Horstergrub sediment management, Belgium

Summary

Summary

Upstream of ’s-Gravenvoeren (Voeren), the Horstergrub measure keeps muddy runoff in the valley with an earthen dyke/dams, and farmland was shifted from maize to grassland to curb erosion. Within the cross-border Aquadra programme (2009–2013), works were delivered: in Dec 2012 an earthen dam and two erosion ponds were built in the Horstergrub to trap water and sediment before it reaches the village. The Horstergrub is a dry valley that only flows during rain; Voeren’s 2023/24 Hemelwater & Drought Plan lists an existing “erosiebuffer op Horstergrub” (~30,600 m²). Since 2022–2024, the Dutch water board notes standard-compliance issues on the Horstergrub in Mheer and is developing a new rainwater buffer near the border at Pletsgatweg (Mesch), in coordination with VMM, with a throttled outlet to limit peaks. Together, these actions complement the original NWRM goal of slowing runoff and reducing sediment delivery to ’s-Gravenvoeren, while addressing today’s cross-border flood-risk needs.

Photo gallery

Overview
Year of issue
2025
Project
NWRM
Contact
Heather Williams and Chris Binje, AMEC
Location of the project
The site is located in a rural location on the Horstregrub stream, upstream of the village of Gravenvoeren. It is located in the catchment of the River Voer, which is itself a tributary of the Meuse.
Country
Belgium
NUTS2 Code
Prov. Limburg (BE)
Sponge measures implemented in the case study
Ponds and scrapes
Meadows and pastures
Objectives
Retain mud/erosion consequences by a horizontal dyke/dam and ponds at the valley bottom to hold water longer, reduce runoff & sediment toward downstream villages, and convert maize to grassland upstream; storage ~6,000 m³.
Involved partners
Authority typeAuthority nameAuthority roleComments
OtherProvince of LimburgOtherThe Belgian province of Limburg
OtherWROOtherThe WRO (Waterschap Roer en Overmaas) is the local water authority on the Dutch side of the border. Although not directly involved, RWO Was responsible for a different pilot project upstream on the Horstergrub, also contributing to decreasing the flood risk.
Other—Initiation of the measureThe local community of Voeren was involved as a full partner, initiating and financing the NWRM and appointing the VMM as executional officer of the program. The community of Voeren was furthermore involved in the entering into compensation agreements with local farmers.
Regional / sub-national water authorityVMMImplementationVMM was appointed as the executing agent of the project, including the detailed design.
Site Information
Climate Zone
Cool temperate moist
Precipitation
800.00 mm
Temperature (°C)
10.00 °C
Elevation range
92 m
Slope range
5-10%
Vegetation class
Hilly grasslands. At the wider Voerstreek Natura 2000 site, land use is dominated by agricultural areas (significant cropland/grassland) with large patches of deciduous woodland on valley slopes (≈42% of the SBZ area in the forest inventory).
WFD Ecological status
Poor
WFD Chemical status
Failing to achieve good
Water quality status
Key pressures in the Voer sub-basin: diffuse agricultural pollution & sediment (erosion/mudflows) and incomplete sanitation, with several reaches rated moderate–insufficient; sanitation & erosion control are priorities.
Design and Implementation
Project scale
Micro
Project scale specifications
It’s a site-specific intervention in one dry valley branch (Horstergrub): an earthen dyke/dam with two erosion ponds plus land-use change on nearby fields.
Constraints
There are no specific constraints to the application of this measure type, which is a simple method of runoff capture.
The Horstergrub is a dry valley (not a classified watercourse) that conveys intense runoff during rain and points directly toward the village hence repeated water/mud problems.
Financing
Total cost
55000.00 €
Costs investment
55000.00 €
Financing authorities
Authority nameType of funding
Commune of VoerenLocal funds
Compensations
Yes
Compensations basis information
In order to receive the necessary subsidies from the Flemish authorities, the agreements still have to be approved by the municipal council.
Compensations scheme information
Some compensation was agreed with the landowner to change the landuse to pasture. Compensation was provided to local farmers in exchange for maintaining the areas surrounding the established grassed buffer zones.
Policy and Governance
Policy description
In the area of the project a lot of erosion happens during heavy rainfall events. As there is no natural stream or other way of transporting rainwater away, surface runoff occurs over the area, causing mudstreams or floodings in the village downstream. Measures to prevent this from occurring were therefore needed.
Land ownership
Private farmland. Works were built under an agreement with the landowner (compensation for converting maize to grassland); Commune of Voeren initiated/financed and appointed VMM to execute.
Policy targets
Erosion Control
Runoff control
Part of a wider plan
Yes
Wider plan
Wider plan typeWider plan focusNameComments
RegionalWaterAquadraAquadra had as a purpose to strive for clean water conditions across regional and national borders. Partners in the project included the Dutch and Belgians provinces of Limburg, province of Liege, regional water authorities from these 3 provinces and the German city of Aachen.
Public consultation
No
Has contractual arrangements
No
Impacts and Monitoring

Monitoring System

Monitoring requirements
Multiple organizations, including the Province of Limburg, the Flemish Environment Agency (VMM), and local municipalities, are involved in overseeing the implementation and monitoring of these measures.
Monitoring parameters
Regular visual assessments are conducted to identify any signs of structural damage, sediment accumulation, or vegetation issues in the erosion control structures, such as the retention ponds and dikes.

Impact Assessment Methodology

Performance impact assessment method
Unknown

Biophysical impacts: Hydrology

Information on retained water
6000 m3 total storage volume
Information on increased water storage
6000 m3 total storage volume, compared to zero previously

Biophysical impacts: Biodiversity

Improved biodiversity
Yes
Information on improved biodiversity
The landuse upstream has been changed from crops to grassland, which allows an increase in diversity compared to the previous land use.

Biophysical impacts: Water & Soil Quality

Water quality overall improvements
Positive impact-WQ improvement
Information on water quality overall
Reduction in transfer of sediment and associated nutrients or other pollutants downstream, by allowing sediment deposition in the storage area
Soil quality overall improvements
Positive impact-SQ improvement
Information on soil quality overall improvements
The Voeren area is an area with significant erosion problems, causing mudstreams in the center of the village of Gravenvoeren. As a result of this NWRM, less good quality soil will be eroded and transported downstream.
Ecosystem erosion control
Yes
Information on ecosystem erosion control
Not quantified

Biophysical impacts: Others

Ecosystem impact climate regulation
Not relevant for the specific application
Lessons Learned
Key lessons
Low-cost measures can make a significant local improvement to runoff and sediment load problems.
Drivers
Driver typeDriver roleComments
Past flooding eventsMain driverPast flooding events have occurred in the village of Gravenvoeren
Transferability
Highly transferable to small, erosion-prone headwaters with dry valleys (“holle wegen”) and arable slopes, common across Flanders, Wallonia, the Netherlands, and similar loess landscapes. But success hinges on sizing, outlet control, land agreements, and maintenance.
Sources