Résumé
The Körös-ér catchment lies in a drought-prone part of Hungary and is a heavily modified water body with nutrient inputs from urban and agricultural sources. Recurrent water-logging causes temporary flooding in spring and after cloudbursts. To address both extremes (floods and shortages) the water directorate upgraded control structures, reconnected ~2.5 km of former floodplain at the estuary, improved sluices to allow retention while clearing bottlenecks for flood conveyance, increased urban drainage capacity (via a closed conduit), and added an upstream retention pond. Since completion (2011), management has shifted toward active small-water retention: today water is stored at three points along the Körös-ér - at the mouth (0+000), at 5+850 (betétpallós gate), and at 16+675, where DINPI built a retention structure in 2022 with a lateral sluice and ditch to inundate low-lying grasslands, boosting retained volumes and waterfowl habitat (boards are removed at high water; overtopping is possible). In 2025, under the “Vizet a tájba / Water to the Landscape” programme, managed in-channel storage and controlled inundation were also implemented near 22+884 (≈14 ha, ≈46,000 m³). Fish from the Tisza have re-appeared in reaches previously isolated.
Photo gallery
Vue d'ensemble
Upgrade sluices to enable retention and remove bottlenecks to improve flood conveyance (works applied along the ~40 km channel).
Provide urban drainage capacity: build a closed conduit (~1,200 m) through Nagykőrös and raise drainage coverage from 37.7% to 100%; create ~4 ha of green space at surface.
Create an upstream retention pond to control runoff and store water (design ~100,000 m³).
Protect groundwater in town by using a closed culvert instead of an open channel.
Modify the Tisza confluence structure to allow fish passage and enable operation of a seasonal (later permanent) reservoir at the mouth.
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| Regional / sub-national water authority | Állami Erdészeti Szolgálat Kecskeméti Igazgatóság, National Forestry Service – Kecskemét - Middle Tisza District Water Directorate | Determination of design details of the measure | Advise on planning | Supporting |
| Local water authority | Körösvidéki Vízügy Igazgatóság (Körös River Water Directorate) | Implementation | Co-planner | Responsible |
| Nature park | Duna-Ipoly National Park | Determination of design details of the measure | National Park | Responsible |
| Forest owners | ÁPV Rt (National Privatization and Asset management Ltd, state owned) | Other | Owner of the regional forestry management organization, Dalerd – financial sources for the development | Responsible |
| Forest owners | DALERD Rt (South-Alföld Forestry Ltd. | Implementation | Lead Planner, implementer of the development | Responsible |
Site Information
Design and Implementation
Use the existing infrastructure and former river beds, channels as much as possible in a landscape friendly manner.
Minimize future operation and maintenance costs.
Do not create conflicts with the other water uses of the area. The functioning of the system must be agreed with the other land users and owners of the area.
Financing
Policy and Governance
Meanwhile recurring water logging periods cause temporary problems for the settlement and the agricultural areas.
Self-regulation of water by filtration / storage / accumulation by ecosystems
| Directive | Relevant pressure |
|---|---|
| WFD identified pressure | 4.1.1 Physical alteration of channel/bed/riparia n area/shore of water body for flood protection |
| Directive | Relevant impact |
|---|---|
| WFD identified pressure | Damage to groundwater dependent terrestrial ecosystems for chemical / quantitative reasons |
| Requirement directive | Specification |
|---|---|
| WFD-mitigation of significant pressure | Adverse effects of hydromorphological changes on groundwater and riparian ecosystems |
| Name |
|---|
| Implementation of the WFD |
Impacts and Monitoring
Monitoring System
Maintenance
Impact Assessment Methodology
Groundwater - water level in wells situated in the forest.
Biomass – not yet assessed, it will take place next year in the context of the decadal forestry plan supervision
Socio-economic Impacts
Potential increase of timber mass growth rate compared to other forest sites will be investigated next year (20 years, two forest planning cycles from the implementation).
Cost reduction due to natural regeneration of some tree species (for example fraxinus ornus).
Farmer & private land participation: under Vizet a tájba, landowners around Nagykőrös, Abony, Törtel, Tószeg, Mikebuda offered parcels for temporary inundation; the scheme targets drought relief, soil-water supply and local micro-climate cooling.
Biophysical impacts: Hydrology
The reason of applying a closed culvert (among other aspects) across the settlement was the protection of groundwater, because an open watercourse would drain the groundwater at low water periods.
Biophysical impacts: Biodiversity
The 2022 DINPI structure at 16+675 expands shallow wet grassland habitat and supports waterfowl nesting/feeding.
Biophysical impacts: Water & Soil Quality
Lessons Learned
EU funds can help overcome the technical shortages, but it can†™t make the interest resolution on a landscape scale avoidable between the different public and private interests. The works are ready to supply the potentially changing demand for more retention.
Surface water supply is an effective way of recharging groundwater storage capacity of forest soil in order to reduce droughts risk by enhancing the natural interseasonal allocation of water.
The key difference of this application compared to an area with generally the same problems is the possibility to sort out the transaction costs that emerge in an area with multi-party ownership.
If the suitable complex knowledge happens to be at the right place, no further incentive is needed to take advantage of an upcoming possibility. – It highlights the fundamental need for education about the complex nature of the water-land useecosystem nexus.
| Driver type | Driver role | Comments |
|---|---|---|
| Organisation committed to it | Main driver | The forestry management’s unequivocal understanding of the structural problem that threatens the sustainable operation: the lack of inundations. They grasped the first occasion to finance and negotiate such a development. |
| Success factor type | Success factor role |
|---|---|
| Financing possibilities | Main factor |
| Legal obligations | Main factor |
On the other hand the forest can play an equalizer role. The area could absorb more water, if technical flood risk concerns were solved. It means the area can adapt to different regimes to receive water. On the other side, because of the forest’s ability to store water it can adapt by decreasing intake in case of growing competing water demands during water shortage periods in the summer.
The application could be used all around the country.
The necessary precondition is the complex problem identification and task definition at the responsible/acting institutions.
The missing key element of transferability is the conflict resolution in order to create the necessary conditions of land conversion.