Slowing the Flow at Pickering, UK

Year of issue
2025
Summary

The Slowing the Flow at Pickering project (2009–2015) set out to reduce flood peaks in Pickering, North Yorkshire, by harnessing natural processes across the Pickering Beck catchment. Key measures - four low-level earth bunds, over 160 leaky woody dams, moorland and forest drain‐blocking, riparian and farm woodland planting, sediment traps and no‐burn buffer zones - were installed to slow runoff, boost infiltration and store water temporarily.

Launched after costly floods in 1999-2007, the scheme offered a cheaper, landscape-scale alternative to hard defences. In 2015’s Boxing Day storm, none of the dozens of at-risk properties flooded, demonstrating the network’s effectiveness under extreme rainfall.

After the official end of the project in 2015, the site remained monitored. More recently, beavers have been introduced into a fenced adjacent catchment to work alongside leaky dams-early observations suggest they enhance dam stability and create richer wetland habitats. All measures remain in place, with ongoing monitoring and targeted maintenance ensuring sustained performance.

The site still has not been affected by a storm event of sufficient intensity to demonstrate the expected effectiveness of the measures to their full extent.

Photo Gallery
Location
54.25, -0.77
Project
NWRM
National ID
UK_03
Sector
Hydromorphology
Installation Date
2011, 2015
Implementation status
Ongoing
Contact
Alistair McVittie, SRUC

Overview

Location of the project
Pickering, North Yorkshire.
Country
United Kingdom
NUTS2 Code
North Yorkshire
Sponge measures implemented in the case study
Ponds and scrapes
Peak flow control structures
Forest riparian buffers
Coarse woody debris
Controlled reintroduction and conservation of beavers
Objectives
Reduce flood risk and protect the populations from floods.
Demonstrate the effectiveness of natural flood management methods compared to traditional grey infrastructures.
Involved partners
Authority type Authority name Authority role Comments Authority responsibility
Other Forestry Commission Financing Forest policy and land management/ownership. Financing of project €127,675 Responsible
National water authority Environment Agency Determination of design details of the measure Expertise on design of measures. National agency responsible for flood management and WFD implementation. Financing of project €93,103 Supporting
Regional / sub-national water authority Regional Flood Defence Committee Financing Provides funding from local levy €179,310 Supporting
Local water authority North York Moors National Park Authority Financing Land management/ownership, planning authority within National Park. Financing of project €58,046 Responsible
— Ryedale District Council Financing Local planning authority and project financing €1,094,368 Responsible
Other Natural England Financing National agency responsible for natural heritage and agri-environment measures cover woodland creation. Financing of project €25,287 Supporting
Other Forest Research Initiation of the measure Project lead Responsible
Documents
Document

Site Information

Climate Zone
Cool temperate moist
Temperature (°C)
9.60 °C
Runoff coefficient
0.30
Elevation range
60-200 m
Slope range
10 - 15%
Soil type
Gleysols
Vegetation class
Forest vegetation : High trees (pines, spruces)
WFD Ecological status
Moderate
WFD Chemical status
Good
Water quality status
From the 2nd River Basin Management Plans data (2016)

Design and Implementation

Project scale
Large
Project scale specifications
Project applied across a 68.6km2 catchment.
Project area
6860
Basis of design
Protect 50 properties against a 1 in 25 year flood event.
Principles
The main principle of the project is to achieve flood risk management using natural processes. This involves developing an understanding of how land use and management across the entire catchment contribute to flood risk. The project is also concerned with wider environmental, economic and social benefits. These include improved water quality, provision of new and/or improvement of existing habitats, enhanced carbon sequestration, enhanced local skill base in estate management, improved recreation/tourism access and increased public understanding and engagement in land management for flood risk reduction.
Constraints
The river channel is incised/deep which has led to disconnection from its floodplain. The low level bunds therefore require an artificial structure (pipe bridge) to ensure their effectiveness.
The presence of the historical steam train line in Pickering partially built on a fragile enbankement means more risks to take into account when designing projects having an hydrological impact.
Favourable preconditions
The key factor that influenced the choice of site was the nature of land ownership with around half the area owned by either the public sector (Forestry Commission and the North York Moors National Park Authority) or the Duchy of Lancaster Estates.
Mapping data and catchment models from previous research had been used to identify sites for low level bunds. This research also involved stakeholder engagement which may have been important in overcoming barriers.
Opportunity mapping for woodland creation for flood risk reduction had also been undertaken.

