Fortuna Restoration Project in the Danube Delta, Romania

Résumé

Summary

The Danube Delta Biosphere Reserve Authority’s Fortuna Wetland Restoration Project reconnected the 2,115-ha agricultural polder “Fortuna” to the Danube, restoring the hydrological regime and functions (works completed in 2004). Since then, restoration has scaled up across the Șontea–Fortuna complex. In 2015–2017, the EEA-funded RESTORATION-DD project dredged 13.56 km of secondary channels to re-establish habitat connectivity and migration routes, with monitoring and outcomes reported for c.7,000 ha within the 24,636-ha hydrographic unit. From 2021 onward, ARBDD is implementing a multi-site POIM project (SMIS 2014+ 120889) to improve hydrological conditions in Șontea–Fortuna, Matița–Merhei and Somova–Parcheș; planned works include the Fortuna Canal (5,176 m) among other links, with public communications indicating ~156 km of channels across the complexes. In 2024, environmental procedures were filed for desilting Lakes Fortuna and Uzlina, signalling continued management of water circulation and eutrophication control.

Photo gallery

Vue d'ensemble
Year of issue
2025
Project
NWRM
Implementation status
Completed
Contact
Bogdan Barbu, RECImola Koszta, REC
Location of the project
In the Șontea–Fortuna lacustrine complex (Tulcea County), west-central Danube Delta, between the Sulina (south) and Chilia (north) branches; near Tulcea.
Country
Romania
NUTS2 Code
Sud-Est
Sponge measures implemented in the case study
Re-meandering
Elimination of Grey River Bank Protection
Reconnection of oxbow lakes and similar features
Wetland restoration and management
Objectives
Reconnect the 2,115-ha “Fortuna” agricultural/forestry polder to the Danube regime to restore the natural hydrological regime and functions.
Protect and maintain populations of species and habitats of high ecological value.
Carry out restoration works where the natural/semi-natural character had been lost.
Manage water circulation to improve ecological conditions (e.g., re-establishing connectivity and flow patterns).
Assess the effectiveness of existing buffer zones and recommend modifications if needed.
Involved partners
Authority typeAuthority nameAuthority roleCommentsAuthority responsibility
National water authorityDanube Delta National Institute for Research and Development Tulcea - RomaniaOther2004: research, design, monitoring support. 2015–2017: project promoter of EEA-funded RESTORATION-DD (dredging 13.56 km of secondary channels; 9 pre/post restoration studies, GIS databases).Responsible
National water authorityThe Danube Delta Biosphere Reserve AuthorityImplementation2004 works: civil works / implementation of the Fortuna reconnection. 2019–2025: beneficiary/implementer of the hydrotechnical POIM project (SMIS 120889) across Șontea–Fortuna etc.; filed environmental screening for desilting Lakes Fortuna & Uzlina; leads ongoing maintenance (channel desilting/re-calibration).Responsible
Research institute / UniversityRIZA- Lelystad, The NetherlandMonitoring2004 project partners for research/design/monitoring.Supporting
NGOWWF - Auen Institute, Rastatt, GermanyMonitoringResearch, design, monitoringSupporting
National water authorityRomanian Ministry of Agriculture, Forests, Waters and Environment RomaniaFinancing—Supporting
OtherWorld BankFinancingManaging Agency, FinancingSupporting
Local water authorityTulcea County CouncilOther—Supporting
FarmersLocal stakeholders - the professional fishermenOtherProject-Affected peopleSupporting
Site Information
Climate Zone
Warm temperate dry
Precipitation
400.00 mm
Temperature (°C)
11.20 °C
Elevation range
12
Vegetation class
Reedbeds (Phragmites australis) dominate marsh vegetation across the Danube Delta, including the Sontea–Fortuna area, with adjacent aquatic macrophytes in lakes.
WFD Ecological status
Good
WFD Chemical status
Good
Water quality status
Delta-wide reports note water-quality deterioration and eutrophication pressures.
Design and Implementation
Project scale
Micro
Project scale specifications
The original case study targets a single site - the 2,115-ha Fortuna polder - reconnected to the Danube to restore its hydrological regime (works completed in 2004). That’s a localized hydromorphological intervention within the Șontea–Fortuna complex.
Project area
2115
Area subject to Land use change or Management/Practice change (ha)
2115.00 ha
Principles
Hydrotechnical measures tailored to maintain connectivity at low water (e.g., dredging 13.56 km of secondary channels).
Constraints
The villagers in Gorgova have strongly opposed the measure of closing channels leading to the Lake Fortuna, because it makes access by boat more difficult for them.
Financing
Total cost information
Early restoration framework (Danube Delta Biodiversity Project, 1994–2000) : US $4.50 million. Financing: GEF/World Bank US $4.30 m; Government of Romania US $0.20 m.
Fortuna reconnection works (2004) – “original” NWRM case : reconnection of Polder Fortuna (2,115 ha)No public figure
RESTORATION-DD (EEA Grants, 2015–2017)
Final project cost: €1,322,185. EEA Grants contribution: €1,123,857. (Implied co-financing difference: €198,328
1994–2000 enabling project (incl. early polder work): US $4.50 m total — US $4.30 m GEF/World Bank, US $0.20 m Romania.
2004 Fortuna reconnection: no public cost found; financiers named (Ministry + World Bank).
2015–2017 RESTORATION-DD: €1,322,185 total — €1,123,857 EEA Grants (+ €198,328 other co-finance not detailed on the public page).
2019–2023 POIM SMIS 120889 (covers Sontea-Fortuna among complexes): RON 35,910,901.99 total — at least RON 30,524,266.72 ERDF and RON 538,486.60 state budget documented; remainder/beneficiary share unclear in public pages.
Financing authorities
Authority nameType of funding
World BankOther
Romanian Ministry of Agriculture, Forests, Waters and EnvironmentNational funds
Compensations
Non
Policy and Governance
Land ownership
Public domain of county interest administered by Tulcea County Council
Policy targets
Improved Biodiversity
Oher Societal Benefits
Part of a wider plan
Oui
Wider plan
Wider plan typeWider plan focusNameComments
LocalEnvironment & BiodiversityThe Rehabilitation ProgrammeWetland Restoration Projects
—Environment & BiodiversityDanube Delta Biodiversity Project—
Public consultation
Non
Has contractual arrangements
Non
Impacts and Monitoring

