Wetland restoration in Ciobarciu, Romania

Year of issue
2025
Summary

The short term project objectives were to create 250 ha of wetland by raising the water level of the embanked area with a regulating water outlet structure, creation of a variety of habitats -from dry land to spots with deep water- by digging and opening up of old river meanders that had been filled up.

The project is a good experience in the field of ecological restoration, involving purchase of land, participatory planning and co-operation with other organizations, including NGO’s.

The project also had long term objectives related to the creation of a network of wetlands, integration and nature and water policies, the implementation of European directives and the strengthening environmental NGOs and education. The project was implemented by a Romanian regional water authority with the support of Dutch partners.

The Ciobarciu project was evaluated at the end of the project by the project team and by a Romanian University, who interviewed 55 inhabitants of villages where the (previous) owners lived. After a period of five years, the project was evaluated again.

Photo Gallery
Location
47.0488889, 27.8597222
Project
NWRM
National ID
Romania_01
Sector
Hydromorphology
Installation Date
2006
Implementation status
Completed
Contact
Imola Koszta, REC

Overview

Location of the project
Valley of the Prut River; former floodplain of the Jijia River the most important tributary of the Prut River;4 flood protection polders of around 250 ha between the villages Costuleni and Prisecani.
Country
Romania
NUTS2 Code
Nord-Est
Sponge measures implemented in the case study
Re-meandering
Floodplain restoration and management
Wetland restoration and management
Objectives
Create ~250 ha of wetland in four polders by (i) raising water levels with a regulating outlet, (ii) re-opening infilled meanders, and (iii) excavating to create a habitat mosaic from dry ground to deep water. First flooding occurred October 2006.
Restore flow connectivity to the Old Jijia and reconnect floodplain habitats; works length noted as ~5,500 m in project summaries.
Design parameters included ponds with ~0.5–1 m water depth in two units and staged drawdown over summer; one unit can receive Prut water during floods.
Long-term aims: build a network of wetlands, integrate nature & water policies, support EU Birds/Habitats/WFD implementation, and strengthen NGO/education roles.
Involved partners
Authority type Authority name Authority role Comments Authority responsibility
Regional / sub-national water authority Apele Romane (Prut Directorate) Implementation — Responsible
Research institute / University Institute for Inland Water Management and Waste Water Treatment (RIZA) Monitoring national institue Supporting
Regional / sub-national water authority Regional Water Board Hunze and Aa†™s — — —
NGO Het Drentse Landschap (NGO for nature management) Other — Responsible
Documents
Document

Site Information

Climate Zone
Cool temperate dry
Precipitation
550.00 mm
Temperature (°C)
9.20 °C
Evapotranspiration
650.00 mm
Runoff
82.90 mm
Runoff coefficient
0.15
Elevation range
31
Slope range
0-1%
Vegetation class
Grassland (Stipa spp.)
WFD Ecological status
Moderate
WFD Chemical status
Good
Water quality status
Ramsar RIS lists pH 7.5–8.6 and dissolved oxygen 3.43–12.31 mg/L within the site.

Design and Implementation

Project scale
Micro
Project scale specifications
This is a site-specific restoration on the Old Jijia near Ciobarciu/Costuleni (Iași County), creating ~250 ha of wetlands by reopening infilled meanders and managing levels via a regulating outlet/hydraulic node—i.e., a localised hydromorphological intervention rather than basin-wide management.
Project area
250 ha
Principles
To develop ecological restoration measures which can lead to a win-win situation, profitable not only for nature, but also for the population in the area and what is socially acceptable.
Factor constraints
Technical conditions, from which the most important is the availability of water for the wetland.
Social conditions, including the acceptance of the project by the people and authorities in the area and the willingness of the about 425 landowners to sell their land.
Favourable preconditions
The site had high potentials for ecological restoration due to the possibilities to restore water flow in the Old Jijia, the absence of roads and
buildings and the decline of agriculture. Plus it had a low economic value.

Financing

Total cost
388000.00 €
Costs investment
388000.00 €
Costs investment information
1)restoration of Old Jijia (topographic study, cleaning of the river bed, reconstruction of the Chiperesti Bridge, cleaning the streamed of the river-15km, management plan of the Chiperesti inlet) ;
2) development Restoration Plan Ciobarciu wetland (evaluation of the land in the project area; inventory of landowners and agreement, acquisition of land, field works: channel 1, breach in the dikes between comparts 1 and II and II and III);
3) stakeholder involvement, communication and participation at village level as well as at county level and beyond
Costs land acquisition
180.00
Costs land acquisition unit
€/ha
Costs land acquisition information
Evaluation price of land done in October 2003; 150 EUR/ha (Prisaceni) and 170 EUR/ha (Costuleni); During the purchase 1 EUR = 3.3-3.5 lei RON)
Financing authorities
Authority name Type of funding Comments Financing share
PIN-MATRA Other Dutch governmental fund to protect and rehabilitate areas for nature in Eastern European countries of € 254.141 66%
Apele Romane Sub-national funds 22,900 € 6%
RIZA Other 87,100 € 22 %
Het Drentse Landscha Private funds 23,712 € 6 %
Compensations
Non