Financing

Total cost
1580000.00 €
Costs investment
1580000.00 €
Costs investment information
€1.32m : low level bunds
€17,951 : riparian woodland (€2070/ha for native broadleaved, plus €2300/ha for flood risk management)
€27,782 : large woody debris dams (labour costs)
Costs maintenance information
Large woody debris dams are expected to need ongoing maintenance, the costs are not specified
Information on Economic costs other annual
The ecosystem services assessment estimated increaed forestry costs of €620,000 over 100 years
Administrative annual cost information
Costs of existing monitoring and data management are met from the budgets of relevant agencies.
Information on Economic costs - income loss
An ecosystem services assessment estimated impacts of 85ha of woodland creation and 150 large woody debris dams but not the storage bunds. This is a higher area of woodland than actually planted. The estimated loss of agricultural production was €36326 per year or €1047000 over 100 years.
Financing authorities
Authority name Type of funding Comments Financing share
Forestry Commission National funds Note that a large part of the local funding will have come from national funding allocations (e.g. block grants) to local authorities €127,675
Environment Agency National funds — €93,103
Natural England National funds — €25,287
Regional Flood Defence Committee Sub-national funds — €179,310
North York Moors NPA Local funds — €58,046
Ryedale District Council Local funds — €1,094,368
Compensations
Non
Compensations annual information
No specific compensation is discussed in the project documentation, but it is noted that given potential losses of agricultural output, compensatory payments may be necessary to ensure sufficient uptake of some measures.

Policy and Governance

Policy description
The town of Pickering in North Yorkshire has a history of flood events, most recently in 1999, 2000, 2002 and 2007; the last of these causing an estimated £7m (€8.05m) of damage. The Slowing the Flow at Pickering project was one of three pilot projects funded by under Defra's multi-objective flood management demonstration programme. A flood alleviation capital scheme was also proposed but deemed unaffordable under current national cost-benefit thresholds.
Land ownership
Most is public ownership or management (Forestry agency, national park authority, ministry of defense, English crown)
Policy targets
Increase Water Storage
Peak-flow reduction
Policy pressure
Directive Relevant pressure
Floods Directive identified pressure Natural Exceedence
Pressure remarks
This project pre-dated transposition of the Flood Directive into UK law.
Policy impact
Directive Relevant impact
Floods Directive identified pressure Property
Requirement directive
Requirement directive
Floods Directive-mitigating Flood Risk
Policy challenges requirements
The Pitt Review of the 2007 floods in England and Wales called for Defra, the Environment Agency and Natural England to work with partners to deliver flood risk management involving greater working with natural processes.
Part of a wider plan
Non
Public consultation
Non
Consultation activities
Activity stage Activity type Comments
Design phase Public meeting Flooding: can local knowledge make a difference? Exhibition held at Pickering Memorial Hall by the Ryedale Flood Research Group. Around 200 people attended the exhibition and were able to read about the group's work, watch video clips, talk to group members and try their hand at modelling
Design phase Public meeting Community engagement event. This public event in the Memorial Hall Pickering, was held to enable the project team to engage the community and stakeholders and involve them with identifying and implementing solutions on the ground.
Implementation phase Media releases Variey of media (web, press, radio) coverage at local/regional and national levels
Has contractual arrangements
Non

Impacts and Monitoring

Monitoring System

Monitoring requirements
The catchments are subject to existing and routine hydrological monitoring and assessment for WFD compliance. Additional monitoring may occur during potential flood events.
Upstream station
Recording of water levels at different points (upstream and downstream from some measures)

Maintenance

Maintenance requirements
Depends on the measures, and the available funds.

Impact Assessment Methodology

Performance impact assessment method
Unknown
Performance impact estimation information
Impacts have currently only been assessed using hydrological models comparing pre and post implementation scenarios.
Cost assessment method
The costs of measures have been based on estimated capital costs, woodland grant payments and labour costs. Maintenance and replacement costs are not taken into account, yet they could weigh significantly on long term costs.
Benefits estimates for flood regulation are based on the actual costs (2007) or estimated per property flooded costs (2000) of previous flood events adjusted by flood return periods and extent of alleviation offered by measures.
Other ecosystem service benefits are estimated using a variety of approaches.
The overall assessment is based on a cost-benefit test of net present values of benefits over 100 years.