Monitoring System

Monitoring requirements
Periodic, seasonally tuned campaigns should capture hydrological, physico-chemical (pH, N, P) and biological data on Fortuna and connected channels, with outputs integrated in GIS/habitat-status assessments to support management decisions.
Monitoring parameters
Water-level/flow monitoring on the Danube branches and on the feeding/drainage channels of Lakes Fortuna and Uzlina, alongside water-quality indicators—pH, inorganic nitrogen, orthophosphate, total phosphorus—and biological components such as zooplankton

Maintenance

Maintenance requirements
Ongoing desilting and channel re-calibration led by ARBDD—e.g., Canal Fortuna 5.176 km and Gârla Șontea 11.949 km—plus a 2024 desilting project for Lakes Fortuna and Uzlina.

Socio-economic Impacts

Direct benefits information
Closing some access channels from Gorgova/Maliuc reduced boat access to Lake Fortuna, increasing travel time/costs and creating local conflict (reported as a social/operational impact during the restoration context).
Direct livelihood benefits listed for this site: fish yield, reed harvest, tourism, cattle.
Tourism use of the area: county materials present Lake Fortuna as a bird-watching/fishing destination on standard routes

Biophysical impacts: Hydrology

Information on retained water
Connectivity restored (2004 core project; 2015–2017 extension): Re-established links between the polder/lakes and the main channel network, explicitly to secure connectivity even at low Danube water levels and to reopen migration routes for aquatic species.
~13.5 km of secondary channels were dredged; channel bottoms changed from about +1.0 m a.s.l. (in some sectors) to −1.5 to −2.0 m a.s.l. (per design), improving flow conveyance.

Biophysical impacts: Biodiversity

Improved biodiversity
Oui
Information on improved biodiversity
- Habitat for plants and animals typical alluvial areas; - Habitat and breeding area for fish and aquatic birds; - Reservoir for biodiversity and providing genetic resources; - Biocoridor and genetic exchange; restoration of ~7,000 ha of fragmented wetland within the 24,636-ha Șontea–Fortuna unit; connectivity of habitats and migration routes restored under low-water conditions; conservation state restored for 7 aquatic habitat types (1 priority); and improved conservation status for >5,000 wild species

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Positive impact-WQ improvement
Information on water quality overall
Retention of sediments and pollutions; Black Sea biofilter.
Soil quality overall improvements
Positive impact-SQ improvement
Information on soil quality overall improvements
Organic production; Biogeochemical circuit elements

Biophysical impacts: Others

Ecosystem impact climate regulation
No information available
Lessons Learned
Key lessons
Local support is decisive. The initial reconnection reduced boat access from Gorgova/Maliuc to Lake Fortuna, raising costs and sparking conflict; future designs must co-create access solutions with residents.
Hydrological restoration is not “one-and-done.” The NWRM file flags that the restored area was not self-sustaining; subsequent programmes show recurring desilting and channel calibration (e.g., 2024–2025 works on Lakes Fortuna and Uzlina) to keep circulation and water levels within targets.
Evidence-led, adaptive management adds value. The EEA RESTORATION-DD phase produced 9 pre/post studies, GIS databases and a success-evaluation report, enabling adjustments and policy advice tied to ecosystem services.
Clear governance and financing pathways matter. The NWRM page records barriers—fragmented ownership/administration and weak inter-agency coordination—while later phases unlocked external windows (EEA Grants; ERDF/POIM) and international partnerships (DDNI–NINA) that helped scale work across the Șontea–Fortuna complex.
Design for low-water conditions is critical in the Delta. Works explicitly targeted restoring connectivity and migration routes under low Danube levels, a recurring stressor for cut-off lakes like Fortuna.
Barriers
Barrier typeBarrier roleComments
OtherSecondary barrierFrom a local benefits perspective, villagers in Gorgova have strongly opposed the measure of closing channels leading to the Lake Fortuna, because it makes access by boat more difficult from them.
Lacking coordination between authoritiesMain barrierLand "ownership" (too many administrators); legal framework; lack of money; lack of coordination (national level); lack of vision; lack of co-operation.
Attitude of decision makers——
OtherSecondary barrierRestored area not self sustaining;
Success factors
Success factor typeSuccess factor roleComments
Successful coordination between authoritiesMain factorA strong institutional anchor (ARBDD as implementer; DDNI as science lead) with defined roles.
Financing possibilitiesMain factorDedicated external funding windows (EEA Grants; ERDF/POIM) to finance works beyond the initial site.
Conducted assessments (incl. economic)Main factorRobust pre/post monitoring and GIS mapping to steer adaptive management and inform policy.
Conducted assessments (incl. economic)Secondary factorCommitment to ongoing maintenance (recent desilting proposals for Lakes Fortuna & Uzlina).
Transferability
Transferable : Highly transferable to deltaic/floodplain polders with altered connectivity. Success hinges on clear governance and funding, robust pre-/post-monitoring, and designs that maintain flows at low water. Proceed with care on local navigation/access needs, permitting and land administration, and plan for recurrent maintenance (desilting/channel calibration) to avoid stagnation and eutrophication.