Policy and Governance

Policy description
Prior to the execution of the hydrotechnical works, the common floodplain of Jijia and Prut was flooded in the spring, being transformed into a lake, which was used by migrating birds for resting and feeding. In summer, the water level was lower, but there still remained many wet areas in the lower spots.
In order to prevent flooding and to extend agricultural surfaces, the common floodplain of Prut and Jijia was embanked. Jijia river course was deviated by digging a channel to the Prut at Chiperesti. The last 56 km of the Jijia River (Old Jijia), which is parallel to the Prut, has been cut-off and it can be supplied with water from the Jijia by the hydrotechnical knot at Chiperesti when needed. Otherwise, the old Jijia is only supplied from its own river basin by four small tributaries with intermittent flow. In the floodplain an irrigation and drainage system has been developed, which, however, was never finished completely. In the same area two fishing ponds were built which now have been abandoned for financial reasons (Osoi and Gorban fishing ponds). The land from the floodplain was intensively used as cropland. Starting with the political changes from 1989, the agricultural activity in this area has been reduced pastures took the place of the crops. The irrigation system was no longer in use and the drainage system worked only partially. Agriculture in this former wetland area now suffers from lack of water and locally the soil is getting brackish.
Land ownership
Land purchase from ~400 landowners. Of the intended 250 ha, 60% was purchased from local landowners and 15% was secured via long-lease, while 25% remained in private hands (upstream parcels).
Policy targets
Improved Biodiversity
Oher Societal Benefits
Groundwater Recharge
Runoff control
Policy pressure
Directive Relevant pressure
WFD identified pressure 4.1.2 Physical alteration of channel/bed/riparian area/shore of water body for agriculture
WFD identified pressure 4.2.2 Dams, barriers and locks for flood protection
Floods Directive identified pressure Natural Exceedence
Policy impact
Directive Relevant impact
WFD identified pressure Altered habitats due to morphological changes
WFD identified pressure Altered habitats due to hydrological changes
Floods Directive identified pressure Waterbody status
Requirement directive
Requirement directive Specification
WFD-achievement of good ecological status Mitigation of physical/hydrological alterations and flow diversions of the river
Floods Directive-mitigating Flood Risk Room for the Rivers
The Birds and Habitat Directives Habitats Directive and Bird’s Directive
Policy challenges requirements
RBMP of Danube River District RBMP of the Prut-Barlad
Part of a wider plan
Oui
Wider plan
Wider plan type Wider plan focus Name Comments
Catchment-based Water A œstring of pearls a concept for ecological restoration and Environment and Biodiversity
Public consultation
Oui
Consultation activities
Activity stage Activity type Key issues Comments
— Setting up of an Advisory Committe 7 members there was 1 meeting, following which Romanian project team fowund that working bilaterally with the committee members was more effective
Implementation phase Personal visits to the landowners information on the benefits of the restoration and agreement on land purchase 400+
Other Information to the local people (meetings with villagers, posters, articles, media campaign, colouring contest in the school) — Design of the area, implementation of the plan and management of the area
Has contractual arrangements
Oui
Contractual arrangements
Name
Memorandum of Understanding (MoU) between the governments of Romania and the Netherlands (renewed in 2000)
MOU ecological reconstruction signed: - County council - Environmental Prot. Insp. - Romanian Waters - Romanian Ornithological Soc. - Romanian Scouts
Agreement with almost all land owners for selling the land (12 oppose)

Impacts and Monitoring

Monitoring System

Monitoring requirements
Monitoring implemented at Ramsar scale covers water regime, water quality and birds, with avifauna surveys at Ciobarciu led by Al. I. Cuza University.
Monitoring parameters
Birds and fauna evolution: a program begun in spring 2007 (C. Gache, Al. I. Cuza University) documented >100 bird species in 2007–2008 and highlighted sensitivity to water-level oscillations.
“water regime monitoring” and “water quality” monitoring are implemented.

Maintenance

Maintenance requirements
Maintenance of the hydraulic facilities on annual basis and management of water flow is done by Apele Romane, having the ownership of the land.

Impact Assessment Methodology

Performance impact assessment method
Laboratory
Performance impact estimation information
Field observations during two summers, 2007-2008. Birds monitoring: transect method, observation from fixed point, male sounds counting and band counting (for waders and aquatic birds)

Socio-economic Impacts

Direct benefits information
Public access and recreational opportunities increased; the site offers educational and scientific uses and is recognised locally for these functions.
Increased possibility of non-comercial fishing Increased possibilities for horticulture along the Old Jijia Increased natural values (more birds and animals) Increased underground water.
Ancillary benefits information
Increased agriculture/horticulture along the Old Jijia
Increased tourism, leading to potential economical benefits originating from the interest of investors

Biophysical impacts: Hydrology

Information on retained water
Old Jijia can be fed from the Jijia via the Chiperești hydrotechnical node; the site comprises four ponds (two with 0.5–1 m depth) and a reach ~5.5 km long directly affected by works. First flooding: Oct 2006.