Socio-economic Impacts

Benefits and co-benefits
The severe flooding of 2007 caused an estimated €8.05m of damage to property in the town of Pickering.
All values converted using €1 = £0.87 (average 2011 value).
Ancillary benefits
270450
Ancillary benefits information
An ecosystem services assessment estimated impacts of 85ha of woodland creation (F1: riparian, floodplain and farm woodland) and 150 large woody debris dams (F10) but not the storage bunds (N1). This is a higher area of woodland than actually planted.
Mean annual (€/yr)
Habitat creation: 139,683
Flood regulation: 6,855
Climate regulation: 123,029
Erosion regulation: 236
Education and knowledge: 16
Community development: 631

Biophysical impacts: Hydrology

Hydrological effects
It reduced peak flows, delayed runoff, increased temporary water storage, and slightly improved infiltration and baseflows, helping smooth the hydrological response during storms without major changes to the overall water balance.
Information on increased water storage
Source reference gives estimated total storage without time values, these range from 90000 to 138000 m3
Information on runoff reduction
Sites were identified using modelling for two low level bunds between 1.5 and 2.5m in height, this would provide 85,000m3 of flood storage sufficient for the flood events of 1999, 2000 and 2002. Larger events such as 2007 would require 650,000m3of additional storage. The river channel was too incised/deep for the bunds to be effective so these were designed to operate in conjunction with a pipe bridge to constrict flow and reconnect the river with its floodplain.

Based on estimated peak flow reductions, the joint impact of 50 ha of riparian woodland planting and 100 large wood debris dams is estimated at between 15,000 and 53,000m3 for the 2000 and 2007 flood events respectively. However new planting of woodland was only considered to be acceptable at only 4 sites covering 4.1ha. From the source it is not possible to disaggregate the impacts of measures F1 and F10 so care is advised in using these values.
Information on peak flow reduction
Mean estimated combined impact of riparian woodland and woody debris dams, range of 6.7% to 14.7% depends on size of flood event.
The combined peak flow reductions of for a modelled 50ha of riparian woodland and 100 large wood debris dams was estimated at 0.8 and 2.2 cumecs for the 2000 and 2007 flood events respectively. However new planting of woodland was only considered to be acceptable at only 4 sites covering 4.1ha.
Information on increased infiltration
Possible increase in infiltration due to flow reduction effects
Information on soil moisture
Possible increase in soil moisture due to increased retention
Ecosystem flood control return periods
1 in 25
Information on ecosystem flood control return periods
Floodplain storage has sufficient capactiy for a 1 in 25 year flood event.
Information on reducing flood risks quantity
The degree of peak flow rate reduction associated with the low level bunds is dependent on the design of the associated pipe bridge and whether this can restrict a flow of 12 or 15 cumecs. Flows of 12 cumecs are associated with 6 properties being flooded; flows of 15 cumecs would lead to flooding affecting 50 properties.
Reducing flood risks quantity change
The measures have successfully reduced flood peaks in Pickering during moderate to high but non-extreme events. The 2015 Boxing Day flood brought extreme rainfall, and many rivers in the region flooded severely, but in Pickering no properties flooded. The storage bund at Newbridge reached about 85% of its capacity during the event.
Information on peak delay effects
Floodplane woodland estimated to delay flood peak by 20 minutes, considered to be small to significant

Biophysical impacts: Biodiversity

Improved biodiversity
Oui
Information on improved biodiversity
The biodiversity benefits from the Pickering measures are modest but positive. No formal biodiversity index or class shift reported, but anecdotal evidence and local surveys note rises in pollinator species, wading birds, and aquatic invertebrates. Bats and otters also benefited from enhanced woodland cover and watercourse complexity.
The introduction of beavers in an adjacent catchment is being monitored for future biodiversity effects.

