply, unauthorised pumping has decreased, improving compliance with water laws.
Energy savings: ~10.4 GWh/year
CO₂ emissions avoided: ~9,300 tonnes over the lifetime of MAR operations to 2021
Biophysical impacts: Hydrology
Average value per recharge cycle on the basis of the the data obtained after 10 recharge cycles (and excluding cycle 6 value -see later-). These values show the variation in the groundwater level in the monitoring network. The value of the Cycle 6 cannot be only attribuible to the recharge as there was also abundant precipitation that year, and measurement could not differ between sources. Values obtained per cycle: 2,30 m (cycle 1); 2,10 m (cycle 2); 1,17 m (cycle 3); 3,36 m (cycle 4); 0,31m (cycle 5); 3,57*m (cycle 6); 0,62 m (cycle 7); 0,41 m (cycle 8); 0,54 m (cycle 9); 0,28 m (cycle 10).
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
- It is important to improve economic and geopolitical indicators, apart from the hydrogeological ones, prior to the implementation of new devices.
- Monitoring is key to improve effectiveness, to improve the devices and to increase infiltration rates and the total volume infiltrated to the aquifer.
- Some key actions to ensure the proper functioning of the measure are the pre-treatment of water, the inflow regulation, reduction of suspended soils and air in water. It is advisable to avoid whipping of recharge water. Low flow speed is preferred.
- Some of the most common limitations are soil silting and increase of trapped air in the aquifer, which can be avoided with SAT techniques and the proper design of the channel.
- MAR systems can significantly reverse aquifer depletion even under reduced rainfall.
- Soil infiltration improves water quality by reducing nitrates and suspended solids.
- Simple and low-cost gravity-fed systems are highly effective in rural settings.
- Energy use and CO₂ emissions from groundwater pumping can be reduced by over 20%.
- Multi-level governance and user ownership are essential for long-term success.
- MAR can contribute to rural demographic stability by securing agricultural water supply.
- MAR systems can also provide flood retention benefits when designed with multi-purpose capacity.
| Driver type | Driver role | Comments |
|---|---|---|
| Balancing different objectives | Main driver | A group of groundwater users posed their concern about the aquifer degradation to the local authorities, which enabled a serie of interventions. |
| Public pressure | Main driver | — |
| Organisation committed to it | Secondary driver | — |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Attitude of relevant stakeholders | Main factor | Once the infiltration system started working, it was necessary the participation of the irrigator community to manage the entrance of water from Voltoya River. This procedure proved to be the most efficient to avoid excess of water and flooding in nearby areas, or to surpass the limit established by the River Basin Authority of 8,5hm3 to be used for recharge purposes. Mayors of related towns were always collaborative. |
| Public participation | Secondary factor | — |
| Attitude of decision makers | Secondary factor | Once the overexploitation problem was identified, local and national authorities reacted with a project of aquifer recharge, declaring the implementation of measures of "general interest". Mayors of related towns were always collaborative. |
| Successful coordination between authorities | Secondary factor | — |
| Communication activities | Secondary factor | The project has became a practice of interest in Spain and is often visited by students, other researcher, and even a dissemination plan has been implemented for the general public. |
| Existing staff and consultant knowledge | Main factor | Some of the researchers involved in the project have been very committed to the continuation of monitoring and sampling to get additional data and results even when the budget was scant. |