Biophysical impacts: Biodiversity

Improved biodiversity
Oui
Information on improved biodiversity
Contributed to the quality improvement of an important migratory route for waterbirds.
1 year after the flooding :
During field observations different aquatic and terrestrial invertebrates groups, amphibians, reptiles and some small mammals were observed.
Birds : 105 species recorded in 2007–2008, including 29 Annex I Birds Directive and 19 in the Romanian Red Book; site used heavily during migration, with initial breeding noted for several waterbirds/terns.
Fishes : 8 fish species observed about one year after flooding.

Negative episode (2008). The water-level drop from outlet failure disrupted the 2008 breeding season; caused the wetland to nearly dry, with severe impacts on birds.

Biophysical impacts: Others

Ecosystem impact climate regulation
No information available
Information on ecosystem impact climate regulation
no information available

Lessons Learned

Key lessons
Participatory planning and close co-operation with NGOs and local authorities were decisive. Co-design with communities and partners smoothed land transactions, built trust, and made implementation workable for a multi-owner landscape.

Where land purchase is unavoidable, map ownership early and plan time and budget for transactions. Ciobarciu mixed purchases with long leases; this reduced conflict but added administrative complexity that needs managing from the outset.

Increased water availability is a tangible livelihood gain. Continuous flow in the Old Jijia enabled kitchen-garden irrigation (and even some larger parcels), livestock watering, non-commercial fishing, and reed use—benefits that help keep local support.

The functional wetland strengthened an international migratory route for waterbirds. Monitoring confirmed high bird richness soon after flooding, but also showed sensitivity to water-level fluctuations—success depends on stable spring–early summer levels.

Operations and maintenance are critical. The 2008 drawdown caused by an outlet malfunction disrupted the breeding season; clear operating rules, reliable structures, and seasonal targets (keeping adequate water through at least May–mid-July) are essential.

Monitoring should be built in and shared. Universities in Iași joined planning, monitoring, and evaluation, creating local capacity and a feedback loop for adaptive management (birds, water regime, water quality).

The project contributed to the development and implementation of sound nature and water policy. Embedding the site within wider Jijia floodplain planning and protected-area frameworks helps sustain outcomes and facilitates future reconnection works.

Financing remains a constraint. Even strong early results can stall without long-term budgets for O&M, monitoring, and follow-up works; replication requires predictable funding and institutional commitment.
Barriers
Barrier type Barrier role Comments
Lacking financing sources Main barrier Situation after 5 years showed that there were no funds for creating other wetlands, and the Ciobarciu wetland had not been functioning for two years due to construction works (e.g. beginning of June 2008 the water was lost through the outlet junction Ciobarciu). The absence of water in this period had been a disaster for the biodiversity of the area.
Market failures Main barrier Administrative difficulties in the process of land purchase, due to "fuzzy property" issues. (At the end 75% of the intended 250 ha wetland was either purchased (60%) from the local landowners or was leased with a long-lease contract (15%). 25% cannot be bought.
Drivers
Driver type Driver role Comments
Balancing different objectives Main driver To develop ecological restoration measures which can lead to a win-win situation, profitable not only for nature, but also for the population in the area and what is socially acceptable
Success factors
Success factor type Success factor role Comments
Financing possibilities Main factor Without funding from the PIN-MATRA program. the project would have been financially not feasible. If no subsidy would have been received, Apele Romane would have tried to restore water flow in the Old Jijia, but the Costuleni Wetland Project would have not been carried out.Situation after 5 years showed that there were no funds for creating other wetlands.
Attitude of decision makers Main factor The mayors have been very much involved, both in the meetings and also in bilateral visits. They also participated in the Advisory Committee meeting.
Public participation Main factor local people have been invovled in different ways and at different stages
Existing staff and consultant knowledge Secondary factor personal motivation and dedication of all the team members contributed to the success
Communication activities Secondary factor —
Transferability
The project results and relations developed were used as input for other projects and for new project proposals in the framework of the Dutch-Romanian collaboration.
Conditions :
Technical conditions (e.g. availability of water for the wetland),
Social conditions (acceptance of the project by the people and the authorities);
Organisation conditions (willingness of authorities, sufficient capacity available for implementation, an organization capable to manage the wetland in the future)
Financial conditions (for the purchase of land, planning of the project and implementation of the works)
Basin characteristics influence
Quietness and openness of large parts of the floodplains and the absence of roads and buildings.