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Neutral impact-no change in WQ status
Information on water quality overall
Limited evidence, but likely minor improvements: reduced sediment transport from blocked drains and woodland planting, and better filtration from leaky dams. No major water quality monitoring was done, so impacts remain mostly assumed, not confirmed.
Soil quality overall improvements
N/A info
Ecosystem erosion control
Oui
Information on WFD ecological status obj quantity
The project is expected to improve WFD ecological status. The impacts are not specified but could include increased shading and reduced sediment loading due to riparian woodland, and improved habitats from LWD dams.

Biophysical impacts: Others

Ecosystem impact climate regulation
Increased permanent biomass
Information on ecosystem impact climate regulation
Increase in woody biomass and soil C storage

Lessons Learned

Key lessons
Two years was too short for the project. At least 3–5 years are needed for planning, consultation, modelling, and implementation.
Long-term monitoring is essential. Impacts take time to show, and baseline data often comes late. The measures still haven’t faced a 1-in-25-year flood.
A proactive, flexible approach from partners is key. Strong communication and willingness to adapt (e.g., to maintain structures) are essential.
Community engagement: Expectations must be managed realistically. Community involvement worked well, but clearer messaging on NFM limitations is needed.

Locals support whole-catchment natural flood management (NFM), but NFM should be seen as part of a wider flood management strategy, not a stand-alone solution.
Maintenance: Structures like bunds and leaky dams need upkeep. Some have decayed as expected; replacements and natural evolution (e.g. with beavers) help.
Support & policy: Volunteer-led projects need long-term funding and integration into national flood management policy to stay effective.
Barriers
Barrier type Barrier role Comments
Other Main barrier Construction delayed until January 2014 with completion due April 2015. Due to the reliance on another flood protection scheme for provision of the clay needed for construction
Legal obligations / restrictions Secondary barrier The size of the scheme (>25,000m3) meant that the measure was subject to the safety requirements of the Reservoirs Act 1975, specifically the risk to lives and property should the bunds fail.
Legal obligations / restrictions Main barrier Constrained due to existing conservation designations covering landscapes, habitats, species and archaeological heritage.
Lacking financing sources Main barrier Financial barriers due to the loss of agricultural production and a reduction in grants from €4598/ha to €2299/ha due to the closure of the Regional Development Agency.
Attitude of decision makers Secondary barrier Potential barrier for the further development of beaver reintroduction is the overall reluctance from the pubic and decision makers to let them develop freely (without an eclosure to contain them). It is seen as a potential source of land conflicts with agriclutral activity for example.
Drivers
Driver type Driver role Comments
Past flooding events Main driver A flood alleviation capital scheme was also proposed but deemed unaffordable under current national cost-benefit thresholds.
Other Main driver Willingness to create a demonstration site to expose and assess the effectiveness of natural flood management methods.
Success factors
Success factor type Success factor role Comments
Existing institutional framework Main factor Land ownership was relatively concentrated with around 50% of catchment in either public ownership (Forestry Commission and the North York Moors National Park Authority) or the Duchy of Lancaster Estates.
Available support tools Secondary factor The catchment had been subject to hydrological modelling as part of a previous academic study.
Attitude of the public Secondary factor Ongoing process of stakeholder and community engagement in both the aims and delivery of the project.
Other Main factor Land Control was probably the main success factor. There have been unsuccessful attempts to duplicate these measures on sites with multiple private owners, due to the lack of willingness of owners to participate.
Cost effectiveness
Most effective measure are timber bunds, as they are very cheap (using local wood). Beaver introduction have a lot of potential, being cheaper in work costs and similar hydrological effectiveness.
Flexibility / Adaptability
The catchment is subject to ongoing monitoring, including an Environment Agency gauge station in the lower catchment and Forest Research water level recorders in the upper catchment. These will help to monitor baseline conditions and assess the impact of installed measures, in particular riparian woodland and LWD dams.
This may encourage further uptake of measures including better management of existing riparian woodland (in-fill planting, encouraging regeneration).
Transferability
These measures are very transferable to other sites, but special care shall be observed while designing, to avoid land conflicts. Opportunity maps are a good tool for that.
Basin characteristics influence
Pickering Beck iss deeply incised and disconnected from its floodplain. Low bunds (N1) with a pipe bridge and LWD dams (N12) helped reconnect the river by enabling it to spill into adjacent areas.