This scheme is part of the long-term SigmaPlan in Flanders, designed to increase flood storage in the Scheldt catchment while restoring natural habitats. On the Grote Nete, the project reconnects the river with its floodplain, previously cut off by dykes. In the middle reach, controlled flood storage areas (GOGs) are being developed, while in the upper and lower reaches free connections are restored, creating opportunities for wetlands, grasslands, and riparian forests.
Since 2015, planning has advanced through a spatial implementation plan (GRUP) and a subdivision into three sub-areas: Zammelsbroek, Tussen Hellebrug en Herenbossen, and Ter Borght–De Merode. Works are ongoing in Zammelsbroek and Hellebrug–Herenbossen, with dike modifications, creation of winter beds, reconnection of tributaries, and restoration of wetlands. The Ter Borght–De Merode section is progressing administratively, with environmental procedures under way. By 2024–2025, public information points and guided visits confirmed the transition to implementation on site.
The project is managed by De Vlaamse Waterweg nv and the Agency for Nature and Forest (ANB), within the broader valley programme “Het Grote Net(e)werk” led by the Province of Antwerp. This coalition aligns flood protection, water quality, and ecological objectives across about 900 ha along 30 km of river. Funding is supported by the SigmaPlan and the Flemish Blue Deal (2025–2029). Implementation requires addressing sediment and water quality constraints but is expected to deliver multiple benefits: improved flood safety, reconnected habitats, and increased resilience of the Grote Nete valley.
Photo gallery
Vue d'ensemble
| Authority type | Authority name | Authority role | Comments |
|---|---|---|---|
| Other | Waterwegen en Zeekanaal NV | Implementation | As steward of the waterways WenZ has overall responsibility for the project, from initiation of the measures and development of the plan to the actual implentation. |
| Other | Agentschap voor Natuur en Bos | Other | Involved in the development of new nature areas and wetlands. |
| Other | Vlaamse Landmaatschappij (VLM) | Other | Consulted in relation to changes to agricultural activities. |
| Other | Departement Ruimtelijke Ordening, Woonbeleid en Onroerend Erfgoed (RWO) | Other | Supports the spatial implementation of the project. |
Site Information
Design and Implementation
The areas to be included were originally the floodplain of the Grote Nete, so are well suited to restoration to their original purpose
Flat Kempen sand valley with river-dune features favours space for water; widespread historic dykes/drainage and mixed ownership complicate works; contaminated sediments/radiological legacy require strict controls during earthworks.
Financing
SigmaPlan was ~€1.5 billion (2020 estimate).
- Extra time to transform the company by phasing the works
- Border corrections to assure the liveability of companies by for example excluding lots with construction - Appealing retirement scheme
- Financial support for changing land-use from arable to pasture
Policy and Governance
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
| Catchment-based | Water | SigmaPlan | The SigmaPlan is a catchmentbased program for the river Scheldt. It was initially intended to mitigate the problems for tidal related floodings, but has since evolved to also include overall water safety measures. |
| Activity stage | Activity type | Comments |
|---|---|---|
| Design phase | Meetings during planning phase | Meetings have been organized with all interested parties, including information provided through local city halls. |
| Implementation phase | Newsletters for residents | Regular newsletters have been made to inform interested parties of the progress of the project. |
| Implementation phase | Comprehensive website | On the website detailed animated videos can be found about what is going to happen including reasons for actions taken. |
| Implementation phase | Individual consultation with landowners | Individual consultation is held with each landowner to develop the best solutions |
Impacts and Monitoring
Impact Assessment Methodology
Socio-economic Impacts
Biophysical impacts: Hydrology
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Allowing long timescales is important and allows for the optimal outcome to be achieved, by allowing landowners greater flexibility.
| Driver type | Driver role | Comments |
|---|---|---|
| Past flooding events | Main driver | Re-evaluation of flood risks (including expected climate change) |
| Other | Secondary driver | Reinstatement of the estuary of the Scheldt as a self-sustaining ecosystem |
| Success factor type | Success factor role | Comments |
|---|---|---|
| Successful coordination between authorities | Main factor | As this project is part of the Sigmaplan, overarching consulting pre-existed prior to the project within the sectoral consultation bodies (agriculture, nature, government, ...). This enabled to get all local stakeholders involved as well in an early phase to successfully coordinate any issues during the design phase. |
| Conducted assessments (incl. economic) | Main factor | Although time consuming, the preceding studywork (reports regarding effects on agriculture and nature development, details of ground- and surface waters, ...) lead to a complete development plan which enhanced coordination greatly. |
| Specific incentives for stakeholder involvement | Main factor | The Sigmaplan has a comprehensive approach to consulting with stakeholders and finding solutions to allow the measures to progress on their land |