Summary
The Danube Delta Biosphere Reserve Authority’s Fortuna Wetland Restoration Project reconnected the 2,115-ha agricultural polder “Fortuna” to the Danube, restoring the hydrological regime and functions (works completed in 2004). Since then, restoration has scaled up across the Șontea–Fortuna complex. In 2015–2017, the EEA-funded RESTORATION-DD project dredged 13.56 km of secondary channels to re-establish habitat connectivity and migration routes, with monitoring and outcomes reported for c.7,000 ha within the 24,636-ha hydrographic unit. From 2021 onward, ARBDD is implementing a multi-site POIM project (SMIS 2014+ 120889) to improve hydrological conditions in Șontea–Fortuna, Matița–Merhei and Somova–Parcheș; planned works include the Fortuna Canal (5,176 m) among other links, with public communications indicating ~156 km of channels across the complexes. In 2024, environmental procedures were filed for desilting Lakes Fortuna and Uzlina, signalling continued management of water circulation and eutrophication control.
Photo gallery
Overview
Protect and maintain populations of species and habitats of high ecological value.
Carry out restoration works where the natural/semi-natural character had been lost.
Manage water circulation to improve ecological conditions (e.g., re-establishing connectivity and flow patterns).
Assess the effectiveness of existing buffer zones and recommend modifications if needed.
| Authority type | Authority name | Authority role | Comments | Authority responsibility |
|---|---|---|---|---|
| National water authority | Danube Delta National Institute for Research and Development Tulcea - Romania | Other | 2004: research, design, monitoring support. 2015–2017: project promoter of EEA-funded RESTORATION-DD (dredging 13.56 km of secondary channels; 9 pre/post restoration studies, GIS databases). | Responsible |
| National water authority | The Danube Delta Biosphere Reserve Authority | Implementation | 2004 works: civil works / implementation of the Fortuna reconnection. 2019–2025: beneficiary/implementer of the hydrotechnical POIM project (SMIS 120889) across Șontea–Fortuna etc.; filed environmental screening for desilting Lakes Fortuna & Uzlina; leads ongoing maintenance (channel desilting/re-calibration). | Responsible |
| Research institute / University | RIZA- Lelystad, The Netherland | Monitoring | 2004 project partners for research/design/monitoring. | Supporting |
| NGO | WWF - Auen Institute, Rastatt, Germany | Monitoring | Research, design, monitoring | Supporting |
| National water authority | Romanian Ministry of Agriculture, Forests, Waters and Environment Romania | Financing | — | Supporting |
| Other | World Bank | Financing | Managing Agency, Financing | Supporting |
| Local water authority | Tulcea County Council | Other | — | Supporting |
| Farmers | Local stakeholders - the professional fishermen | Other | Project-Affected people | Supporting |
Site Information
Design and Implementation
Financing
Fortuna reconnection works (2004) – “original” NWRM case : reconnection of Polder Fortuna (2,115 ha)No public figure
RESTORATION-DD (EEA Grants, 2015–2017)
Final project cost: €1,322,185. EEA Grants contribution: €1,123,857. (Implied co-financing difference: €198,328
1994–2000 enabling project (incl. early polder work): US $4.50 m total — US $4.30 m GEF/World Bank, US $0.20 m Romania.
2004 Fortuna reconnection: no public cost found; financiers named (Ministry + World Bank).
2015–2017 RESTORATION-DD: €1,322,185 total — €1,123,857 EEA Grants (+ €198,328 other co-finance not detailed on the public page).
2019–2023 POIM SMIS 120889 (covers Sontea-Fortuna among complexes): RON 35,910,901.99 total — at least RON 30,524,266.72 ERDF and RON 538,486.60 state budget documented; remainder/beneficiary share unclear in public pages.
Policy and Governance
| Wider plan type | Wider plan focus | Name | Comments |
|---|---|---|---|
| Local | Environment & Biodiversity | The Rehabilitation Programme | Wetland Restoration Projects |
| — | Environment & Biodiversity | Danube Delta Biodiversity Project | — |
Impacts and Monitoring
Monitoring System
Maintenance
Socio-economic Impacts
Direct livelihood benefits listed for this site: fish yield, reed harvest, tourism, cattle.
Tourism use of the area: county materials present Lake Fortuna as a bird-watching/fishing destination on standard routes
Biophysical impacts: Hydrology
~13.5 km of secondary channels were dredged; channel bottoms changed from about +1.0 m a.s.l. (in some sectors) to −1.5 to −2.0 m a.s.l. (per design), improving flow conveyance.
Biophysical impacts: Biodiversity
Biophysical impacts: Water & Soil Quality
Biophysical impacts: Others
Lessons Learned
Hydrological restoration is not “one-and-done.” The NWRM file flags that the restored area was not self-sustaining; subsequent programmes show recurring desilting and channel calibration (e.g., 2024–2025 works on Lakes Fortuna and Uzlina) to keep circulation and water levels within targets.
Evidence-led, adaptive management adds value. The EEA RESTORATION-DD phase produced 9 pre/post studies, GIS databases and a success-evaluation report, enabling adjustments and policy advice tied to ecosystem services.
Clear governance and financing pathways matter. The NWRM page records barriers—fragmented ownership/administration and weak inter-agency coordination—while later phases unlocked external windows (EEA Grants; ERDF/POIM) and international partnerships (DDNI–NINA) that helped scale work across the Șontea–Fortuna complex.
Design for low-water conditions is critical in the Delta. Works explicitly targeted restoring connectivity and migration routes under low Danube levels, a recurring stressor for cut-off lakes like Fortuna.
| Success factor type | Success factor role | Comments |
|---|---|---|
| Successful coordination between authorities | Main factor | A strong institutional anchor (ARBDD as implementer; DDNI as science lead) with defined roles. |
| Financing possibilities | Main factor | Dedicated external funding windows (EEA Grants; ERDF/POIM) to finance works beyond the initial site. |
| Conducted assessments (incl. economic) | Main factor | Robust pre/post monitoring and GIS mapping to steer adaptive management and inform policy. |
| Conducted assessments (incl. economic) | Secondary factor | Commitment to ongoing maintenance (recent desilting proposals for Lakes Fortuna & Uzlina). |